You are on page 1of 18

One-Line Diagram - OLV1 | Load Flow Analysis | LF EDG ON 2

1000 kW 1000 kW
EDG 101 EDG 102

567,3 567,3
PLN
818,8 818,8
200 MVAsc LVEDG 89,24% 89,24%
0,4 kV
1135
18,1
1638
0,522
20 kV 0% 89,24%
Bus1
18,1
0,522
0%

TR-01
1600 kVA
0 % Vd

Open 1106
MV Switchgear 32,8
20 kV 90,83%
1006 100,5
29,8 3
Open 90,17% 96,23%

1007 111,2
29,8 3,3
90,14% 87%
0,004 % Vd 0,012 % Vd
1007 111,2
TR-02 TR-03 29,8 TR-04 3,3
108,8
2500 kVA 1600 kVA 90,14% 200 kVA 87%
164,7
87,52%
108,8
164,7
108,7
87,52%
164,7
87,51%
983,3 108,7
1491 164,7
0,143 % Vd
91,58% 87,51%

LVMCC01 LVMCC02 LVMCC03

Page 1 of 1 22:46:47 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC02 | Load Flow Analysis | LF EDG ON 2

TR-03

983,3
1491
LV MCC 02 91,58%
0,4 kV
218,8 1,57 117,7 1,55 59,8 1,55 1,16 11,8 1,14 35
331,8 2,4 178,5 2,3 90,7 2,4 1,8 17,9 1,7 53
91,97% 82,57% 91,59% 82,13% 91,52% 82,29% 85,54% 85% 86,14% 85

200 kW 1,1 kW 110 kW 1,1 kW 55 kW 1,1 kW


1,18 kVA 11,76 kVA 1,18 kVA 35,29 k

Page 1 of 2 22:47:27 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC02 | Load Flow Analysis | LF EDG ON 2

5 530,4 1,55 2,98


3 804,4 2,4 4,5
5,35% 92,06% 82,29% 84,18%

1,37 % Vd
Bus3
0,38 kV 522,7
804,4
92,2%

kVA 1,1 kW 2,2 kW

500 kW

Page 2 of 2 22:47:27 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC03 | Load Flow Analysis | LF EDG ON 2

Cable6

108,7
164,7
LV MCC 03 87,51%
0,4 kV
40,8 1,55 7,01 7,01 52,5
61,9 2,3 10,6 10,6 79,5
90,51% 82,08% 86,49% 86,49% 85,4%

37 kW 1,1 kW 5,5 kW 5,5 kW 52,94 kVA

Page 1 of 1 22:47:48 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
Project: ETAP Page: 1

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (2): Normal

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 2 0 8 10

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 3 0 0 5 0 0 8

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: PROYEK LINE 3 BUNATI ONSHORE

Output Filename: C:\Users\WAHYONO\Documents\EI PROYEK\2. PROJECT\3. NEW LINE BUNATI\6.


ELECTRICAL DOC\1. CALCULATION\2. LOAD FLOW ANALYSIS\ETAP LINE 3
BUNATI\PROYEK LINE 3 BUNATI ONSHORE\Untitled.lfr
Project: ETAP Page: 2

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 20.000 1 100.0 0.0

Bus3 0.380 2 100.0 0.0 0.482 0.202

LV MCC 02 0.400 2 100.0 0.0 0.370 0.162 0.046 0.028

LV MCC 03 0.400 2 100.0 0.0 0.050 0.025 0.049 0.030

LVEDG 0.400 2 100.0 0.0

MV Switchgear 20.000 2 100.0 0.0

V.Bus3 20.000 2 100.0 0.0

V.Bus5 20.000 2 100.0 0.0

V.Bus6 0.400 2 100.0 0.0

Cable2~ 20.000 1 100.0 0.0

Total Number of Buses: 10 0.903 0.390 0.096 0.058 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 20.000 Swing 1 100.0 0.0

LVEDG 0.400 Swing 2 100.0 0.0

0.000 0.000
Project: ETAP Page: 4

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable4 10NCUS3 50 30.0 0.0 1 75 0.471271 0.110000 0.0000754

Cable5 10NCUS3 50 960.0 0.0 1 75 0.471271 0.110000 0.0000754

Cable6 1,0NCUN3 120 20.0 0.0 2 75 0.188000 0.073000

Cable64 1,0NCUN3 240 102.0 0.0 3 75 0.095527 0.072000

Cable2 10NCUS3 50 600.0 0.0 1 75 0.471271 0.110000 0.0000754

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TR-01 3-Phase 1.600 0.400 20.000 6.25 6.00 0 0 0 0 0 6.2500 YNd 0.000
TR-03 3-Phase 1.600 20.000 0.400 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000

TR-04 3-Phase 0.200 20.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
Project: ETAP Page: 6

