Draft TOR: Formulation of the Philippine Transportation Master Plan

Terms of Reference
FORMULATION OF THE PHILIPPINE TRANSPORTATION SYSTEM MASTER PLAN

1. BACKGROUND/RATIONALE

1.1. The Philippine Development Plan (PDP) 2017-2022 puts emphasis on the
important role of the transportation sector in facilitating the movement of people,
goods and services in support of the performance of other productive sectors and
in the provision of equitable access to basic services. The construction of transport
facilities is deemed one of the major drivers of accelerated infrastructure spending
given the large investments required for transport systems like toll roads and
tunnels, railways, airports, and sea ports, among others. The challenge for the
sector, however, is the lack of a central reference document that unifies the results
of various transport-related plans formulated for the respective transport sub-
sectors, i.e., roads and bridges, railways, civil aviation, maritime and urban
transport, by entities from both the national and local levels of Government. With
the increasing demand for transport services, it is imperative that the Government
ensure that transport projects are strategically built and operated to complement
each other within an interconnected network of multimodal systems.

1.2. The National Transport Policy (NTP) intends to guide all transport-related
agencies in pursuing policy decisions and future investments by setting the
parameters for planning at the agency level whose outputs shall be evaluated and
approved on the basis of their compliance and consistency with such policy. The
formulation of a comprehensive transport master plan on a nationwide scale is one
of the strategies espoused in the NTP particularly to ensure a holistic and
evidence-based program/project selection process.

1.3. In this regard, the NEDA shall engage services of the Consultants to formulate a
Philippine Transportation System Master Plan (PTSMP), the results of which, (i)
will be used by the NEDA – Investment Coordination Committee (ICC) in the
evaluation/appraisal of transport infrastructure projects, particularly in ensuring
that plans and projects are well-prepared from a network perspective; (ii) will be
used by implementing agencies to guide the respective planning and programming
exercises; and (iii) will be used as reference by stakeholders in other productive
sectors, e.g., implementing agencies, private sector, etc., in preparing their
respective sector development plans and programs.

2. OBJECTIVE OF THE STUDY

2.1. The study aims to come up with a master plan, formulated based on a detailed
assessment of the existing national transport network and the results of a
comprehensive analysis of the gaps therein, to:

2.1.1. Guide the rational development of an intermodal transport network in the


country through coordinated planning and operation of projects and
programs as an integrated network of intermodal sub-systems; and

2.1.2. Promote sub-regional economic cooperation/agglomeration and utilization


of multimodal transport system for more efficient connectivity between
industrial/production areas, major cities, and rural areas in line with the

Page 1 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

Government’s direction to decentralize development away from highly


urbanized cities and metropolis.

2.2. The study also aims to enhance the capacity of NEDA and other concerned
agencies/institutions on the various transport planning tools and techniques,
especially those employing new technology, through training workshops.

3. SCOPE OF WORKS

3.1. Master Plan Formulation

The Consultant shall undertake the following:

3.1.1. Review past and current transport sector studies, feasibility studies, master
plans, pertinent policies and other interventions at the national and local
levels. Examples of such documents are, but not limited to:

(a) Roadmap for Transport Infrastructure Development for Metro Manila


and Its Surrounding Areas (Regions III and IV-A);
(b) The Study on Master Plan on High Standard Highway Network
Development in the Republic of the Philippines;
(c) The Roadmap Study for Sustainable Urban Development in Metro
Cebu;
(d) Urban Transport Master Plan Study for Metro Cebu;
(e) Survey on Mindanao Logistics Infrastructure Network;
(f) Davao City Infrastructure Development Plan and Capacity Building
Project;
(g) Master Plan Study on the Strategy for the Improvement of National
Airports in the Republic of the Philippines;
(h) National Logistics Master Plan;
(i) National Tourism Development Plan 2017-2022;
(j) National Spatial Strategy; and
(k) Comprehensive Land Use Plans.

3.1.2. Conduct an inventory of the country’s existing transport network in terms


of, among others, spatial distribution, physical infrastructure, including
current condition, traffic/demand (passenger and freight) served, operation
and maintenance (O&M), and regulation.

