One-Line Diagram - OLV1 | Load Flow Analysis | LF EDG ON 1

1000 kW 1000 kW
EDG 101 EDG 102

714,4 714,4
PLN
1031 1031
200 MVAsc LVEDG 87,96% 87,96%
0,4 kV
1429
18,1
2062
0,522
20 kV 0% 87,96%
Bus1
18,1
0,522
0%

TR-01
1600 kVA
0 % Vd

Open 1381
MV Switchgear 41,2
20 kV 90,03%
1381
41,2
90,03% Open Open

1387
41,5
89,54%
0,101 % Vd
1387
TR-02 41,5 TR-03 TR-04
2500 kVA 89,54% 1600 kVA 200 kVA

111,3
164,6
87,46%
1358
2073
90,87%

LVMCC01 LVMCC02 LVMCC03

Page 1 of 1 22:42:56 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC01 | Load Flow Analysis | LF EDG ON 1

TR-02

1358
2073
LV MCC 01 90,87%
0,4 kV
213,6 1,55 213,6 1,55 13,1 81,1 1,55 59,5 59,6 59
326,2 2,4 326,2 2,4 20 123,9 2,4 90,9 91 91
91,88% 82,18% 91,88% 82,18% 87,47% 91,53% 82,22% 91,47% 91,48% 91
Open Open Open Open Open Open Open Open

200 kW 1,1 kW 200 kW 1,1 kW 200 kW 1,1 kW 200 kW 1,1 kW 11 kW 75 kW 1,1 kW 75 kW 1,1 kW 55 kW 55 kW 55 kW 55 kW 55 kW

Page 1 of 3 22:43:35 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC01 | Load Flow Analysis | LF EDG ON 1

9,8 1,54 7,15 7,15 431,4 1,56 13,1 17,7 13,4 5,2 9,43 3,05 3,05 9,44 3,06 3,06 9,51 3
1,4 2,4 10,9 10,9 658,9 2,4 20,1 27 20,5 7,9 14,4 4,7 4,7 14,4 4,7 4,7 14,5 4
1,52% 81,98% 87,01% 87,01% 92,06% 82,5% 81,3% 81,75% 88,06% 98,78% 87,34% 84,94% 84,94% 87,36% 85,09% 85,09% 87,54% 8
Open Open

1,1 kW 55 kW 1,1 kW 5,5 kW 5,5 kW 400 kW 1,1 kW 13,75 kVA 18,75 kVA 11 kW 5,29 kVA 7,5 kW 2,2 kW 2,2 kW 7,5 kW 2,2 kW 2,2 kW 7,5 kW 2,2 kW

Page 2 of 3 22:43:35 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
One-Line Diagram - OLV1->LVMCC01 | Load Flow Analysis | LF EDG ON 1

3,07 3,07 51,3 51,8 4,9 4,9


4,7 4,7 78,3 79,1 7,5 7,5
85,25% 85,25% 85,51% 85,32% 80,46% 80,46%

W 2,2 kW 52,94 kVA 52,94 kVA 5 kVA 5 kVA

Page 3 of 3 22:43:35 Apr 24, 2024 Project File: PROYEK LINE 3 BUNATI ONSHORE
Project: ETAP Page: 1

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (2): Normal

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 2 0 4 6

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 2 0 0 2 0 0 4

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: PROYEK LINE 3 BUNATI ONSHORE

Output Filename: C:\Users\WAHYONO\Documents\EI PROYEK\2. PROJECT\3. NEW LINE BUNATI\6.


ELECTRICAL DOC\1. CALCULATION\2. LOAD FLOW ANALYSIS\ETAP LINE 3
BUNATI\PROYEK LINE 3 BUNATI ONSHORE\Untitled.lfr
Project: ETAP Page: 2

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 20.000 1 100.0 0.0

LV MCC 01 0.400 2 100.0 0.0 1.107 0.489 0.141 0.087

LVEDG 0.400 2 100.0 0.0

MV Switchgear 20.000 2 100.0 0.0

V.Bus2 20.000 2 100.0 0.0

Cable2~ 20.000 1 100.0 0.0

Total Number of Buses: 6 1.107 0.489 0.141 0.087 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 20.000 Swing 1 100.0 0.0

LVEDG 0.400 Swing 2 100.0 0.0

0.000 0.000
Project: ETAP Page: 4

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable3 10NCUS3 50 600.0 0.0 1 75 0.471271 0.110000 0.0000754