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

TR-01 2W XFMR LVEDG MV Switchgear 64.22 385.31 390.63

TR-03 2W XFMR V.Bus3 LV MCC 02 64.22 385.31 390.63

TR-04 2W XFMR V.Bus5 V.Bus6 1109.40 1664.10 2000.00

Cable4 Cable MV Switchgear V.Bus3 0.35 0.08 0.36 0.0009048

Cable5 Cable MV Switchgear V.Bus5 11.31 2.64 11.61 0.0289529

Cable6 Cable V.Bus6 LV MCC 03 117.50 45.62 126.05

Cable64 Cable LV MCC 02 Bus3 203.00 153.00 254.20

Cable2 Cable Bus1 Cable2~ 7.07 1.65 7.26 0.0180956


Project: ETAP Page: 7

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Equipment Cable Input Data

ohms or siemens/1000 m per Conductor O/L Heater

Equipment Cable Equipment Length Resistance

ID ID Type Library Size Adj. (m) % Tol #/ph T (°C) R X Y Adj.(ohm) % Tol

Cable18 Belt Scale Stat. Load 1,0NCUN4 2.5 275.0 0.0 1 75 9.01141 .10490 .0000000 .0000 0.0

Cable7 Con CV-07 Ind. Motor 1,0NCUN3 25 37.0 0.0 1 75 .88459 .08200 .0000000 .0000 0.0

Cable14 Conv CV-04 Ind. Motor 1,0NCUN3 120 51.0 0.0 1 75 .18800 .07300 .0000000 .0000 0.0

Cable16 Conv CV-05 Ind. Motor 1,0NCUN3 50 102.0 0.0 1 75 .47134 .07800 .0000000 .0000 0.0

Cable8 Fan for Con CV-07 Ind. Motor 1,0NCUN3 2.5 37.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable15 Fan for Conv CV-04 Ind. Motor 1,0NCUN3 2.5 51.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable17 Fan for Conv CV-05 Ind. Motor 1,0NCUN3 2.5 102.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable22 Fan for Conv CV-06 Ind. Motor 1,0NCUN3 2.5 102.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable13 Fan Underground Conv BC-4 Ind. Motor 1,0NCUN3 2.5 191.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable11 LP for Export Shiploader Stat. Load 1,0NCUN4 16 32.0 0.0 1 75 1.39880 .08920 .0000000 .0000 0.0

Cable20 LP for MCC Room Export Stat. Load 1,0NCUN4 16 42.0 0.0 1 75 1.39880 .08920 .0000000 .0000 0.0

Cable19 Metal Detector Stat. Load 1,0NCUN4 2.5 600.0 0.0 1 75 9.01141 .10490 .0000000 .0000 0.0

Cable23 Oil cooler for conv CV-06 Ind. Motor 1,0NCUN3 2.5 102.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable9 Rotary Chute A Ind. Motor 1,0NCUN3 2.5 60.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable10 Rotary Chute B Ind. Motor 1,0NCUN3 2.5 60.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable12 Underground Conv BC-04 Ind. Motor 1,0NCUN3 95 191.0 0.0 2 75 .23620 .07500 .0000000 .0000 0.0
Project: ETAP Page: 8

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 20.000 100.000 0.0 0.000 -0.018 0.000 0.000 Cable2~ 0.000 -0.018 0.5 0.0

Bus3 0.380 98.737 -4.3 0.000 0.000 0.482 0.202 LV MCC 02 -0.482 -0.202 804.4 92.2

LV MCC 02 0.400 95.174 -4.1 0.000 0.000 0.412 0.188 Bus3 0.488 0.207 804.4 92.1

V.Bus3 -0.901 -0.395 1491.3 91.6

LV MCC 03 0.400 95.256 -2.7 0.000 0.000 0.095 0.053 V.Bus6 -0.095 -0.053 164.7 87.5

* LVEDG 0.400 100.000 0.0 1.012 0.512 0.000 0.000 MV Switchgear 1.012 0.512 1637.6 89.2

MV Switchgear 20.000 97.442 -2.1 0.000 0.000 0.000 0.000 V.Bus3 0.907 0.435 29.8 90.2

V.Bus5 0.097 0.027 3.0 96.2

LVEDG -1.004 -0.462 32.8 90.8

V.Bus3 20.000 97.439 -2.1 0.000 0.000 0.000 0.000 MV Switchgear -0.907 -0.436 29.8 90.1

LV MCC 02 0.907 0.436 29.8 90.1

V.Bus5 20.000 97.430 -2.1 0.000 0.000 0.000 0.000 MV Switchgear -0.097 -0.055 3.3 87.0

V.Bus6 0.097 0.055 3.3 87.0

V.Bus6 0.400 95.398 -2.7 0.000 0.000 0.000 0.000 LV MCC 03 0.095 0.053 164.7 87.5

V.Bus5 -0.095 -0.053 164.7 87.5

Cable2~ 20.000 100.000 0.0 0.000 0.000 0.000 0.000 Bus1 0.000 0.000 0.0 0.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 9

