Professional Documents
Culture Documents
UNFOUND Draw 26070-203-V14-CG00-J9327-00B
UNFOUND Draw 26070-203-V14-CG00-J9327-00B
PACKAGE 6 :
CONSULTING SERVICES FOR ONSHORE SITE DEVELOPMENT 2B, UNFORESEEN
SURVEY & STUDY FOR MODIFICATION PORT LOADING FACILITIES RDMP PROJECT
RU-V BALIKPAPAN
009/V10100/2018-SO
FINAL
GEO PENETRATING RADAR (GPR) SURVEY REPORT
PT. L A P I
PT PERTAMINA (PERSERO)
2018
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential
© 2016 PT Pertamina Persero (Pertamina). Contains information confidential and/or proprietary to Pertamina and
its affiliated companies that is not to be used, disclosed, or reproduced in any form by any non-Pertamina party
without Pertamina’s prior written permission. All rights reserved.
Revision History
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
PREFACE
Bandung, 19-Sep-18
Lead Researcher
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
TABLE OF CONTENTS
PREFACE ........................................................................................................... 3
TABLE OF CONTENTS ...................................................................................... 4
LIST OF FIGURES ............................................................................................. 6
LIST OF TABLES ................................................................................................ 8
1.0 INTRODUCTION ......................................................................................... 9
1.1. Background ....................................................................................... 9
1.2. Title .................................................................................................... 9
1.3. Owner................................................................................................. 9
1.4. Purpose and Objectives of the Work .............................................. 9
1.5. Project Location ................................................................................ 9
1.6. Document Reference ...................................................................... 11
1.7. Standard Codes and References ................................................... 11
1.8. Order of Predence........................................................................... 11
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
4.3.1. Data Interpretation Result at Area 1 RU-V Pertamina
Balikpapan ............................................................................ 26
4.3.2. Data Interpretation Result at Area 2 RU-V Pertamina
Balikpapan ............................................................................ 32
4.3.3. Data interpretation result at Area 3 RU-V Balikpapan ........... 38
4.3.4. Data interpretation Result at Area 4 RU-V Balikpapan ......... 41
4.3.5. Data interpretation result at Area 5 RU-V Balikpapan ........... 44
4.3.6. Data interpretation result at New Pipe Rack Route RU-V
Balikpapan ............................................................................ 50
4.3.7. Data interpretation result at CWI Route RU-V Balikpapan .... 53
4.3.8. Data interpretation result at Pipe Sleeper nearby Wax Plant
Route RU-V Balikpapan ........................................................ 54
4.4. Summary Object Detail ................................................................... 56
4.5. Unforeeen Verification by Excavation (Manual Digging) ............. 56
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
LIST OF FIGURES
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
Figure 4.19 Distribution map of Pipeline and Scrap Metal in Area 5 Part 3 ...... 47
Figure 4.20 Layout of New Pipe Rack Route at RU-V PT. Pertamina
Balikpapan ........................................................................................... 50
Figure 4.21 Distribution of active cable and pipeline at New Pipe Rack Part 1 . 51
Figure 4.22 Distribution of active cable and pipeline at New Pipe Rack Part 2 . 52
Figure 4.23 Distribution of active cable and pipeline at New Pipe Rack Part 3 . 52
Figure 4.24 Object mapping of pipeline at CWI................................................. 54
Figure 4.25 Object mapping at Pipe Sleeper nearby Wax Plant. ...................... 55
Figure 6.1 Photo documentary of GPR acquisition ........................................... 58
Figure 6.2 Photo documentary of GPR data acquisition with 200MHz at RU-
V .......................................................................................................... 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
LIST OF TABLES
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 9 of 59
1.0 INTRODUCTION
1.1. Background
In order to keep the supply of fuel oil (BBM) in domestic region that develop over
time, PERTAMINA intends to increase oil production in the RU-V Balikpapan, in
accordance with the program RDMP (Refinery Development Master Plan)
PERTAMINA. It is required supporting data as the basis of project for developing
site preparation and engineering design. PERTAMINA has been requested the
consultants to do the work to obtain the supporting data.
1.2. Title
Consulting Services for Onshore Site Development 2B, Unforeseen Survey &
Study for Modification Port Loading Facilities RDMP Project RU-V.
1.3. Owner
The purpose of the report is to present geo penetrating radar (GPR) survey report.
The objective of the report is to describe method of procedure and details of
unforeseen object identified by Geo Penetrating Radar (GPR) Survey.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 10 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 11 of 59
The following Applicable Codes and Standards are related with this document.
