0% found this document useful (0 votes)
40 views1 page

Load Bearing Wall Truss Specifications

Uploaded by

Jorge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views1 page

Load Bearing Wall Truss Specifications

Uploaded by

Jorge
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CAUTION!!!

52-04-00
DO NOT ATTEMPT TO ERECT
28-04-00 24-00-00 TRUSSES WITHOUT REFERRING TO
THE ENGINEERING DRAWINGS AND

1-02-08

10-08
7-00-00 24" O.C 7-00-00
BSCI-B1 SUMMARY SHEETS.

CJ01

CJ03

CJ05

CJ5A

CJ3A

CJ01
RAFTER TAILS PLACED IN FIELD ALL PERMANENT BRACING MUST BE
IN PLACE PRIOR TO LOADING

1A
HJ
01

HJ
TRUSSES. (ie. SHEATHING,

U: 2720

U: 1003
U: 1309

U: 1303

U: 1323

U: 1127

U: 1312
U: 1323

U: 1323

U: 1138

U: 1127
U: 1323

2-00-00
CJ01 CJ01 SHINGLES, ETC.)

2 PLY A21

A20

A19

A18

A17

A16

A15

A14

A13

A12

A09

A08

A07

A06

A05

A04
A03

A02

2 PLY A01
A10
A11
ALL INTERIOR BEARING WALLS

SCAB MATERIAL IN T.C

SCAB MATERIAL IN T.C

SCAB MATERIAL IN T.C


CJ03 CJ3A MUST BE IN PLACE PRIOR TO
FLAT CLG. INSTALLING TRUSSES.
10'-0"
CJ05 CJ5A
EXPOSED TO WIND REFER TO FINAL ENGINEERING

7-08-00
SHEETS FOR THE FOLLOWING.

U: 1752

U: 3949
U: 1543
U: 1532
J01 J1C
1) NUMBER OF GIRDER PLIES AND
NAILING SCHEDULE.
COFFER CLG.

U: 1443
U: 1417

U: 1643

U: 1718
U: 1859

U: 1657
J01 J1B

2-00-00
11'-0" LOAD BEARING WALL 2) BEARING BLOCK REQUIREMENTS.
6-00-00
J01 J01 3) SCAB DETAILS (IF REQUIRED)

2-00-00
LOAD BEARING WALL
4) UPLIFT AND GRAVITY REACTIONS.
J01 J1A

5/12
J01 J1A
WARNING
Backcharges Will Not Be Accepted
Regardless of Fault Without Prior

13-04-00
J01 J1A Notification By Customer Within 48
COFFER CLG.

37-00-00
Hours And Investigation By
11'-0" ProBuild.

13-08-00
J01 J1A NO EXECPTIONS.
The General Contractor Is Responsible
44-00-00

J01 FLAT CLG. COFFER CLG. J1A For All Connections Other Than Truss
10'-0" 11'-0" to Truss, Gable Shear Wall, And
Connections. Temporay and
J01 J1A
Permanent Bracing, And Ceiling And
Roof Diaphram Connections.

51-06-00
J01 9-00-00 J01
5/12 5/12

J01 11-04-00 J01 ROOF PITCH: 5/12


TOP CHORD: 2X4
J01 J01 OVERHANG: 16"
8-00-00

5/12
SQ. OR PLB. CUT: PLUMB
J01 12'-8" 1-00-00 J01
HARDWARE
FLOOR ROOF

5-10-00
J01 COFFER CLG. J01 NONE <A> HTU26= 13

1-00-00

1-00-00
13'-8" <C> HTU26-2= 1
<D> HTU28-2= 2

U: 1181
U: 1161

U: 1368
J01 J01

VT04
12'-8" 1-00-00
A A A C U: 1388
J01
76-08-00

D02
D U: 2741 2 PLY C03

VT08
5/12 5/12 1-09-00 BEARING HEIGHT SCHEDULE

2x LEDGER BY OTHERS
VT03
J01 FLAT CLG. D02 A C02
Hatch Legend

VT09
5/12 5/12
14'-6"
VT02

24" O.C
EXPOSED TO WIND
J01 D02 A C02 11'-0"
FLAT CLG.
U: 1312

U: 1046
U: 1296

U: 1296
U: 2769

U: 1132
U: 1148

U: 1148

U: 1148
U: 1158

U: 1163

U: 1148

VT01 10'-0" 14'-6"