Cable2 10NCUS3 50 600.0 0.0 1 75 0.471271 0.110000 0.0000754

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TR-01 3-Phase 1.600 0.400 20.000 6.25 6.00 0 0 0 0 0 6.2500 YNd 0.000
TR-02 3-Phase 2.500 20.000 0.400 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000
Project: ETAP Page: 6

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

TR-01 2W XFMR LVEDG MV Switchgear 64.22 385.31 390.63

TR-02 2W XFMR V.Bus2 LV MCC 01 41.10 246.60 250.00

Cable3 Cable MV Switchgear V.Bus2 7.07 1.65 7.26 0.0180956

Cable2 Cable Bus1 Cable2~ 7.07 1.65 7.26 0.0180956


Project: ETAP Page: 7

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Equipment Cable Input Data

ohms or siemens/1000 m per Conductor O/L Heater

Equipment Cable Equipment Length Resistance

ID ID Type Library Size Adj. (m) % Tol #/ph T (°C) R X Y Adj.(ohm) % Tol

Cable62 AC-UPS Stat. Load 1,0NCUN4 2.5 42.0 0.0 1 75 9.01141 .10490 .0000000 .0000 0.0

Cable63 AC-UPS-BYPASS Stat. Load 1,0NCUN4 2.5 42.0 0.0 1 75 9.01141 .10490 .0000000 .0000 0.0

Cable1 Chain conv 1A Ind. Motor 1,0NCUN3 95 66.0 0.0 2 75 .23620 .07500 .0000000 .0000 0.0

Cable31 Conveyor BC-01 A Ind. Motor 1,0NCUN3 70 78.0 0.0 1 75 .32699 .07500 .0000000 .0000 0.0

Cable39 Conveyor BC-02 A Ind. Motor 1,0NCUN3 50 101.0 0.0 1 75 .47134 .07800 .0000000 .0000 0.0

Cable49 Drainage Pump BC-04 Ind. Motor 1,0NCUN3 16 217.0 0.0 1 75 1.39880 .08194 .0000000 .0000 0.0

Cable43 Dust Supresion Pump 2A Ind. Motor 1,0NCUN3 2.5 104.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable44 Dust Supresion Pump 2B Ind. Motor 1,0NCUN3 2.5 104.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable25 Fan Chain conv 1A Ind. Motor 1,0NCUN3 2.5 66.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable40 Fan Conveyor BC-02A Ind. Motor 1,0NCUN3 50 101.0 0.0 1 75 .47134 .07800 .0000000 .0000 0.0

Cable32 Fan Conveyor BC-1A Ind. Motor 1,0NCUN3 2.5 78.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable28 Fan Feeder breaker 1A Ind. Motor 1,0NCUN3 2.5 66.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable46 Fan SkylinConveyor Ind. Motor 1,0NCUN3 2.5 168.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable27 Feeder breaker 1A Ind. Motor 1,0NCUN3 95 66.0 0.0 2 75 .23620 .07500 .0000000 .0000 0.0

Cable61 Lighting panel MCC room Stat. Load 1,0NCUN4 25 42.0 0.0 1 75 .88459 .08200 .0000000 .0000 0.0

Cable60 Lighting panel New Line Stat. Load 1,0NCUN3 35 101.0 0.0 1 75 .63776 .07900 .0000000 .0000 0.0

Cable50 Local Panel for blower Stat. Load 1,0NCUN4 25 230.0 0.0 1 75 .88459 .08200 .0000000 .0000 0.0

Cable48 Local Panel for Winch Stat. Load 1,0NCUN4 16 312.0 0.0 1 75 1.39880 .08920 .0000000 .0000 0.0

Cable35 second Crusher AA Ind. Motor 1,0NCUN3 50 76.0 0.0 1 75 .47134 .07800 .0000000 .0000 0.0

Cable36 second Crusher AB Ind. Motor 1,0NCUN3 50 82.0 0.0 1 75 .47134 .07800 .0000000 .0000 0.0

Cable45 Skyline Conveyor Ind. Motor 1,0NCUN3 150 168.0 0.0 3 75 .15316 .07300 .0000000 .0000 0.0

Cable51 Sliding gate hopper A Ind. Motor 1,0NCUN3 10 230.0 0.0 1 75 2.22564 .08641 .0000000 .0000 0.0

Cable54 Sliding gate hopper B Ind. Motor 1,0NCUN3 10 236.0 0.0 1 75 2.22564 .08641 .0000000 .0000 0.0