The order of precedence for conflicts in Laws, Regulations, Code and Standards,
applied to the RDMP RU-VProject is:
a. Indonesian Government laws, decrees and regulations;
b. Indonesian Codes and Standards;
c. PROJECT Documents, COMPANY Specification; and
d. International Regulations, Codes and Standards.
In the event of inconsistency or conflict between the documents and other
instrument, etc. referenced herein, in principle, the most stringent requirement
shall apply. However, conflicting requirement shall be brought to CONTRACTOR
attention for written clarification and PERTAMINA approval before proceeding with
the associated or affected work.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 12 of 59
a. Perform raw field data processing with related software to obtain an overview
of sub-surface geophysical structures
b. Conduct an interpretation in accordance with the survey results.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 13 of 59
b. Ensuring the excavation work with caution, so as not to damage vital objects
such as cables, pipes etc.
c. Conducting 1.5m deep excavation in the area of suspected cable & pipe from
the GPR survey result as verification of the existence of the object.
d. Ensuring the active/inactive functioning of the find object.
e. Protecting object findings that are still functioning (former refinery area).
f. Installing a steady and solid metal mark (permanent) 1m high with painting on
each corner of the find object.
g. Making sketch/drawing of the finding object mapping complete with
Coordinates, depth and location/area.
h. Making documentation/photos during implementation & object findings.
Figure 3.1 scope of GPR survey area inside RU-V Balikpapan refinery based on TOR
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 14 of 59
In georadar data acquisition, there are several types of antenna configurations, i.e.
Continuous Reflection Profiling (CRP), Common Midpoint (CMP) and Radar
Tomography. Each has a function and purpose, adjusted to the target
acquisitiondata. In this project we use Continuous Reflection Profiling (CRP)
antenna configuration for our georadar survey, where the transmitter and receiver
antenna mounted at a fixed distance with continuous data sampling.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 15 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 16 of 59
Material ࢿ࢘ V (m/ࣆ࢙ሻ
Air 1 300
Water (fresh) 81 33
Water (sea) 81 33
Sand (wet) 25 – 30 55 – 60
Agricultural land 15 77
Average ‘soil’ 16 75
Basalt 8 106
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 17 of 59
3.2.2. Equipments
Georadar survey conducted by using two equipments, namely IDS RIS TR 200
MHz and Zond12 300 MHz. The instrument with Zond12 brand is operated to
conduct a survey with 300 MHz antenna frequency which can achieve maximum
penetration up to 10 meters. The instrument with IDS brand is operated to conduct
a survey with 200 MHz antenna frequency which can achieve maximum
penetration up to 10 meters depth with high resolution target, so an image of
subsurface utilites such as pipes and other details can be detected.
Here are the technical specifications of the instruments used in this survey.
Table 2 Georadar equipment type 1 – IDS GPR
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 18 of 59
The survey results will be processed into images and interpreted based on the
desired target. As in figure below,
Example of pipeline
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 19 of 59
Georadar survey in the refinery area carried out by two teams each equipped with
a set of georadar equipments and measuring tape. The data acquisition carried
out by following the line in the survey plan that has been made with adjustment on
field conditions. The work duration for RU-V Balikpapan area is about four months.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 20 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 21 of 59
Based on TOR, GPR Survey Plan should accord to the microgravity anomaly
result. The interval between the lines should be 2.5 meter to get detailed data.
Figure below shows the area which is surveyed based on presence of microgravity
anomaly.
