The Check Procedure For Insulation Resistance For ST Windings
A.C.B
Gen. M
S
D
B
Measurement point
The Fuse should be
removed when check
insulation resistance.
2) If insulation resistance is not in normal, firstly the power cables should be checked.
Please check insulation resistance value of power cables whether grounded.
Some times, cables rubbed by a hull vibration and grounded,
3) If you can't found grounded with cables, dis-connect power cables from the Generator.
Then, check the insulation resistance on the Bus-Bar for Generator windings,