Length (ft) bbl/ft Capacity gal/ft bbl Volume gal Time (min) Pump Strokes
Drill Pipe 11000 0.016 0.653 171.0 7181 29 1760
OH Annulus 2500 0.036 1.510 89.9 3776 15 925
Cased Annulus 8500 0.040 1.673 338.7 14224 58 3486
Hole Totals 599.5 25181 103 6172
Written by Vass Karatzas Mud Tanks 1500.0 63000 257 15441
WHITE TOWER CONSULTING Ltd.
TOTAL MUD 2099.5 88180 360 21613
Comments: vkaratzas@hotmail.com
Baryte Vol. Gain 53.4 2241 9 549
350
350 530
530 1700
1700 680
680 1700
1700 777
777 1700
1700 1200
1200 1700
1700 500
500 350
350 350
350
350
350 350
350 1700
1700 500
500 1420
1420 500
500 00 350
350 1420
1420 487
487 00 00
Since both Pump is Kill Mud Wt. The Pump Circ. Resumed Wellbore is
pressures are started reaches the bit is Stopped. & with Overkill. Displaced.
now equal to I.C. Pressure The Final The Well Past Strokes Pump's Off
Original SIDPP established Circulating Shut-in 2685
2685 Well is Shut-in
Pump Strokes Prepare to Pump Strokes & Overkill Pump Strokes Pressure Pump Strokes & Overkill Pump Strokes Use Pump Strokes & Overkill
set @ 0 kill the well 90 is build in 1760
1760 is in Effect 1760 bled off. 1850
1850 New MACP 6172
6172 is Bled Off
Strokes to mix Total System 22162 Strokes to Kill the Well 6172 maining Strokes to complete Mixing Circulation 15990