Figure 3.8 Georadar survey line in refinery area with based on microgravity survey
result
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 22 of 59
AREA /PROGRESS
NO SURVEY STATUS Jetty PIPERACK NEW PIPE TOTAL REMARK
1 2 3 4 5 6 7 8 CDU‐V CWI
Sulfur FLARE RACK
PLAN‐1 (Prediksi per 5M) 95,686 29,526 45,662 20,571 206,733 7,821 20,269 21,953 0 0 0 0 0 448,221 A 1. Progress GPR (refer hasil update Micrografity) = 84,463 KM
PROGRESS‐1 34,328 24,088 27,466 12,215 104,991 0 0 0 0 0 0 0 0 203,088 2. Progress GPR (refer BA penjelasan SOW) = 5,399 KM
PLAN‐2 (Hasil Microgravity) 66,008 5,562 17,754 3,999 165,243 0 0 0 0 0 0 0 0 258,567 3. Progress GPR (tambahan) = 4,486 KM
PROGRESS >>>PLAN‐2 27,417 2,541 13,339 2,274 38,892 0 0 0 0 0 0 0 0 84,463 4. Total Progress GPR = 94,348 KM
1 GPR (KM)
PROGRESS >>>BA Penj. SOW 0 0 0 0 0 0 0 0 0 621 0 0 4,779 5,399 B Catatan :
PROGRESS >>>TAMBAHAN 0 0 0 0 0 0 0 0 2,625 0 124 1,737 0 4,486 Sisa pekerjaan GPR (refer hasil update Micrografity) adalah
REMAINING AND CANNOT BE 174,104 KM, dengan rincian :
SURVEYED
38,591 3,021 4,415 1,725 126,351 0 0 0 0 0 0 0 0 174,104
a. 106 Km tidak dapat dikerjakan karena terkendala obstacle
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 23 of 59
4.0 CONCLUSION
At data acquisition stage, the georadar survey in RU-V Balikpapan area for Area
2, Area 3, Area 4, Area 5, New Pipe Rack Route, Pipe Sleeper nearby Wax Plant,
Jetty 7, and CDU V is carried out using a georadar equipment with 200 MHz and
300 MHz frequency. The 200 MHz and 300 MHz frequency are targeted to
produce detailed image onshore such as pipes, concretes and obstacles with
penetration up to 10 m depth.
The result of the survey line in all area is not entirely according to survey plan due
to some obstruction on the survey location such as concretes, scrap, mound, and
pipe sleeper.
After data acquisition we acquired raw data in *.dt format for georadar instrument
with 200 MHz frequency and *.sgy format for Zond. Later, both data format will be
processed in data proccesing using ReflexW software.
At data processing stage we used frequency filt
ering in order to obtain data corresponding to the target frequency of the operated
device. Noise removal is also used to clean up the data from unwanted signals,
and singal amplification to clarify the anomaly signal so we can read and interpret
easily.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 24 of 59
Here are the data processing stages that we do to the georadar data:
From the results of georadar data processing that has been done, the data is
ready to read and interpreted.
The result from georadar data that have been processed then carried to
interpretation stage. The interpretation process is based on phenomenon and
anomaly that appear on the image of georadar data. The parameters we used to
indentify georadar data in this interpretation are:
1. Amplitude uniformity
2. The speed of propagation
3. Wave continuity
4. Form of response wave (reflection, refraction and diffraction)
5. Color on the radargram
We already compare the georadar result to as-built drawing from WIKA (Doc.
RDMP-WKA-DWG-50-0027-A3: Layout Demolish Bangunan Rev.3 sheet 13). We
found that there are some mismatched result between LAPI drawing result and
WIKA as-built drawing(Fig. 4.2).
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 25 of 59
Figure 4.2 Comparison between A. LAPI Drawing Result and B. As-Built Drawing by
WIKA
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 26 of 59
According to data processing results. In Area 1, there are many anomalies shown
in difraction, pull up, and pull down form on radargram. First category for the 0-6 m
depth, there is a sight of dominant pipeline distribution, this anomaly shown
diffraction form in radargram. The pipeline position found in the certain location
and mostly found in the north side where there are so many installations of some
equipment. The pipe has a diameter of ± 20-28 inches with average long of ± 48
meters. The depth of the pipeline around 1-4 meters. For the detail position and
dimension will be explained as following figure and table.
In Area 1 part 1 for the obstacle category with 0-6 meters in depth, there is a sight
of dominant obstacles, this interpretation based on pull up anomaly form on
radargram. Those obstacles consist of metal scrap. The obstacles position found
in the certain location and mostly found in the west side which is there are so
many installation of some equipments. The obstacle has a variative in volume .The
depth of the obstacles around 1-4 meters
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 27 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 28 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 29 of 59
Table 4 Details of Obstacle in Area 1 Part 1, Area 1 Part 2, Area 1 Part 3, and Area 1 Part 4
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 30 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 31 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 32 of 59
In Area 2 for the 0-6 m depth category, there is a sight of dominant pipeline
distribution. The pipeline position found in the certain location and mostly found in
the west side which is there are so many installation of some equipments. The
pipe has a diameter of ± 20-28 inches with average long of ± 48 meters. The
depth of the pipeline around 1-4 meters.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 33 of 59
Electricity cable system which is 0-6 m depth category, there is a sight of active
electricity cable. The active cable has diameter of ± 8-12 centimeters with average
long of ± 48 meters. The depth of the active electricity cable around 1-4 meters.
