JSA014293M P&A RLU XXX Pull pack off Pull pack off and tubing
and tubing hanger. hanger.
Job Safety Analysis
Required PPE Required Tools
2
Job Safety Task
Task Steps Hazard # Hazard (Other)
(Listed in Sequential Order)
Pressure N/A
Job Safety Task Steps (Listed in Sequential Order)
Hazard Information
(Complete the following for each task step)
- Dropped objects.
- Working at height.
- Slips, Trips and falls around working area.
- Pinch Points.
- Equipment damaged.
- Muscle strain / back pain injury.
- Tongs loose grip.
- Line of fire.
- Miscommunication.
- Radios lost signal.
- Pressure trap.
- Pressure from the wells.
- Line of fire.
ted in Sequential Order)
Controls / Mitigations Person
Responsible
for Control
Implementation
- Review JSAs, excercise Stop Work Responsibility and perform Hazard HSE officer
hunt prior to start the job.
- Review if the tasks are related to the critical task lists.
- Any tasks diviated from the plan , SWA has to be conducted.
- PPE must be worn at all time particuarly the impact gloves.
- Prepare certified and functioning equipment prior execution.
- Confirm that there is no hydrocarbon / Mecury and ensure that gas
detection system is in place and functioning.
- If the hazardous gas / Mecury is shown, the safeguards such as the
crew's competency for hazmat traning needs to be in place.
- Ensure that the crane has been inspected prior to start of any shift.
- Check the weather condition prior to perform any task.
- Perform JSAs, V&V, crane checklist, lifting plan (including drop zone Task supervisor
diagram) and SWC for lifting & rigging and drop inspection prior to work.
- Inspect working at height rescue equipment and ensure that the
equipment is ready to be used in case of emergency.
- Conduct SWC for working at height prior to work.
- Review the rescue plan and get documented on the location.
- Barricade working and lifting area.
- Inspect all handtools and lifting equipment before use.
- Use certifiled and correct lifting device with identification of SWL.
- Inspect and eliminate any loosen parts on lifting equipment/ loads.
- Beware of overhead loads, don’t stand under loads.
- Use a safety harness and tie with an appropriate securing point.
- Secure handtools with landyard.
- Strictly follow wellhead specialist's instruction.
- Pack off pulling tool must be in latch position.
- Use ladder or scaffolding if the wellhead is high.
- Ensure that the scaffolds are certified and in date.
- Verify that all clamps are tightly secured prior performing pulling the pack
off.
- Ensure that the elevator is latched properly.
- Install back the hatch cover at work window as soon as the pack off is out
the hole.
- Clear people around the deck area prior laying down the packoff.
- Hands off load use adequate No's of taglines and push-pull sticks.
- Keep walkway and area along lifting path clear. Task supervisor
- Remove any objects causing trip hazar and highlight any trip hazards that
cannot be removed.
- No hand on loads.
- Use 4 taglines and push/pull tool to control the direction.
- Watch your step.
- Look for potential pinch points and highlight them.
- Discuss and identify line of fire.
- Stay on proper position and ensure proper technique of body positioning.
- Stay away when torquing connections (e.g. crossovers).
- Only authorised personnel is allowed in the working area.
- Test the door interlock system before use.
- Verify tong operator have tight fitting clothing to prevent entanglement in
rotating component.
- Apply low torque and gradually increase up to make up torque.
- If the tong dies or slip dies loose bite, change the dies as required.
- Clean the pipe if the surface pipe are dirty or covers with oil.
- Clean the tong dies constantly with wire brush.
- Use correct size of dies.
- Check all Annulis for not having the trappped pressure by opening the Task supervisor
side outlet.
- Stay away from line of fire.
Person Critical
Responsible Step
for Control
Verification
WSR Y
WSR Y
WSR Y
WSR Y
WSR Y
Potential Keyword Risk Ranking Critical
Biological L Y
Chemical M N
Electrical H
Gravity (Falls)
Mechanical
Motion
Pressure
Radiation
Sound
Temperature
Other (Specify)