008 - Cut, Pull, Lay Down Casing and Tubular - REV2.0
008 - Cut, Pull, Lay Down Casing and Tubular - REV2.0
JSA015275M P&A RLU XXX Cut, pull and Cut, pull and laydown casing
laydown casing and tubular. and tubular.
Job Safety Analysis
Required PPE Required Tools
2
Job Safety Task
Task Steps Hazard # Hazard (Other)
(Listed in Sequential Order)
Cut conductor, cut pull and laydown casing and Gravity (Falls) N/A
tubular.
Pressure N/A
Chemical N/A
Job Safety Task Steps (Listed in Sequential Order)
Hazard Information
(Complete the following for each task step)
- Dropped objects.
- Working at height.
- Slips, Trips and falls around working area.
- Pinch Points.
- Equipment damaged.
- Muscle strain / back pain injury.
- Tongs loose grip.
- Line of fire.
- Miscommunication.
- Radios lost signal.
- Pressure trap.
- Pressure from the wells.
- Line of fire.
- Liquid / hydraulic spills.
- Expose to harzardous materials such as
Mercury, H2S.
ted in Sequential Order)
Controls / Mitigations Person
Responsible
for Control
Implementation
- Review JSAs, excercise Stop Work Responsibility and perform Hazard HSE officer
hunt prior to start the job.
- Review if the tasks are related to the critical task lists.
- Any tasks diviated from the plan , SWA has to be conducted.
- PPE must be worn at all time particuarly the impact gloves.
- Prepare certified and functioning equipment prior execution.
- Confirm that there is no hydrocarbon / Mecury and ensure that gas
detection system is in place and functioning.
- If the hazardous gas / Mecury is shown, the safeguards such as the
crew's competency for hazmat traning needs to be in place.
- Ensure that the crane has been inspected prior to start of any shift.
- Check the weather condition prior to perform any task.
- Perform JSAs, V&V, crane checklist, lifting plan (including drop zone Task supervisor
diagram) and SWC for lifting & rigging and drop inspection prior to work.
- Barricade working, lifting and laydown area.
- Inspect all handtools and lifting equipment before use espectially the
elevator.
- Use certifiled and correct lifting device with identification of SWL.
- Inspect and eliminate any loosen parts on lifting equipment/ loads.
- Beware of overhead loads, don’t stand under loads.
- Hands off load use adequate No's of taglines and push-pull sticks.
- Use a safety harness and tie with an appropriate securing point.
- Secure handtools with landyard.
- Make sure limit switch / interlocking system working properly by using
daily checklist before tripping the pipe
- Keep walkway and area along lifting path clear. Task supervisor
- Remove any objects causing trip hazar and highlight any trip hazards that
cannot be removed.
- No hand on loads.
- Use taglines and push/pull tool to control the direction.
- Watch your step.
- Look for potential pinch points and highlight them.
- Discuss and identify line of fire.
- Stay on proper position and ensure proper technique of body positioning.
- Only authorised personnel is allowed in the working area.
- Test the door interlock system before use.
- Verify tong operator have tight fitting clothing to prevent entanglement in
rotating component.
- Apply low torque and gradually increase up to make up torque.
- If the tong dies or slip dies loose bite, change the dies as required.
- Clean the pipe if the surface pipe are dirty or covers with oil.
- Clean the tong dies constantly with wire brush.
- Use correct size of dies.
- Do not rotate the tool without the torque lock.
- Avoid rotating the tool while the slip bowl in place to eliminate the chance
of drillpipe damage.
- Isolate Energy Source before changing out slips / troubleshooting CTJ
and slips
WSR Y
WSR Y
WSR Y
WSR Y
WSR Y
WSR Y
Potential Keyword Risk Ranking Critical
Biological L Y
Chemical M N
Electrical H
Gravity (Falls)
Mechanical
Motion
Pressure
Radiation
Sound
Temperature
Other (Specify)