Professional Documents
Culture Documents
Modified Format of CV
Modified Format of CV
1|Page
Personal Skills:
Experience in Briefly:
Project Details:
Project 1:
VOLTAGE CONVERSION PHASE-III (VCP-III), UDHALIYAH
Scope of project:
The purpose full voltage conversion from existing 208/120 Volts to 400/230 Volts for external
works and replacement of existing pad mounted transformer and provision of new KWH meter
center of External Residential Area, Udhaliyah.
[
Replacement of all Existing 208/120V Electrical Equipments & Devices into 400/230 V equipments &
devices Such as Electrical panel boards (EPB), Socket outlets, Dis Connect Switches, lighting System,
Fire Alarm System, Exhaust Fan, HVAC System.
Replacement of Existing 150 KVA Pad Mounted Transformer into New 300KVA PSS & Provide NEW
KWH Meter & Breaker for each separate houses with relevant loads.
4|P age
Project 2:
MAINTENANCE WORK OF SCRAPER PUSHER AT CRUDE OIL PIPE LINE:
Scope of project:
Replacement of All Electrical Equipments & devices inside Scraper Pusher Control
panel with new Electrical equipments & devices
Replacement of Steel Wired Ropes, Wire Driven Motors, Pulleys, etc
********
Project Scope:
TENDERNO:21/2019- SCOPE: CONSTRUCTION OF 33KV &11KV OHTL & POWER CABLE FEEDERS
RELATED TO LOCATION - JAALAN BANI BU ALI-III & JAALAN BANI BU HASSAN-III FROM PRIMARY
SUBSTATION(PSS) IN SOUTH ALSHARQIYAH GOVERNORATE. (SULTANATE OF OMAN).
5|P age
Site Work Description:
Resource Arrangement as early as possible to the sites
Manpower and Vehicles arrangements to the sites.
Plan with respect to Site needs and work Urgency, regular monitoring of progress and lag of project.
Manage and maintain the cost of Project within the time period of project.
Regular monitoring site activities.
Inspection of Installation of Oil & Gas Pipeline Protection Equipments like Surge Diverter,
Polarization Cell, GIRK Cell, TLP’s, TLP Monitoring & Maintenance, Transformer Rectifier Unit
Monitoring & Maintenance, Anode Bed Monitoring & Maintenance, CTSU Monitoring, ER Probe
Monitoring., Casing Survey, CIPL Survey, DCVG Survey.
DPR Preparation and Site Expense Management.
Invoice preparation For Finished Work Assignment
Satisfy the Client with reliable and Safety of electrical activity.
*****
Tools Handled:
MEGGER TESTER, POLE DIRECTION TESTER, CABLE JOINTING KITS, HIGH VOLTAGE TESTER,
RMUDIRECTIONCHANGER,OVERHEADPOWERTRANSMISSIONLINEEQIPMENTS,CABLEPUNCTURINGEQUIP
MENTS.
6|P age
Job Responsibilities:
Electrical Project Execution as per Saudi Electricity board builted design and drawings.
Arrangement of Project needs by Site requirement
Erection of Cable, Transformer, RMU, Electrical Protection Equipments.
Site Coordination with Manpower
Timesheet Management of Site Workers.
Preparation of bill of quantities(BOQ)
Preparation of Site Monitoring report as per SCECO Standards.
Problem Solving with Saudi Customers.
Ensure the Project Completion With in Time period.
****
Job Responsibilities:
The main purpose of this project is Collecting the electrical and mechanical product details by
using sourcing, cleansing and enrichment process.
Preparation of Transformer designs, BOQs, PFC charts, FMEA as per customer requirements
and interact with customers.
Preparation of New transformer samples for companies like GE, NOKIA, SALCOMP,
SAMSUNG, Testing and Commissioning Transformers upto 10KVA, 7KVA, 5KVA,
50VA,
Documentation of new development samples
7|P age
5.Past Experience SITE INCHARGE
Client BPCL, HPCL, IOCL
Experience at Corrosion Control August 2010 to April 2011
Engineers,TamilNadu
TeamSize As per work Requirement
Role Site Coordinator
Job Responsibilities:
Collecting the equipment details.
Linking of Function Location, Equipment Master, Material Master, Bill Of Materials(BOM) & other
engineering Drawing Documents as per LSMW Template
Bill Of Materials(BOM). Core Responsibilities
Production Planning, control and execution
Developing process based on the project specification, process approval steps
Daily Productivity Reporting to the management
Conduct Production Review Meeting on weekly basis, and take appropriate steps towards 100%
productivity
Languagesknown
Tamil: Speak, Read, Write.
English: Speak, Read, Write.
Hindi: Speak only.
Arabic: Speak only
PassportDetails
New Passport Number: U8818968
Date Of Issue: 08-03-2021
Date Of Expiry: 07-03-2031
Old Passport Number: J5672108
Declaration
I assure that I can prove very successful and do my best to the advancement and progress of your esteemed
organization.
Place: Regards,
Date: Thiruselvam.M
8|P age
BACHELOR DEGREE CERTIFICATE FRONT SIDE (EEE)
9|P age
BACHELOR DEGREE CERTIFICATE WITH ATTESTATION
10|P age
ARAMCO ID
11|P age
DIPLOMA IN INDUSTRIAL SAFETY CERTIFICATE
12|P age
OMANCEPLICENSE-ELECTRICAL
13|P age
14|P age
ELECTRICAL SAFETY RULES (ESR COURSE CERTIFICATE)
15|P age
FIRST AID COURSE CERTIFICATE
16|P age
HSE INDUCTION COURSE CERTIFICATE
17|P age
NEW PASSPORT COPY
18|P age
DESIGN & DEVELOPMENT ENGINEER EXPERIENCE CERTIFICATE
19|P age
CP ENGINEER EXPERIENCE CERTIFICATE
20|P age
?
21|P age