3.1.3. Analyze and forecast passenger and freight movements, i.e., through
origin-destination survey, etc., and formulate relevant baseline indicators,
e.g., transport cost/shipping cost, travel time, environmental impact, etc.

3.1.4. Identify critical bottlenecks in transport infrastructure development in


terms of, among others, quality, adequacy, efficiency, accessibility, safety,
and environmental and social aspects, as well as emerging issues and
challenges brought about by rapid urbanization, population growth, etc.

3.1.5. Assessment of critical path for successful implementation of projects,


taking into consideration technical, fiscal, socioeconomic, environmental,

Page 2 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

regulatory and legal aspects, and institutional and right-of-way (ROW)


matters.

3.1.6. Conduct of Value Engineering/Value Analysis (VE/VA) on the different


connectivity modes.

3.1.7. Guided by the NTP and aligned with the thrusts of the Government for
transport infrastructure development as embodied in the PDP, formulate
the Philippine Transport System Master Plan containing the results of the
foregoing activities and the corresponding recommended strategies and
action plans addressing the identified challenges.

3.1.8. Formulate a list of priority transport infrastructure projects, with


corresponding timing and resource requirements (investment and O&M
costs), that are needed to be implemented within the short- (until 2022),
medium- (2023 to 2028), and long-term (2028 to 2040) plan period and
conduct of Business Case/Pre-Feasibility Studies on the identified short-
term investments.

3.1.9. For better appreciation, submit Geographic Information Systems (GIS)-


based maps overlaying the proposed projects and the existing transport
network.

3.1.10. Conduct preliminary assessment of the impact of implementing the Master


Plan in terms of, among others, the transport sector indicators identified,
e.g., transport cost/shipping cost, travel time, environmental impact, etc, as
well as financial and economic viability.

3.1.11. Undertake intensive consultation with all stakeholders throughout the


conduct of the Study.

3.2. Transport Database

3.2.1. The Consultant shall put together all the data gathered and the analyses
undertaken thereof in a single database which shall be turned over to
NEDA at the end of the study period.

3.2.2. Regular updating of such database should be possible.

3.3. Reporting

3.3.1. Aside from the submission of Progress Reports following an agreed


schedule, the Consultant shall present the progress of the Study to NEDA
and other concerned agencies/institutions at the end of each semester.

3.3.2. Study updates and preliminary results will be presented to the Inter-
Agency Committee on Transport Planning (IATCTP) and the NEDA
Board Committee on Infrastructure (INFRACOM) upon request of NEDA,
as recommended by NEDA-IS.

Page 3 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

3.3.3. As scheduled, the Interim Report, Draft VE/VA Report and Draft Final
Report, the latter to be accompanied by an audio visual presentation and
other presentation media, will be presented to the IATCTP and
INFRACOM for review and subsequent endorsement, if warranted.

3.4. Training/Workshop

The Consultant shall conduct a training/workshop every semester in order to


train/capacitate NEDA Personnel and its counterparts (at least 20 personnel) on
the various planning tools, techniques and skill sets employed in the conduct of
the Study, including database management. A study tour/learning visit shall also
be conducted to expose the concerned government personnel to the experiences of
certain jurisdictions in implementing transport projects.

4. TIMELINES AND DELIVERABLES

4.1. Commencement Date and Period of Implementation

The engagement of the Consultant shall be for a period of twelve (12) months,
exclusive of capacity building training/workshops, commencing from the date of
receipt of the Notice to Proceed (NTP) or seven (7) days after the issuance of the
NTP, whichever is earlier. Refer to Annex 1 for the indicative timeline of the Study.

4.2. Deliverables

A detailed Work Financial Plan (WFP) shall be given by the Consultant to NEDA
for review within ten (10) days from the date of commencement as indicated in
the NTP.

