MATERIAL SUBMITTAL (MS)

PROJECT: PIOUS RING SCHOOL CONSTRUCTION PROJECT


MS Ref No: Contractor:
Area Name: Date: Rev No:
Discipline of Material Submittal
Architectural Civil Electrical Mechanical ID Other

Material Description:

Area of Use:
Bill of Quantity Ref:
Specification Ref.:
IF Drawing Reference:
Required: Same
Company
Submitted: Different
Required: Same
Material Model
Submitted: Different
Required: Same
Material Size
Submitted: Different
Material Required: Same
Finish / Color Submitted: Different
Attachments:
Submitted By. (Contractor)

Name Position Signature Date


Review/Comments (Engineer)

Name Position Signature Date


Approval Status (For Engineer)
Approved Approved with Revise and Rejected Information
(A) Comments (B) Resubmit (C) (D) Only (E)

Name Position Signature Date