The active cable position found in near the road and outside of the landfill area.
Obstacle category with 0-6 meters in depth, there is a sight of dominant obstacles.
Those obstacles consist of whether it’s wood, scrap or concrete. The obstacles
position found in the certain location and mostly found in the west side which is
there are so many installation of some equipments. The obstacle has a variative in
volume. The average volume is 2-5 m3. The depth of the obstacles around 1-4
meters for the detail position and dimension will be explained as following figure
and table.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 34 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 35 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 36 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 37 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 38 of 59
In Area 3 for the obstacle category with 0-6 meters in depth, there is a sight of
metal scrap. The obstacle positions are found in the certain location. The obstacle
has a variative in volume .The depth of the obstacles around 1-4 meters. At the 0-
8 m depth category, there is a sight of dominant pipeline distribution. The pipeline
positions are found in the certain location, mainly on the west. The pipe has a
diameter of ± 12-20 inches with average long of ± 100 meters. The depth of the
pipeline around 1-4 meters. For the detail position and dimension will be explained
as following picture and table.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 39 of 59
Coordinate
No Name Depth Size Area Volume
X Y
1 Metal Obstacle 1 479679.8851 9862242.285 1 4 4
2 Metal Obstacle 2 479641.0741 9862216.724 1.2 275 330
3 Metal Obstacle 3 479682.7846 9862213.263 1 3 3
4 Metal Obstacle 4 479649.8851 9862199.224 1.1 520 572
5 Metal Obstacle 5 479687.3851 9862199.224 1 25 25
6 Metal Obstacle 6 479642.3851 9862184.224 1.2 90.6 108.72
7 Metal Obstacle 7 479664.8851 9862184.224 1 2.5 2.5
8 Metal Obstacle 8 479675.1831 9862181.724 1 100 100
9 Metal Obstacle 9 479654.3346 9862167.224 1 253 253
10 Metal Obstacle 10 479639.8851 9862120.445 1.1 109 119.9
11 Metal Obstacle 11 479665.47 9862148.225 1 225 225
12 Metal Obstacle 12 479711.648 9862198.751 0.8 285 413.41
13 Metal Obstacle 13 479703.7322 9862155.064 0.83 79.8 139.689
14 Metal Obstacle 14 479702.4054 9862110.286 0.9 93 83.6559
479632.3851 479632.3851
15 Pipe 1 1 12"1
479707.3851 9862286.224
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 40 of 59
Coordinate
No Name Depth Size Area Volume
X Y
479632.3851 9862280.224
16 Pipe 2 1.2 12"1
479707.3851 9862280.224
479632.3851 9862273.224
17 Pipe 3 1 12"1
479707.3851 9862273.224
479632.3851 9862255.224
18 Pipe 4 1.1 12"1
479707.3851 9862255.224
479632.3851 9862251.224
19 Pipe 5 2 12"1
479707.3851 9862251.224
479632.3851 9862221.224
20 Pipe 6 1 12"1
479707.3851 9862221.224
479632.3851 9862207.224
21 Pipe 7 0.9 12"1
479707.3851 9862207.224
479632.3851 9862193.224
22 Pipe 8 1 12"1
479707.3851 9862193.224
479632.3851 9862187.224
23 Pipe 9 1.1 12"1
479707.3851 9862187.224
479632.3851 9862174.224
24 Pipe 10 1.2 12"1
479707.3851 9862174.224
479632.3851 9862164.224
25 Pipe 11 1 12"1
479707.3851 9862164.224
479699.8214 9862270.488
26 Pipe A 1 12"1
479734.8214 9862270.488
479699.8214 9862227.988
27 Pipe B 0.56 12"1
479734.8214 9862227.988
479699.8214 9862185.488
28 Pipe C 0.8 12"1
479734.8214 9862185.488
479699.8214 9862160.488
29 Pipe D 2.45 12"1
479734.8214 9862160.488
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 41 of 59
In Area 4 for the 0-8 m depth category, there were shown the pattern of difraction
on radargram in certain lines, this anomaly could be interpretated as pipeline. In
this Area, a sight of dominant pipeline distributed with both directions from north to
south and east to west. The pipeline positions found in the certain location, mainly
on the west. The pipe has a diameter of ± 12-20 inches with average long of ± 100
meters. The depth of the pipeline around 1-4 meters. For the detail position and
dimension will be explained as following figure and table.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 42 of 59
480379.2618 9861965.261
1 Pipe A 1.1 12"1
480306.7618 9861965.153
480379.2618 9861959.153
2 Pipe B 1.2 12"1