The Consultant shall deliver to NEDA the following outputs in the form and
number indicated therein:

Output Timeline
Draft Inception Report indicating the Within one (1) month from contract
work plan and methodology/approach effectivity.
to be adopted in the conduct of the
Study [Five (5) hard copies and in
electronic form]
Draft Business Case Report on the Within seventeen (17) weeks from
identified short-term investment contract effectivity.
projects [Five (5) hard copies and in
electronic form]
Draft Interim Report including Within twenty-two (22) weeks from
preliminary output/s [Five (5) hard contract effectivity.
copies and in electronic form]
Monthly, starting from 1st month up
Progress Reports [Five (5) hard copies
and in electronic form] to 11th month, from contract
effectivity
Draft VE/VA Report including Within seven (7) months from
preliminary output/s [Five (5) hard contract effectivity.
copies and in electronic form]

Page 4 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

Output Timeline
Draft Final Report [Five (5) hard Within ten (10) months from contract
copies and in electronic form] effectivity.
Final Report [Ten (10) hard copies and Within twelve (12) months from
in electronic form] contract effectivity.

The Inception Report shall include, among others, the approved detailed WFP and
the description of the corresponding activities/programs of work/milestones
accomplished/fulfilled by the date of submission thereof, as well as the fulfillment
of the study conditions enumerated herein and/or the approaches and
methodologies to be used in the formulation of the master plan.

The Business Case Reports shall include, among others, the identified short-term
investment projects that are ready for implementation after the conduct of the
Master Plan.

The Interim Report shall include, among others, the status of implementation of
the study in relation to the scope of work and preliminary results of the study.

The Draft Final Report will consist of the completed master plan which will be
submitted to NEDA for final approval.

The Monthly Progress Reports shall include updates on the physical and financial
accomplishments of each activity under the WFP, e.g., consultation meetings and
trainings/workshops conducted, problems encountered and measures taken to
resolve them.

5. QUALIFICATION REQUIREMENTS AND SELECTION CRITERIA

5.1. A core consultant team (firm) with extensive local knowledge of the Philippine
economy, particularly of the Philippine transport sector, will take the lead in
undertaking the study and presenting the findings and recommendations to the
IATCTP and INFRACOM, and in all related stakeholder consultations. The core
team should have at least the following expertise:

5.1.1. Transport Infrastructure Development Expert (Team Leader)


- at least a Bachelor’s Degree, or its equivalent, in Engineering,
Economics, or related fields;
- minimum ten (10) years relevant experience in the transport sector with
at least 36 man-months of actual expert services as well as Team
Leader of at least three (3) projects of similar nature performed in the
last 20 years; and
- knowledgeable on VE/VA and have at least three (3) projects of work
experience related thereto in the last ten (10) years.

5.1.2. Urban/Regional Development Expert (Asst. Team Leader)


- at least a Bachelor’s Degree, or its equivalent, in Transport and
Regional Planning, Engineering, Economics or related fields;
- minimum eight (8) years relevant experience in urban development and
planning with at least 30 man-months of actual expert services as well

Page 5 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

as Deputy Team Leader or Team Leader of at least three (3) projects of


similar nature performed in the last 20 years; and
- ability to communicate at the level of the INFRACOM on a regular
basis.

5.1.3. Two (2) Transport Engineers


- at least a Bachelor’s Degree, or its equivalent, in Civil Engineering or
related fields;
- minimum seven (7) years relevant experience in transportation
engineering with at least 24 man-months of actual expert services; and
- with at least three (3) projects in infrastructure development of
transportation project performed in the last 20 years.

5.1.4. Two (2) Transport Economists


- at least a Bachelor's Degree, or its equivalent, in Economics, Finance,
or related fields;
- minimum seven (7) years relevant experience in
transport infrastructure economics with at least 24 man-months of
actual expert services; and
- with at least three (3) projects in economic modeling of transportation
projects performed in the last 20 years.

5.1.5. Two (2) Transport Financial Analysts


- at least a Bachelor's Degree, or its equivalent, in Finance, Economics,
or related fields;
- minimum seven (7) years relevant experience in
transport infrastructure finance with at least 24 man-months of actual
expert services; and
- with at least three (3) projects in financial modeling of transportation
projects performed in the last 20 years.

5.1.6. Institutional/Legal Specialist


- at least a Bachelor's Degree, or its equivalent, in Law, Public
Administration, Political Science or related fields;
- minimum seven (7) years relevant experience in
institutional/organizational analysis with at least 18 man-months of
actual expert services; and
- involved in at least three (3) transport projects as Institutional
Specialist performed in the last 20 years.

