You are on page 1of 1

RUN SHEET Joint Configuration & Sequence

Date:

Company Name:

Location:

Item Name & No:

Pipe Dia: Thickness:

Joint Type:

Welding Process:

Base Metal Specification:

Filler Metal Specification: Filler Dia : Tungsten Dia. (for GTAW):

Gas: Gas Flow Rate: Welding Position: Welder Name:

Weld Weld Length Time Volt Current Travel Speed Heat Input Weld Metal Weld Size Surface
Pass (mm) (Seconds) (V) (I) (mm/s) (Kj/mm) thickness (mm) Temprature
(mm) (°C)
1 (Root)
2 (Hot)
3
4
5
6
Final

You might also like