480306.7618 9861959.153
480379.2618 9861959.153
3 Pipe C 1.1 12"1
480306.8061 9861955.153
480379.2618 9861951.153
4 Pipe D 1 12"1
480306.7618 9861951.153
480379.2618 9861948.1
5 Pipe E 0.9 12"1
480306.7507 9861948.153
480379.2618 9861937.153
6 Pipe F 0.9 12"1
480306.8394 9861937.153
480379.2426 9861925.153
7 Pipe G 0.9 12"1
480306.7426 9861925.153
480379.2618 9861914.153
8 Pipe H 1 12"1
480306.7618 9861914.153
480343.261 9861874.153
9 Pipe I 1 12"1
480343.261 9861797.095
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 43 of 59
480327.2615 9861874.153
10 Pipe J 1 12"1
480327.2615 9861796.899
480318.2618 9861874.153
11 Pipe K 1.2 12"1
480318.2294 9861796.653
480313.2615 9861844.367
12 Pipe L 1.1 12"1
480313.261 9861796.867
480301.2618 9861874.153
13 Pipe M 1 12"1
480301.2618 9861796.653
480290.2616 9861844.153
14 Pipe N 1 12"1
480290.2616 9861744.315
480273.2616 9861844.153
15 Pipe O 1 12"1
480273.2616 9861744.153
480266.2618 9861844.153
16 Pipe P 1.2 12"1
480266.2618 9861744.153
480255.2618 9861844.153
17 Pipe Q 1.1 12"1
480255.261 9861744.153
480252.2618 9861844.153
18 Pipe R 1.2 12"1
480252.2618 9861744.153
480248.2618 9861844.153
19 Pipe S 1 12"1
480248.2618 9861744.153
480243.2618 9861844.153
20 Pipe T 1 12"1
480239.2618 9861744.153
480236.261 9861844.192
21 Pipe U 1 12"1
480236.2617 9861744.153
480234.2618 9861844.153
22 Pipe V 1 12"1
480234.2618 9861744.153
480233.2618 9861844.153
23 Pipe W 1 12"1
480233.2618 9861744.153
480232.2617 9861844.153
24 Pipe X 1 12"1
480232.2617 9861744.183
480225.2618 9861844.167
25 Pipe Y 1 12"1
480225.3358 9861744.167
26 Metal Obstacle 1 480370.6534 9861923.501 1 92 138
27 Metal Obstacle 2 479877.9828 9862840.797 1 276 414
27 Metal Obstacle 3 480329.6098 9861916.653 1 4 6
28 Metal Obstacle 4 480331.7618 9861796.653 1 83 124.5
29 Metal Obstacle 5 480334.2618 9861816.653 1 24 36
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 44 of 59
This is the largest Area in GPR Plan Survey. Based on the results of georadar
survey. The obstacle in this Area is dominated by pipelines, metal obstacle, and
concrete in various directions. This interpretation based on the radargram showing
so many diffraction waves, pull up, and pull down anomaly. There are few parts of
area 5 that has wood obstacle, which is located along line USL-01 to USL-07, at
around 20-30m from the West start of the line, at depths ranging from 1-4m. For
concrete, there is a huge slab suspected lying underneath the soil layer in shallow
depth, spreading all the way from line USL-01 to USL-10 length 30 to 75m, with
thickness reaching up to 1,5m The picture below shows the area where obstacles
were located.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 45 of 59
Figure 4.15 Distribution map of Obstacle and Scrap Metal in Area 5 Part 1
Figure 4.16 Distribution map of Obstacle and Scrap Metal in Area 5 Part 2
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 46 of 59
Figure 4.17 Distribution map of Pipeline and Scrap Metal in Area 5 Part 1
Figure 4.18 Distribution map of Pipeline and Scrap Metal in Area 5 Part 2
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 47 of 59
Figure 4.19 Distribution map of Pipeline and Scrap Metal in Area 5 Part 3
Table 8. Details of Obstacles in Area 5 Part 1, Area 5 Part 2, and Area 5 Part 3
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 48 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 49 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 50 of 59
4.3.6. Data interpretation result at New Pipe Rack Route RU-V Balikpapan
Figure 4.20 Layout of New Pipe Rack Route at RU-V PT. Pertamina Balikpapan
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 51 of 59
In this Area, the survey plan is designed by crossing pipe rack direction with
interval between lines 50 meters. Georadar equipment frequently received strong
wave responses at depth ±2 meters. This response we interpreted as active cable
because the strong difraction has been detected. This response is frequently
detected nearby Area 2, HCC, and Wax Plant. In addition, there are few pipes
detected at nearby HSE Office. Between existing building and existing pipe
sleeper. These are following figure and table in order to give the details about the
anomalies.
