BQ Canopy & Kolam Ikan Marketing Gallery (Cek RBH) For Contractor
BQ Canopy & Kolam Ikan Marketing Gallery (Cek RBH) For Contractor
No Elemen Konstruksi Deskripsi Pekerjaan Satuan Volume CEK vol Harga Satuan (Rp) Total Harga (Rp)
RBH
No Elemen Konstruksi Deskripsi Pekerjaan Satuan Volume CEK vol Harga Satuan (Rp) Total Harga (Rp)
RBH
Besi 4D13, Sengkang ø8 - 150 kg 99.71 cek #REF! #REF!
Bekisting Kaso + Multiplek 9mm m2 8.80 cek #REF! #REF!
24 Balok beton BB (150x200) -
Beton K225 / Site mix m3 1.42 cek #REF! #REF!
Besi 4D10, Sengkang ø8 - 150 kg 216.32 cek #REF! #REF!
Bekisting Kaso + Multiplek 9mm m2 18.93 cek #REF! #REF!
Elevasi + 7.20
31 Plat beton S1 ( Tebal 10cm ) Beton K225 - Besi 2#ø8 - 150 m2 38.17 cek #REF! #REF!
32 Waterproofing Dan screed protection Sika top 107 + kain kasa fiber m2 38.17 cek #REF! #REF!
33 Konstruksi tangga beton putar Termasuk pondasi FP
Galian tanah pondasi m3 0.96 cek 88,000.00 84,150.00
Beton K225 / Site mix m3 1.90 cek #REF! #REF!
Besi ø12 - 150 kg 250.54 cek #REF! #REF!
Bekisting Kaso + Multiplek 9mm m2 10.20 cek #REF! #REF!
-
C Pekerjaan Atap #REF!
RANGKA ATAP
1 - Marketing Gallery termasuk overstek CNP 125x50x20x2,3mm finish Zinchromat, Long Drat M8 m2 208.17 cek #REF! #REF!
Material Atap dan Canal C SBO Atap Spandek 0.35 (Upah Pasang Saja) m2 208.17 cek 30,000.00 6,245,029.72
2 -Toilet Rangka Baja ringan C75 + Reng , Kencana atau setara m2 65.55 cek #REF! #REF!
Material Atap SBO Atap (Upah Pasang Saja) m2 65.55 cek 30,000.00 1,966,500.00
3 Plafond Overstek
GRC 4mm + Rangka Hollow 40x40x1,2 m2 72.93 cek #REF! #REF!
No Elemen Konstruksi Deskripsi Pekerjaan Satuan Volume Periksa RBH Harga Satuan (Rp) Total Harga (Rp)
TOTAL 307,083,500.00
Galian Tanah Ko
Jumlah P L T Luas Volume Jumlah
0.55 71.22 39.171 9
Pondasi FP5 R
Jumlah P L T Luas Volume Jumlah
Beton 16 0.5 0.5 0.2 0.80
Pasir Urug 16 0.5 0.5 0.05 0.20
Pasangan Keramik Ra
Jumlah P L T Luas Volume Jumlah
29.26 29.26 Vertikal 5
Horizontal 2
Dinding Ran
Jumlah P L T Luas Volume Jumlah
dinding 23 2.68 61.64
kolom (-) 9 0.2 2.68 4.824
56.816 Ran
Jumlah
Pasangan Rainchain Vertikal 48
Jumlah P L T Luas Volume Horizontal 6
6 3.7 22.2
Baseplate
P L BJ Tebal Volume
0.25 0.25 7850 0.012 47.10
0.3 7850 0.012 53.24
Rabat Beton
P L T Luas Volume
0.05 29.26 1.463
3.9 50.70
7.875 47.25
5.15 25.75
3.56 24.92
148.62
ANALISA BETON BERTULAN
Ukuran TULANGAN
Pokok Pembagi
NO
b h p Dia Brt Jml Tot Brt Dia Brt Jrk Jml
m m m mm Kg/m' bh Kg/m' mm Kg/m' m bh
FP5 0.50 0.50 0.20 10 0.62 3.3 2.88 10 0.62 0.15 3.33
B4C 0.15 0.35 1.00 13 1.04 6.0 6.25 8 0.39 0.18 5.71
B4D 0.15 0.35 1.00 13 1.04 6.0 6.25 8 0.39 0.18 5.71
B4E 0.15 0.35 1.00 13 1.04 6.0 6.25 8 0.18 0.18 5.71
B4F 0.15 0.35 1.00 13 1.04 7.0 7.29 8 0.39 0.18 5.71
B4K1 0.15 0.35 1.00 13 1.04 5.0 5.21 8 0.39 0.15 6.67
B4K2 0.15 0.35 1.00 13 1.04 7.0 7.29 8 0.39 0.15 6.67
B5 0.20 0.35 1.00 13 1.04 7.0 7.29 8 0.39 0.15 6.67
B5A 0.20 0.35 1.00 13 1.04 8.0 8.34 8 0.39 0.15 6.67
B5B 0.20 0.35 1.00 13 1.04 8.3 8.60 8 0.39 0.15 6.67
B5C 0.20 0.35 1.00 13 1.04 9.0 9.38 8 0.39 0.18 5.56
B5K1 0.20 0.35 1.00 13 1.04 7.0 7.29 8 0.39 0.15 6.67
B5K2 0.20 0.35 1.00 13 1.04 10.0 10.42 8 0.39 0.15 6.67
B6 0.15 0.40 1.00 13 1.04 5.0 5.21 8 0.39 0.18 5.71
B6A 0.15 0.40 1.00 13 1.04 5.5 5.73 8 0.39 0.18 5.71
B6B 0.15 0.40 1.00 13 1.04 5.5 5.73 8 0.39 0.18 5.71
B6C 0.15 0.40 1.00 13 1.04 6.0 6.25 8 0.39 0.18 5.71
B6D 0.15 0.40 1.00 13 1.04 6.0 6.25 8 0.39 0.18 5.71
B6E 0.15 0.40 1.00 13 1.04 6.0 6.25 8 0.39 0.18 5.71
B6F 0.15 0.40 1.00 13 1.04 7.0 7.29 8 0.39 0.18 5.71
B6K1 0.15 0.40 1.00 13 1.04 5.0 5.21 8 0.39 0.15 6.67
B6K2 0.15 0.40 1.00 13 1.04 7.0 7.29 8 0.39 0.15 6.67
B7 0.20 0.40 1.00 13 1.04 7.0 7.29 8 0.39 0.18 5.71
B7A 0.20 0.40 1.00 13 1.04 8.3 8.60 8 0.39 0.18 5.71
B7B 0.20 0.40 1.00 13 1.04 9.0 9.38 8 0.39 0.18 5.71
B7C 0.20 0.40 1.00 13 1.04 10.0 10.42 8 0.39 0.18 5.71
B7K1 0.20 0.40 1.00 13 1.04 7.0 7.29 8 0.39 0.15 6.67
B7K2 0.20 0.40 1.00 13 1.04 9.0 9.38 8 0.39 0.15 6.67
B8 0.20 0.40 1.00 16 1.58 7.0 11.05 10 0.62 0.18 5.71
B8A 0.20 0.40 1.00 16 1.58 7.5 11.84 10 0.62 0.18 5.71
B8B 0.20 0.40 1.00 16 1.58 9.0 14.20 10 0.62 0.18 5.71
B8C 0.20 0.40 1.00 16 1.58 9.0 14.20 10 0.62 0.18 5.71
B8K1 0.20 0.40 1.00 16 1.58 8.0 12.63 10 0.62 0.15 6.67
B8K2 0.20 0.40 1.00 16 1.58 10.0 15.78 10 0.62 0.15 6.67
B9 0.20 0.45 1.00 16 1.58 7.0 11.05 10 0.62 0.18 5.71
B9A 0.20 0.45 1.00 16 1.58 8.0 12.63 10 0.62 0.18 5.71
B9B 0.20 0.45 1.00 16 1.58 8.0 12.63 10 0.62 0.18 5.71
B9C 0.20 0.45 1.00 16 1.58 9.0 14.20 10 0.62 0.18 5.71
B9K1 0.20 0.45 1.00 16 1.58 10.0 15.78 10 0.62 0.15 6.67
B9K2 0.20 0.45 1.00 16 1.58 10.0 15.78 10 0.62 0.15 6.67
B10 0.25 0.45 1.00 16 1.58 9.0 14.20 10 0.62 0.18 5.71
B10A 0.25 0.45 1.00 16 1.58 10.5 16.57 10 0.62 0.18 5.71
B10B 0.25 0.45 1.00 16 1.58 10.5 16.57 10 0.62 0.18 5.71
B10C 0.25 0.45 1.00 16 1.58 11.0 17.36 10 0.62 0.18 5.71
B10K1 0.25 0.45 1.00 16 1.58 9.0 14.20 10 0.62 0.15 6.67
B10K2 0.25 0.45 1.00 16 1.58 11.0 17.36 10 0.62 0.15 6.67
Balok Kusen 0.11 0.11 1.00 8 0.39 4.0 1.58 6 0.22 0.20 5.00
Tangga
RTW
Kanopi
SB
S2
S1
SA BETON BERTULANG TERPASANG
TULANGAN
RATIO BESI & BEKISTING THD BETON
Pembagi Peminggang Beton Bekisting
Total Berat
Pjg Tot Brt Dia Brt Pjg Jml Tot Brt Beton Besi
m' Kg/m mm Kg/m' m' bh Kg/m' Kg/m' m3/m' m2/m' m3 Kg
1.00 162.00
1.00 125.00
1.00 100.00
1.00 61.70
1.00 102.80
1.00 99.69
& BEKISTING THD BETON
FW
m2
Jan 2013
4.44
3.33
6.00
10.00
10.00
13.33
13.33
13.33
13.33
8.33
18.18
13.33
20.00
13.33
12.33
23.33
13.33
11.67
16.67
17.33
25.00
30.00
13.33
13.33
30.00
17.33
8.00
16.19
16.19
16.19
16.19
16.19
16.19
12.86
12.86
12.86
12.86
12.86
12.86
15.83
15.83
15.83
15.83
15.83
15.83
15.83
15.83
15.83
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.50
12.22
12.22
12.22
12.22
12.22
12.22
10.22
10.22
10.22
10.22
10.22
10.22
18.18
26.00
10.00
10.99
2.00
10.00
10.00