5.1.7. Two (2) Land Use Planning Specialists


- at least a Bachelor’s Degree, or its equivalent, in Transport and
Regional Planning, Engineering, Economics or related fields;
- minimum seven (7) years relevant experience in land use planning with
at least 18 man-months of actual expert services; and
- involved in at least three (3) transport projects as Land Use Planning
Specialist performed in the last 20 years.

Page 6 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

5.1.8. Land Use Mapping Specialist


- at least a Bachelor’s Degree, or its equivalent, in Geography,
Engineering or related fields;
- minimum seven (7) years relevant experience in land use mapping and
geographical information systems (GIS) with at least 18 man-months of
actual expert services; and
- involved in at least three (3) transport projects as Land Use Mapping
Specialist performed in the last 20 years.

5.1.9. Two (2) Environmental Assessment Specialists


- at least a Bachelor’s Degree, or its equivalent, in Engineering,
Environmental Science, Urban Planning, or related fields;
- minimum seven (7) years relevant experience in environmental
management and development. particularly in urban areas with at least
18 man-months of actual expert services; and
- involved in at least three (3) transport projects as environmental
assessment specialist performed in the last 20 years.

5.1.10. Two (2) Social Assessment Specialists


- at least a Bachelor’s Degree, or its equivalent, in Social Science,
Community Development, Anthropology or related fields;
- minimum seven (7) years relevant experience in sustainable
development and social growth with at least 18 man-months of actual
expert services; and
- involved in at least three (3) transport projects as social assessment
specialist performed in the last 20 years.

5.1.11. Other sector specialists may be mobilized to provide inputs to the core
team and the Consultant may also employ research assistant/s at his/her
own expense.

5.2. The Consultant shall be shortlisted based on the following criteria:


5.2.1. Experience1 and Capability of the Firm
5.2.2. Qualification of Organic personnel or Personnel who may be assigned to
the Study
5.2.3. Financial Capacity.

Eligible Consultants should pass the hurdle rate of 70 out of 100 points to be
considered shortlisted to participate in this procurement activity. The
points/weights of the criteria for shortlisting are shown in Annex B (Criteria for
Shortlisting).

5.3. Participating Consultants will be evaluated using the Quality-Cost Based


Evaluation/Selection (QCBE/QCBS) procedure under Republic Act (RA) No.
9184, or the Government Procurement Reform Act (GPRA), and its Revised

1
Similar experience refers to previous accomplishments/contracts with scope of works involving the
formulation of a master plan and/or other related studies/services relating to the transport infrastructure sector.
While, relevant experience, pertains to previous accomplishments/contracts with scope of works covering the
formulation of a master plan pertaining to the infrastructure sector in general as well as other transport
infrastructure sector related studies/services.

Page 7 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

Implementing Rules and Regulations (IRR) at 80% for the Technical Proposal
and 20% for the Financial Proposal.

6. RESPONSIBILITIES

6.1. Responsibilities of NEDA

6.1.1. Shall be the Executing Agency (i.e., representative of the Government in


the Contract Agreement with the Consulting Firm) as well as the
beneficiary/End-User of the consulting services;

6.1.2. Shall, through its NEDA Bids and Awards Committee (NBAC), be
responsible for facilitating the bidding and tendering of the consultancy
services following a public bidding mode of procurement in compliance
with RA 9184 and its Revised IRR;

6.1.3. Shall be responsible for the disbursement of the fund for the conduct of the
Master Plan formulation once the contract is executed. NEDA shall pay
the corresponding amounts due to the Consulting Firm as payments for
remuneration and reimbursable costs under the contract and in accordance
with the schedule under the TOR;

6.1.4. Shall be responsible for the preparation and submission of financial reports
as required by the Department of Budget and Management (DBM) and
other reportorial requirements;

6.1.5. Shall be responsible for contract implementation and management,


including ensuring the delivery and quality of outputs, evaluation of all
requests for payments/billings and determination of
acceptability/correctness of the same;

6.1.6. Shall provide assistance in coordinating with other agencies and related
stakeholders for the plan formulation;

6.1.7. Shall have the option to detail at least two (2) counterpart technical
personnel to the planning activity for the purpose of on-the-job capacity
building/technology transfer; and

6.1.8. Shall provide, upon the request of the Consulting Firm, available
information/data and also if available, copies of previous related studies
subject to the execution of the Confidentiality and Non-Disclosure
Agreement (CNDA), if necessary.

