Part 1: Job Description: FEC Bulk Earthworks - Dumping, levelling, showering, Location: Front End Compression
rolling and compaction at FEC project ZGP
JRA Date: 17-02-2010 JRA No./ Revision: 10-003 JRA Leader: Cameron Leehane Scribe: Abdul Rasheed
Review Team: (e.g. Ops Review Team )M Ramzan, Muneer Ahmed, A Rasheed, Asif Al, Zulfiqar Ali, Noor Zaman, Abrar-ul-Hassan
List Associated Procedures/work instructions or Temporary WIs:
Hazard Check List (FRCP identified below must reference applicable FRCP Control Measures – refer to FRCP Handbooks)
Falls from Heights √Access / Egress Confined Space Manual Handling √ Fatigue/Over Exertion √ Slips, Trips & Falls
√ Competence of
Falling Objects √ Collisions √Noise Illumination Environmental
Personnel
Liquid/Gas Under √Flaring/Hydrocarbon
Oil/Chemical Flammable Materials Moving Machinery Electricity
Pressure Release
Surface Mobile
Ignition Source Light Vehicles
Corrosive Substance Chemical Exposure Naked Flames Equipment
(Sparks/Electrical) (FRCP)
(FRCP)
Hazardous Materials Equipment Other
Isolation Working at Heights Lifting Operations (please specify)
Management Safeguarding
(FRCP) (FRCP) (FRCP)
(FRCP) (FRCP)
Step
Hazard Hazard Effect Hazard Controls Controls Acceptable
Job Steps Use Checklist as a Guide to Injury/Damage or
No. Use Hierarchy of Controls/FRCP Control Measures Y/N
be Specific Environmental Effect
1 Mobilization of Un Inducted Peoples Hand / Only inducted and Medical fitted Yes
equipment and Eye Injury peoples should enter the working area
personnel Plant emergency Worker Emergency response requirements,
Dump trucks, situation unaware Emergency access, Muster Points and
for other relevant protocols shall be
grader, rollers access / reinforced during toolbox meeting by
water bowser. muster Project HSEC team member.
Un inspected Ensure that all equipment shall be
equipment inspected form Ops through vehicle
Risk to
, Simultaneous property / entry certificate
CONTROLLED DOCUMENT
Page 1 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
2 Dumping Soil Untrained driver / Risk to Licensed and familiarised person Yes
operator property operate the equipment
Persons Medically and physically fit
Dumpers movement Collision Dumper should be guided by banks
with man while entering the working area.
vehicle / While offloading the soil, ensure no
persons person within unloading zone
No vehicle reversing, only one way
movement
Dust
Inhalation Use of dust mask while offloading of
Personal dumpers
injury Be careful during open the dumper back
side strip and wearer mandatory hand
Hydrocarbon release gloves
Work under PTW, continuous gas
Explosion / testing monitoring
Lack of supervision fire
Competent persons can supervise the
Incident activity and present all the time during
Snake / other insect job
Fatality / Be aware of snake
injury
First aid kit available on site
Radio communication with CCR in case
of any emergency
CONTROLLED DOCUMENT
Page 2 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
3 Soil levelling Grader/front Damage / Grader should be guided by bank man Yes
loader injury at all times while levelling of soil
Persons Injury Ensure area is barricaded and non-
movement essential personal can not enter the
working area
Dust Use of dust mask
Inhalation
Noise Use ear plugs
Hearing
damage
Over speed Risk to Ensure drivers should be briefed about
property / speed limit and BHP traffic protocols in
persons Tool Box Talks
Explosion / Work under PTW, continuous gas
Hydrocarbon
fire testing monitoring
Lack of supervision
Incident Competent persons to supervise the
activity and present all the time during
Un inspected job
equipment Oil leakage
Ensure that equipment shall be
failure
inspected form Ops through vehicle
entry certificate
Snake Fatality / Be aware of snake
injury
First aid kit available on site
Radio communication with CCR in case
of any emergency
CONTROLLED DOCUMENT
Page 3 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
4 Soil compaction Roller , water bowser Injury/ Ensure valid BHP check list is available Yes
and showering damage Bank man to guide vehicles and plant at
Collision with other all times while moving inside of working
mobile area
plant/personnel Ensure no person within compaction
zone, appropriate roller shall be used for
each level of compaction
Water bowser to follow only one way
direction
Ensure safe distance between each
Injury vehicle
Ensure water spray in a manner which
Slip, trip should not create a slipping hazard
Ensure no person around water bowser
while moving/ spraying
One bunk man shall provide guidance to
Hearing the operator
damage
Use ear plugs
Noise
Competent persons will supervise the
Incident activity and present all the time during
Lack of supervision job
Commercial Gas Line - Follow backfill
and compaction process on the
attached drawing/sketch for the
protection of the manifold.
Damage to flow lines Gas release, shut
and gas manifolds Incoming flow lines - The incoming flow
down of facility lines will be protected by a fence
from collision by
earthmoving plant demarcating the boundary and the
setting in place of large one meter 13
concrete blocks set in place one meter
from the fence.
Process of back filling to be monitored
by FEC project team.
CONTROLLED DOCUMENT
Page 4 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal
Health, Safety & Environment
Petroleum Management System
5 Demobilization Poor house keeping Slip, Trip Permit holder to ensure that area is Yes
and house left clean and tidy
keeping
Alternatives Considered: What are the other possible means of achieving the job outcome?
Part 3: Contingency Plans: What rescue equipment, PPE etc could be needed if something went wrong? Reference Field ERP
Full time communication with CCR to be made in case of any emergency / muster (Secure the work area and go to the main gate muster point
for Descon.
CONTROLLED DOCUMENT
Page 5 of 5
PF03.02 Rev. 0
Printed copies of this document are not controlled.
To verify this copy is current, check on the intranet at HSE Portal