Professional Documents
Culture Documents
–Expro
Algeria.
Pre-Job Meeting
-Wear correct lifting assembly, don’t forget tag line and one banks man given
signs to crane operator;
- Good communications with all personnel (including the client), with clear
responsibilities for each person in the team discussed and well defined;
- During pressure test, limit personnel on well site and PTF trained person to
lead the activity;
- Always control the air supply, critical valves need to be identified and
labelled to not be manipulated during ops;
- If you see any leak don’t do something quickly think before you do
anything, never tight any connection under pressure;
- Ensure all data and reports are checked before submit to client;
- Check your choke manifold before any opening, check the right orings on
choke beans , check all threads inside;
-Hose management - (With serial number / WP and type for all hoses), in use
on the location to be send to the coordinator at the end of the job;
-Leader for the operation to training the operators on Separator( On the job
training );
-Inventory of all Safety items on site –Fire extinguishers, fall arrestor, spill
kits, eye wash..., Part of the site inspection / preparation;
-Thickness test, all lines with initial measurement before start the job and
checks during the job in the SAME POINT;
-Barton DPU operation work instruction to be shared with the crew members
and laminated copy to be available in the package / information board.
-Etrak event 365652 – Lack of detailed work instruction and awareness for
Barton DPU operation work instruction on sites.