6.2. Responsibilities of the Consultant

6.2.1. Shall be working under the supervision of NEDA, and all related activities
relative to the conduct of the Master Plan formulation, and shall seek prior
consent from NEDA regarding the venue and program including target
participants of the consultation workshops including layout for printing of
the Master Plan;

Page 8 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

6.2.2. Shall conduct, during the contract period, coordination meetings with
NEDA and other stakeholders as necessary to: (a) discuss the progress of
the work and preliminary output; (b) give the Government the opportunity
to make comments and suggestions on a timely basis; and (c) resolve
problems and issues that may be encountered;

6.2.3. Shall be responsible for the conduct of the Study and the timely delivery of
results/outputs as indicated above;

6.2.4. Shall be responsible for the provision of necessary office space, which
shall be within close proximity to NEDA, for their project staff as well as
the Government’s detailed personnel, including necessary office
equipment (i.e., computer, printers, office supplies, etc.) for the conduct of
the plan formulation. All equipment procured for the development of the
project shall be transferred to the NEDA by the end of the project;

6.2.5. Shall shoulder all expenses required in the conduct of the Study, including
field participation of government counterpart staff and all other costs
related to the conduct of the Training/Workshop;

6.2.6. Shall: (a) carry out the services with theories and best practices to ensure
that the final works will provide the most economical and feasible
development plan for the transport sector; (b) accept full responsibility for
the consulting services to be performed under this TOR for which the
Consulting Firm is liable to NEDA; (c) perform the work in an efficient
and diligent manner and shall use its best effort to keep reimbursable costs
down to the possible minimum without impairing the quality of services
rendered; and (d) comply with, and strictly observe any laws regarding
workmen’s health and safety, workmen’s welfare, compensation for
injuries, minimum wage, hours of labor and other labor laws;

6.2.7. Shall: (a) keep accurate and systematic records and accounts in respect of
the Services in such form and detail as is customary and sufficient to
establish accurately that the costs and expenditures under this TOR have
been duly incurred; and, (b) permit the duly authorized representative/s of
the Government from time to time to inspect its records and accounts as
well as to audit the same;

6.2.8. Shall not assign nor sub-contract any part of the Services under this TOR
to any person of Firm, except with prior written consent of NEDA. The
approval by the Government to the assignment of any part of said Services
or to the engagement by the Consultant of sub-contractors to perform any
part of the same shall not relieve the Consultant of any obligations under
this TOR;

6.2.9. Shall, during or after the conclusion or termination of the plan formulation,
limit its role under the project to the provision of the services and hereby
disqualifies itself and any other contractor, consulting specialist or
manufacturer with which it is associated or affiliated, from the provision of
goods and services other than the services herein, except as NEDA may
otherwise agrees;

Page 9 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

6.2.10. Shall prohibit full-time foreign staff during his/her assignment under this
TOR to engage, directly or indirectly, either in his/her name, or through
the Consulting Firm, in any business or professional activities in the
Philippines other than the performance of his/her duties or assignment
under this TOR;

6.2.11. Shall accommodate at least two (2) counterpart personnel from the
Government (i.e., personnel from NEDA-IS), who shall be detailed to the
Project for the purpose of capacity-building and technology transfer. (The
Consulting Firm is not required to pay remuneration, honoraria nor
allowance to the Government counterpart staff, but will shoulder all
expenses attendant to their assigned tasks such as travel, accommodation,
meals, etc. on a reimbursable basis);

6.2.12. Shall not, at any time, communicate to any person or entity any
information disclosed to them for the purpose of this Services, nor shall
the Consultant make public any information as to the recommendations
formulated on the course of or as a result of the Services, except with prior
consent of NEDA;

6.2.13. Shall agree that nothing contained herein shall be construed as establishing
or creating between the Government and the Consultant, the relationship
of employer and employee or principal and agent, it being understood that
the position of the Consultant is that of an independent contractor; and,

6.2.14. Shall hold the Government free from any and all liabilities, suits, actions,
demands or damages arising from the death or injuries to persons or
properties, or any loss resulting from or caused solely by the Consultant’s
personnel incident to or in connection with the Services under this TOR.
The Consultant shall agree to indemnify, protect and defend at its own
expense the Government and its agents from and against all actions, claims
and liabilities arising out of acts done solely by the Consultant in the
performance of the Services, including the use of, violation of any
copyrighted materials, patented invention, article or appliance.

7. OWNERSHIP OF THE OUTPUTS/REPORTS/DOCUMENTS

7.1. All submitted outputs/reports/documents under this contract, including but not
limited to tracings, as-built drawings, estimates, digital information, computer
model and data, specifications, investigations and studies completed or partially
completed, inspection logs, and photographs, shall be the property of NEDA upon
completion of the work / full payment of the contract or termination of the
Agreement.

7.2. All equipment, materials, etc., acquired for the Study shall be turned over to
NEDA prior to the issuance of the Certificate of Completion and Acceptance.

Page 10 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

8. MODE OF PROCUREMENT AND APPROVED BUDGET FOR THE


CONTRACT (ABC)

8.1. The procurement of the Consulting Services required under this TOR shall be
executed in accordance with Republic Act (RA) No. 9184, otherwise known as the
Government Procurement Reform Act (GPRA) and its Revised Implementing
Rules and Regulations (IRR) following an open competitive selection process.

8.2. The ABC for the proposed Study is approximately ONE HUNDRED TWENTY
MILLION AND 00/100 PESOS (PhP120,000,000.00), inclusive of all
applicable government taxes and charges, professional fees, and other incidental
and administrative costs (i.e., transportation/travel expenses, printing,
reproduction and packaging of hard and soft copies of reports, expenses for
meetings, etc.). Attached as ANNEX C is the breakdown of the ABC.

8.3. Note that this Consulting Services contract shall be a fixed price contract. Any
extension of contract time shall not involve any additional cost to the
Government. Reimbursable costs items shall, however, be paid based on actual
costs incurred as supported by appropriate receipts or documents but shall not
exceed the amounts allocated therefor.

9. PAYMENT SCHEME/SCHEDULE

9.1. The monthly progress report shall be the basis for payment of reimbursable items.
Billing for the reimbursable items may be requested not more than once a month
based on the actual expenses incurred and supported by official
receipts/documents.

In the absence of official receipts/documents when claiming for reimbursable costs,


the Consulting Firm may also be allowed to submit a certification of actual
disbursements made under oath.

9.2. Billing for non-reimbursable items, including professional fees, shall be in


accordance with the following delivery schedule:

Upon acceptance of the Inception Report 10% of ABC


Upon acceptance of the Interim Report 30% of ABC
Upon completion of the VE/VA Report 10% of ABC
Upon acceptance of the Draft Final Report 30% of ABC
Upon acceptance of the Final Report 20% of ABC
100%

9.3. An advance payment shall be made to cover mobilization costs, but shall not
exceed 15 percent of the contract amount, subject to the posting of an irrevocable
standby letter of credit issued by an entity acceptable to NEDA and of an equal
amount to the advance payment. The advance payment shall be repaid by the
Consultant by deducting from his/her subsequent billings/payments such sum as
agreed upon during contract negotiations until fully liquidated within the duration
of the contract.

Page 11 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

10. RETENTION PAYMENT

10.1. A retention payment of 10 percent shall be withheld. It shall be based on the total
amount due to the Consultant prior to any deduction and shall be retained from
every progress payment until 50 percent of the value of Study, as determined by
NEDA, is completed. If, after 50 percent completion, the Study is satisfactorily
done and on schedule, no additional retention shall be made; otherwise, the 10
percent retention shall be imposed.

