Weigh Bridge Foundation 18.055 0.8 0.9 12.9996
18.055 0.8 0.9 12.9996
1.9 0.8 0.9 1.368
1.9 0.8 0.9 1.368
1.9 0.6 0.9 1.026
1.9 0.6 0.9 1.026
31
Columns (10) 0.2 0.4 3.4 0.272
3
Sand Balast 18.5 8.5 0.165 26
14.8 8.5 0.23 29
18.5 11.83 0.18 39
99
Lift
TOTAL 132
Qty (m2)
Concrete Blocks (For Office Building) 132 3.4 448.8
Qty (nos)
Steel Mesh (For Sand Balast) 18.5 11.83 28
Steel Mesh (For Office Building) 43 10.8 59
Nos 87
8.5 m 11.83 m
18.5 m 18.5 m
SAND BALASTING
5.576
14.8 m 4.896
1.824
0.336
8.5 m
p1102w
Production Area = 4929 m3
Paint Area = 981 m3
Sand Balast = 502 m3
Weigh Bridge = 63 m3
Office Building = 464 m3
Conn Slab = 174 m3
Total Area = 26408 m3
Asphalt Area = 19294 m3 231526 92878
Diff = 757 m3
Asphalt Area (contractor) = 18537 m3
Sharafat Ali
Arsahd Mehr
Imran
Waqas
Shahid Abro
Naeem Ali
Sajid
Nawaz Ali
Kamran
Kashif Rouf
Shan Babar
11554 138648 110918.4
18537 222444 83796 177955.2 67036.8
10
11554 173310
18545.21