J01 D01 A C01

5/12
1-00-00 D

3-00-00
A A A A A A A
10'-0"

HJ
04
CJ1A

04
R: 10071

HJ
R: 7662 3 PLY B06

5-00-00
1-03-08 U: 6777
U: 5464 CJ3B CJ03
CJ1A VT07
BUILDER:

CJ1A
B04
CJ1A

CJ03

CJ03
J4A 5/12 5/12

J4A

J4A

J03

J03

J03
CJ01
B04
CJ01 F02 SANCHEZ ENTERPRISE
GROUP LLC PIA 760634

CJ01

CJ01
HJ
02
F01

02
HJ

3-06-00
3-00-00
B04 8-00-00 8-08-00
ADDRESS: 1040 15TH STREET SW
6-00-00 7-10-00 CJ01 CJ01
LOT: N/A

CJ01

CJ01
B05

HJ
03

J04
J04
SUB: NAPLES

03
HJ
6-08-00 COUNTY: COLLIER
B05
5/12 5/12 13-04-00 PROJECT:
8-00-00

A/C SED336
IN STORAGE B05

MODEL:
B05 SED336
30-08-00
30-03-08

DRAWN BY: E.P.C


FLAT CLG. B05 NOTES: ENG BY: E.P.C
1) ALL DIMENSIONS ARE FEET-INCHES-SIXTEENTHS. JOB#
10'-0"
2) DO NOT CUT OR ALTER TRUSSES IN ANY WAY. 3200873
B04 3) ALL REACTIONS ARE UNDER 5000 LBS. UNLESS
DATE: 8/9/2022 SCALE: 1/4" = 1'
NOTED OTHERWISE.
B03
4) ALL UPLIFTS ARE UNDER 1000 LBS. UNLESS
NOTED OTHERWISE. REVISIONS:
5) FRAMING REQUIRED BELOW TRUSSES TO GET 1.
24" O.C

B02 DESIRED CEILING CONDITIONS. 2.


6) ONLY TRUSS TO TRUSS CONNECTIONS SUPPLIED 3.
U: 1538 U: 1538 W/ TRUSS PACKAGE. 4.
B01
5.
VERIFY ALL DIMENSIONS AND CEILING CONDITIONS PRIOR TO APPROVAL
SOME CEILING FRAMING REQUIRED IN FIELD BY BUILDER
5/12

CJ05 CJ05
VT06 MWFRS(Directional)/C-C HYBRID WIND ASCE7-16 / CODE FBC2020 IMPORTANT
7-00-00

ENCLOSED
5/12 5/12 This Drawing Must Be Approved And
CJ03
VT05
CJ03 EXPOSURE CATEGORY C
OCCUPANCY CATEGORY II Returned Before Fabrication Will
J2A

J2A
J02

J02
J02

J02

Begin. For Your Protection Check All


CJ01
E01
CJ01 LEFT GARAGE WIND LOAD 170 MPH
WIND IMPORTANCE FACTOR 1.00 Dimensions And Conditions Prior To
TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF BOTTOM CHORD Approval Of Plan.
CJ05
CJ01

CJ03

CJ05

CJ03

CJ01
HJ
01

LIVE LOAD NONCONCURRENT WITH ANY OTHER LIVE LOADS SIGNATURE BELOW INDICATES ALL
01
HJ

2-00-00
CJ01 CJ01
NOTES AND DIMENSIONS HAVE
ROOF LOADING FLOOR LOADING BEEN ACCEPTED.
CJ01

CJ01
HJ
05

J05

J05

J05

05
HJ

TCLL: 20 PSF TCLL: NA PSF 516 6th Ave. East


By __________________Date_______ Bradenton, FL 34208
9-04-00 TCDL: 10 PSF TCDL: NA PSF
BCDL: 10 PSF BCDL: NA PSF Ph. (941) 746-2161
23-00-00
TOTAL: 40 PSF TOTAL: NA PSF Fax (941) 306-4762
DURATION: 1.25 DURATION: 1.00
5 PSF TCDL + 5 PSF BCDL
USED TO RESIST UPLIFT DEPTH: