You are on page 1of 1

1.0 To keep the Pile on CG to th Pile cap, enlargement required is 700mm.

If we enlarge 700mm it encroach the proposed Soldier pile.

2.0 Minimum Grade of concrete required is 1800mm with C32/40.

Note: Maximum we can decrease the Pile cap depth as 1500mm if we follow C55/65 Concrete.
1870 1870
935 935 935 935
Old Pile Location
(pink colour)

New Pile Location


2560

2560
(Blue colour)
3700

3700
1613

1613
1140

1140
650 2900 650 650 2900 650
4200 4200

Pile cap with New pile Pile cap with New pile location
location alond with old pile (1000mm Pile)
location
As per permanent Pile
Proposed Pile location Location
to keep the CG of pile
cap.