You are on page 1of 1

ROOF LINE

0.75

TOP OF ROOF BEAM


3.50
2.65

GROUND FLOOR FFL.


N.G.L.
0.10

FRONT ELEVATION LEFT ELEVATION CROSS SECTION THRU "X"

ROOF LINE
0.75

TOP OF ROOF BEAM


3.50
2.65

GROUND FLOOR FFL.


N.G.L.
0.10

REAR ELEVATION RIGHT ELEVATION CROSS SECTION THRU "Y"

CAD BY: SIGN AND SEAL: REPUBLIC ACT 545 SECTION 25(4) PROJECT TITLE: PROJECT OWNER: SHEET CONTENTS: SHEET NO.:

Drawing and Specification duly signed,stamped


or sealed as instrument of service are properties
NHEL ALBRECHT G. BABALCON NHEL ALBRECHT G. BABALCON of the Author whether the object for which they ONE STOREY COMMERCIAL BUILDING
CIVIL ENGINEER CIVIL ENGINEER
are madeis executed or not .It is unlawful for any
(BIG DADDY'S CUP) JONASH D. BABALCON AS SHOWN
03
person, without the writter consent of the author
Bliss Site, Zone 4, Paranas, Samar Cel. 0977-164-7148
of the said document to duplicate or copy for use
PRC No. : 0184130 Validity: 07/05/2025 in other projects, whether executed partly or in
PTR No. : Date: Place Issued: whole LOCATION: POBLACION 2, PARANAS, SAMAR SCALE: AS SHOWN 03 04

You might also like