Cable57 Sliding gate hopper C Ind. Motor 1,0NCUN3 10 289.0 0.0 1 75 2.22564 .08641 .0000000 .0000 0.0

Cable47 Tripper car2 Stat. Load 1,0NCUN4 16 311.0 0.0 1 75 1.39880 .08920 .0000000 .0000 0.0

Cable52 Vibramotor AA Ind. Motor 1,0NCUN4 2.5 236.0 0.0 1 75 9.01141 .10490 .0000000 .0000 0.0

Cable53 Vibramotor AB Ind. Motor 1,0NCUN3 2.5 236.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable55 Vibramotor BA Ind. Motor 1,0NCUN3 2.5 261.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable56 Vibramotor BB Ind. Motor 1,0NCUN3 2.5 261.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable58 Vibramotor CA Ind. Motor 1,0NCUN3 2.5 289.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0

Cable59 Vibramotor CB Ind. Motor 1,0NCUN3 2.5 289.0 0.0 1 75 9.01141 .09764 .0000000 .0000 0.0
Project: ETAP Page: 8

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 20.000 100.000 0.0 0.000 -0.018 0.000 0.000 Cable2~ 0.000 -0.018 0.5 0.0

LV MCC 01 0.400 94.512 -4.4 0.000 0.000 1.234 0.567 V.Bus2 -1.234 -0.567 2073.4 90.9

* LVEDG 0.400 100.000 0.0 1.257 0.680 0.000 0.000 MV Switchgear 1.257 0.680 2062.3 88.0

MV Switchgear 20.000 96.674 -2.6 0.000 0.000 0.000 0.000 V.Bus2 1.244 0.601 41.2 90.0

LVEDG -1.244 -0.601 41.2 90.0

V.Bus2 20.000 96.573 -2.6 0.000 0.000 0.000 0.000 MV Switchgear -1.242 -0.618 41.5 89.5

LV MCC 01 1.242 0.618 41.5 89.5

Cable2~ 20.000 100.000 0.0 0.000 0.000 0.000 0.000 Bus1 0.000 0.000 0.0 0.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 9

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 20.000 0.018 - 0.5


LV MCC 01 0.400 1.107 0.489 0.126 0.078 1.358 90.9 2073.4
LVEDG 0.400 1.429 88.0 2062.3
MV Switchgear 20.000 1.381 90.0 41.2
V.Bus2 20.000 1.387 89.5 41.5

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 10

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

TR-01 Transformer 1.600 1.429 89.3 1.381 86.3

TR-02 Transformer 2.500 1.387 55.5 1.358 54.3

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 11

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable2 0.000 -0.018 0.000 0.000 0.0 -18.1 100.0 100.0 0.00

Cable3 1.244 0.601 -1.242 -0.618 1.5 -16.6 96.7 96.6 0.10

TR-01 1.257 0.680 -1.244 -0.601 13.1 78.7 100.0 96.7 3.33

TR-02 -1.234 -0.567 1.242 0.618 8.5 50.9 94.5 96.6 2.06

23.0 94.9

* This Transmission Line includes Series Capacitor.


Project: ETAP Page: 12

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Equipment Cable and Overload Heater Losses Summary Report

% Voltage

Connected Load Cable /Overload Heater Losses


Terminal on % Vst
% Vd
ID Type ID Library kW kvar Bus Bus kV Load kV Operating Starting

Chain conv 1A Ind. Motor Cable1 1,0NCUN3 2.5 0.8 94.51 93.36 98.28 1.15 90.63

Fan Chain conv 1A Ind. Motor Cable25 1,0NCUN3 0.0 0.0 94.51 94.01 98.96 0.50 91.59

Feeder breaker 1A Ind. Motor Cable27 1,0NCUN3 2.5 0.8 94.51 93.36 98.28 1.15 90.63

Fan Feeder breaker 1A Ind. Motor Cable28 1,0NCUN3 0.0 0.0 94.51 94.01 98.96 0.50 91.59

Conveyor BC-01 A Ind. Motor Cable31 1,0NCUN3 1.2 0.3 94.51 93.13 98.04 1.38 89.87

Fan Conveyor BC-1A Ind. Motor Cable32 1,0NCUN3 0.0 0.0 94.51 93.92 98.86 0.60 91.07

second Crusher AA Ind. Motor Cable35 1,0NCUN3 0.9 0.1 94.51 93.13 98.03 1.38 89.93

second Crusher AB Ind. Motor Cable36 1,0NCUN3 1.0 0.2 94.51 93.02 97.91 1.49 89.57

Conveyor BC-02 A Ind. Motor Cable39 1,0NCUN3 1.2 0.2 94.51 92.66 97.54 1.85 88.40

Fan Conveyor BC-02A Ind. Motor Cable40 1,0NCUN3 0.0 0.0 94.51 94.47 99.44 0.04 94.24

Dust Supresion Pump 2A Ind. Motor Cable43 1,0NCUN3 0.3 0.0 94.51 90.66 95.43 3.85 78.97

Dust Supresion Pump 2B Ind. Motor Cable44 1,0NCUN3 0.3 0.0 94.51 90.66 95.43 3.85 78.97

Skyline Conveyor Ind. Motor Cable45 1,0NCUN3 11.2 5.3 94.51 91.80 96.64 2.71 84.51

Fan SkylinConveyor Ind. Motor Cable46 1,0NCUN3 0.0 0.0 94.51 93.22 98.12 1.30 87.29

Drainage Pump BC-04 Ind. Motor Cable49 1,0NCUN3 0.4 0.0 94.51 92.07 96.92 2.44 85.04

Sliding gate hopper A Ind. Motor Cable51 1,0NCUN3 0.3 0.0 94.51 91.67 96.50 2.84 83.08

Vibramotor AA Ind. Motor Cable52 1,0NCUN4 0.1 0.0 94.51 90.87 95.66 3.64 77.93

Vibramotor AB Ind. Motor Cable53 1,0NCUN3 0.1 0.0 94.51 90.88 95.66 3.64 77.94

Sliding gate hopper B Ind. Motor Cable54 1,0NCUN3 0.3 0.0 94.51 91.60 96.42 2.91 82.80

Vibramotor BA Ind. Motor Cable55 1,0NCUN3 0.2 0.0 94.51 90.47 95.23 4.04 76.40

Vibramotor BB Ind. Motor Cable56 1,0NCUN3 0.2 0.0 94.51 90.47 95.23 4.04 76.40

Sliding gate hopper C Ind. Motor Cable57 1,0NCUN3 0.4 0.0 94.51 90.91 95.70 3.60 80.32

Vibramotor CA Ind. Motor Cable58 1,0NCUN3 0.2 0.0 94.51 90.01 94.75 4.50 74.74

Vibramotor CB Ind. Motor Cable59 1,0NCUN3 0.2 0.0 94.51 90.01 94.75 4.50 74.74

AC-UPS St. Load Cable62 1,0NCUN4 0.1 0.0 94.51 93.52 98.44 0.99 0.00

AC-UPS-BYPASS St. Load Cable63 1,0NCUN4 0.1 0.0 94.51 93.52 98.44 0.99 0.00

Lighting panel MCC room St. Load Cable61 1,0NCUN4 0.7 0.1 94.51 93.37 98.28 1.14 0.00

Lighting panel New Line St. Load Cable60 1,0NCUN3 1.2 0.1 94.51 92.51 97.38 2.00 0.00

Local Panel for blower St. Load Cable50 1,0NCUN4 0.0 0.0 94.51 93.81 98.75 0.70 0.00

Local Panel for Winch St. Load Cable48 1,0NCUN4 1.0 0.1 94.51 90.19 94.93 4.33 0.00

Tripper car2 St. Load Cable47 1,0NCUN4 0.5 0.0 94.51 91.32 96.12 3.19 0.00
Project: ETAP Page: 13

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable / Busway 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 90.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

BusDuct3 Busduct Overload 2000.000 Amp 2062.312 103.1 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

LV MCC 01 Bus Under Voltage 0.400 kV 0.378 94.5 3-Phase


Project: ETAP Page: 14

Location: 22.5.0C Date: 24-04-2024

Contract: SN: WIKA-REKON

Engineer: Revision: Base


Study Case: LF EDG ON 1
Filename: PROYEK LINE 3 BUNATI ONSHORE Config.: EDG Crusher

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1.257 0.662 1.420 88.48 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 1.257 0.662 1.420 88.48 Lagging

Total Motor Load: 1.107 0.489 1.211 91.49 Lagging

Total Static Load: 0.126 0.078 0.148 85.04 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.023 0.095

System Mismatch: 0.000 0.000

Number of Iterations: 3