Figure 4.21 Distribution of active cable and pipeline at New Pipe Rack Part 1
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 52 of 59
Figure 4.22 Distribution of active cable and pipeline at New Pipe Rack Part 2
Figure 4.23 Distribution of active cable and pipeline at New Pipe Rack Part 3
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 53 of 59
Coordinate Depth
No Name Size
X Y (meter)
479788.952 9862779.272
1 NPR Active Cable A 1
479789.5322 9862437.034
479773.534 9862387.387
2 NPR Active Cable B 1
479775.285 9862139.877
479779.534 986238.387
3 NPR Active Cable C 1
479781.885 9862139.877
479635.008 9862812.08
4 NPR Active Cable S 1.56
479734.9424 9862812.645
479764.361 9862325.484
5 NPR Pipe A 1 5,46"
479764.356 9862288.4
479770.861 9862325.484
6 NPR Pipe B 1 5,46"
479771.356 9862288.401
479775.361 9862325.484
7 NPR Pipe C 1 5,46"
479775.356 9862288.401
479779.361 9862325.484
8 NPR Pipe D 1 5,46"
479779.356 9862288.401
480222.5016 9861871.04
9 NPR Pipe E 1.6 5,46"
480272.2657 9861871.044
480222.5016 9861869.637
10 NPR Pipe F 0.6 5,46"
480272.1567 9861869.329
480275.1923 9862125.133
11 NPR Pipe G 0.6 7,02"
480275.8942 9861925.359
479629.2276 9860896.83
12 NPR Pipe H 1.6 5,46"
479729.5418 9860892.342
479779.361 9862325.484
13 NPR Pipe I 1 5,46"
479779.361 9862325.484
479596.4292 9860996.713
14 NPR Pipe J 1 5,46"
479598.6292 9860946.713
In this area, there were two pipelines whose direction is east-west. These two
pipes are intersected by instalation of sheetpile. By using fourty megaheartz
frequency we could detect these two pipes in radargram which are shown as
strong difraction at depth five meters in subsurface. This following figure and table
will give the details of the pipes.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 54 of 59
Coordinate
No Name Depth (meter) Size
X Y
479526.4 9862012.8
1 Pipe A 479513.9 9862010.2 5 80"
479501.8 9862010.4
479526.3 9861996.8
2 Pipe B 479514.3 9862005.2 5 80"
479500.0 9862006.9
4.3.8. Data interpretation result at Pipe Sleeper nearby Wax Plant Route RU-V
Balikpapan
This area is one the location where new piperack will be built here. We designed
the survey lines crossing and parallel with the pipe sleeper. By seeing the strong
difraction and some of them are shown as pull up anomaly, so we interpret the
pipelines, metal obstacles, and active electrical cable burried along this pipe
sleeper area. The following figure and table will give the details of them.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 55 of 59
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 56 of 59
Here is the summary for all of the object based on georadar results from all area.
Table 12. Summary of Object Detail in Entire Area
The Excavation works will be conducted at 24th September 2018 and the result
will be reported in the next revision of this report and Object Mapping Drawing
Report.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 57 of 59
5.0 RECOMMENDATION
Based on our research of object mapping by using ground penetrating radar and
microgravity, we can get mapping of obstacle position and depth around refinery
area RU-V PT. Pertamina Balikpapan. This result could be one of reference for
civil engineer in building any construction by taking notice to shallow subsurface
circumstances.
GPR results only show active cable. Need further verification to identify passive
cable (verification should refer to As-Built Drawing issued by RU-V). As for pipe,
GPR couldn’t detect whether the pipe is still in service or not (need verification by
manual digging with RU-V supervision).
Need further study to determine pipeline and cable relocation.
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 58 of 59
6.0 DOCUMENTATIONS
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.
26070-203-V14-CG00-J9327-00B
Page 59 of 59
Figure 6.2 Photo documentary of GPR data acquisition with 200MHz at RU-V
Electronic documents, once printed, are uncontrolled and may become outdated.
Pertamina Confidential. © 2018 PT Pertamina Persero. All rights reserved.