10.2. The total “retention money” shall be due for release upon approval of the Final
Report. The Consultant may, however, request the substitution of the retention
money for each progress billing with irrevocable standby letters of credit from a
commercial bank, bank guarantees or surety bonds callable on demand, of
amounts equivalent to the retention money substituted for and acceptable to
NEDA, provided that the project is on schedule and is satisfactorily undertaken.
Otherwise, the 10 percent retention shall be made. Said irrevocable standby letters
of credit, bank guarantees and/or surety bonds, to be posted in favor of NEDA
shall be valid for the duration of the contract.

11. LIQUIDATED DAMAGES

11.1. Where the Consultant refuses or fails to satisfactorily complete the work within
the specified contract time, plus any time extension duly granted and is hereby in
default under the contract, the Consultant shall pay NEDA for liquidated damages,
and not by way of penalty, an amount, as provided in the conditions of contract,
equal to at least one tenth (1/10) of one (1) percent of the cost of the unperformed
portion of the works for every day of delay. Should the amount of liquidated
damages reaches 10 percent of the contract amount, NEDA shall at its own
discretion terminate the contract without prejudice to any further action it may
take to recover whatever losses incurred due to the non-performance of the
Consultant.

11.2. To be entitled to such liquidated damages, NEDA does not have to prove that it
has incurred actual damages. Such amount shall be deducted from any money due
or which may become due the Consultant under the contract and/or collect such
liquidated damages from the retention money or other securities posted by the
Consultant whichever is convenient to NEDA.

Page 12 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

ANNEX A
Figure 1: Indicative Timeline

EXPECTED OUTPUTS M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Leveling Off Meeting/Work Plan
Draft Inception Report
Review of Draft Inception Report
Finalization of Inception Report
Progress Report
Conduct of Training/Workshop
Draft Business Case Reports
Review and Presentation of Draft Business Case
Reports
Finalization of Business Case Report
Draft Interim Report
Review and Presentation of Draft Interim Report
Finalization of Interim Report
Draft VE/VA Report
Review and Presentation of Draft VE/VA Report
Finalization of VE/VA Report
Draft Final Report
Review of Draft Final Report
Presentation of the Draft Final Report
Revision of the Draft Final Report
Submission of Final Report

Page 13 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

ANNEX B

Criteria for Shortlisting

Criteria/Particulars Firm
I. Experience and Capability of the Firm Max 50 points
a. Completed Contract/s for Similar Projects Max 50 points
b. Completed Contract/s for Relevant Projects Max 25 points
II. Qualification of Organic Personnel or Personnel 30 points
Who May Be Assigned to the Study*
a. Education 7.0 points
b. Relevant Training 3.0 points
c. Related Experience 20 points
i. Similar Experience Max 20 points
1. No. of Years 10 points
2. No. of Projects Completed 10 points
ii. Relevant Experience Max 10 points
III. Financial/Job Capacity 20 points
Grand Total 100 points
*Nominated personnel for the project shall submit a letter of commitment under oath that
services of said personnel shall be available for the study should the firm/consultant is
awarded the contract.

Page 14 of 15
Draft TOR: Formulation of the Philippine Transportation Master Plan

ANNEX C

Formulation of the Philippine Transportation System Master Plan


APPROVED BUDGET for the CONTRACT (ABC)

AMOUNT
PARTICULARS (PhP)

A. REMUNERATION 76,966,400.00
Transport Infrastructure Development Expert (Team Leader)
Urban/Regional Development Expert (Asst. Team Leader)
Two (2) Transport Engineers
Two (2) Transport Economists
Two (2) Transport Financial Analysts
Institutional/Legal Specialist
Two (2) Land Use Planning Specialists
Land Use Mapping Specialist
Two (2) Environmental Assessment Specialists
Two (2) Social Assessment Specialists
Four (4) Administrative Support

B. REIMBURSABLE EXPENSES 43,033,600.00


Professional Services
Surveys and Investigations
AVP Development
GIS/Mapping Services

Operations and Maintenance Costs


Project Office Rent
Utilities
Meetings
Office Supplies/Materials and Printing
Travel Expenses
Vehicle Rental
Communications
Trainings/Workshops
Miscellaneous and Other Fees
Capacity Building Visits

GRAND TOTAL 120,000,000.00

Page 15 of 15