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 20.000 0.018 - 0.5


Bus3 0.380 0.482 0.202 0.523 92.2 804.4
LV MCC 02 0.400 0.370 0.162 0.042 0.026 0.983 91.6 1491.3
LV MCC 03 0.400 0.050 0.025 0.045 0.027 0.109 87.5 164.7
LVEDG 0.400 1.135 89.2 1637.6
MV Switchgear 20.000 1.106 90.8 32.8
V.Bus3 20.000 1.007 90.1 29.8
V.Bus5 20.000 0.111 87.0 3.3
V.Bus6 0.400 0.109 87.5 164.7

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 10

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable6 Cable 472.31 164.67 34.86

TR-01 Transformer 1.600 1.135 70.9 1.106 69.1

TR-03 Transformer 1.600 1.007 62.9 0.983 61.5

TR-04 Transformer 0.200 0.111 55.6 0.109 54.4

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 11

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable2 0.000 -0.018 0.000 0.000 0.0 -18.1 100.0 100.0 0.00

Cable4 0.907 0.435 -0.907 -0.436 0.0 -0.9 97.4 97.4 0.00

Cable5 0.097 0.027 -0.097 -0.055 0.0 -27.5 97.4 97.4 0.01

Cable6 -0.095 -0.053 0.095 0.053 0.2 0.1 95.3 95.4 0.14

Cable64 -0.482 -0.202 0.488 0.207 6.3 4.8 98.7 95.2 1.37

TR-01 1.012 0.512 -1.004 -0.462 8.3 49.6 100.0 97.4 2.56

TR-03 -0.901 -0.395 0.907 0.436 6.9 41.1 95.2 97.4 2.26

TR-04 0.097 0.055 -0.095 -0.053 1.4 2.2 97.4 95.4 2.03

23.1 51.3

* This Transmission Line includes Series Capacitor.


Project: ETAP Page: 12

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Equipment Cable and Overload Heater Losses Summary Report

% Voltage

Connected Load Cable /Overload Heater Losses


Terminal on % Vst
% Vd
ID Type ID Library kW kvar Bus Bus kV Load kV Operating Starting

Underground Conv BC-04 Ind. Motor Cable12 1,0NCUN3 7.4 2.4 95.17 91.79 96.62 3.38 83.87

Fan Underground Conv BC-4 Ind. Motor Cable13 1,0NCUN3 0.0 0.0 95.17 93.71 98.64 1.47 86.97

Conv CV-04 Ind. Motor Cable14 1,0NCUN3 0.9 0.4 95.17 94.38 99.35 0.79 92.04

Fan for Conv CV-04 Ind. Motor Cable15 1,0NCUN3 0.0 0.0 95.17 94.79 99.78 0.39 92.89

Conv CV-05 Ind. Motor Cable16 1,0NCUN3 1.2 0.2 95.17 93.32 98.23 1.85 88.96

Fan for Conv CV-05 Ind. Motor Cable17 1,0NCUN3 0.0 0.0 95.17 94.40 99.37 0.78 90.67

Fan for Conv CV-06 Ind. Motor Cable22 1,0NCUN3 0.0 0.0 95.17 94.40 99.37 0.78 90.67

Oil cooler for conv CV-06 Ind. Motor Cable23 1,0NCUN3 0.1 0.0 95.17 93.66 98.59 1.52 87.50

Con CV-07 Ind. Motor Cable7 1,0NCUN3 0.4 0.0 95.26 94.43 99.40 0.83 92.52

Fan for Con CV-07 Ind. Motor Cable8 1,0NCUN3 0.0 0.0 95.26 94.98 99.97 0.28 93.59

Rotary Chute A Ind. Motor Cable9 1,0NCUN3 0.2 0.0 95.26 93.10 98.00 2.16 85.96

Rotary Chute B Ind. Motor Cable10 1,0NCUN3 0.2 0.0 95.26 93.10 98.00 2.16 85.96

Belt Scale St. Load Cable18 1,0NCUN4 0.0 0.0 95.17 93.55 98.47 1.63 0.00

LP for Export Shiploader St. Load Cable11 1,0NCUN4 0.8 0.1 95.26 93.89 98.83 1.36 0.00

LP for MCC Room Export St. Load Cable20 1,0NCUN4 0.5 0.0 95.17 93.98 98.93 1.19 0.00

Metal Detector St. Load Cable19 1,0NCUN4 0.0 0.0 95.17 91.68 96.51 3.49 0.00
Project: ETAP Page: 13

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable / Busway 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 90.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0


Project: ETAP Page: 14

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 2
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG shipload

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1.012 0.494 1.127 89.87 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 1.012 0.494 1.127 89.87 Lagging

Total Motor Load: 0.903 0.390 0.983 91.81 Lagging

Total Static Load: 0.087 0.053 0.102 85.35 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.023 0.051

System Mismatch: 0.000 0.000

Number of Iterations: 3