0% found this document useful (0 votes)
30 views5 pages

Scupper Details for NYDOT Specifications

Uploaded by

AshutoshAparaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views5 pages

Scupper Details for NYDOT Specifications

Uploaded by

AshutoshAparaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BD-MS1E

1'-6•"

1'-2†"
1‹" 1‹"
5" OUTLET TO BE PLACED
AT LOW END OF SCUPPER
CURB
1‹"

3ˆ "
•" p

5"
SEAT FOR GRATING SHALL BE •" p
FABRICATED TO A TRUE PLANE
A A 1'-6•"

2‰ "
GROVE WELD

1‹ "
GRIND SMOOTH

8"
•" •"

-10„ "
(TYPICAL)

-6‚ "
2‰" 1" „" (SEE NOTE 2) 1" TYP.
SEAL WELD

1'

1'

2• "

3‡ "
TYP. „" 1‹"
‚ •" p •"
•"
5•" AT 6•" AT
2‰"
HIGH CORNER •" LOW CORNER
•"
1"
8"

SEE DETAIL "A"


SEE NOTE 1
DETAIL "A"
NOT TO SCALE
TYP. DO NOT WELD ALONG
3ˆ "


THIS SIDE OF TUBE

•" 5" •"


TYP.
1‹" ‚
•" TYP.

5‚" 8" 5‚" SEAL WELD (TYP.)


TAPPED HOLE
FOR •" DIA.
CAP SCREW SECTION A-A

ƒ" DIA. X 7•" LONG


NOTE:
HEADED CONCRETE
PLAN FABRICATED SCUPPER-TYPE "B2"
ANCHOR STUD (TYPICAL)
GRATING NOT SHOWN, SEE

2‰ "
SCUPPER GRATING DETAIL

1‹ "
ON BD-MS2E.
NOTES: 1" TYP.
538" 8" 538"
ALL MATERIAL SHALL BE GALVANIZED IN ACCORDANCE WITH N.Y.S.
STANDARD SPECIFICATIONS SUBSECTION 719-01. DESIGNER NOTES:
1‹"
THE SCUPPER MAY BE ROTATED 180n IF THE LOCATION OF THE OUTLET DETERMINE THE NUMBER †" †"
PIPE AS SHOWN WILL INTERFERE WITH OR DRAIN ON ANY PORTION OF THE 2‰"
OF SCUPPERS REQUIRED BASED ON THE
SUPERSTRUCTURE GIRDERS OR FRAMING. REQUIREMENTS OF HEC-21.

REFER TO NYSDOT BRIDGE


MANUAL SECTION 5 - BRIDGE DECKS FOR
DETAIL "B"
"

ADDITIONAL INFORMATION ON SCUPPERS.


16

"

NOT TO SCALE
16
1
2

3
3
5"

5"
†"
†" TYP.
8"

†"
B B
OUTLET TO BE PLACED AT
1'-5•"
LOW END OF SCUPPER †" †" NOTES:
-10… "

"
4

2• "
1
-6

•" 1. DIMENSION REQUIRED TO LOCATE BOTTOM OF SCUPPER FLUSH TO BOTTOM SURFACE OF


3‡ "

1" 1‰"
1'
1'

1‚" vSLAB AND TOP OF SCUPPER „ in. BELOW TOP SURFACE OF SLAB.
5‡ "

7„ "
2. IF SCUPPERS ARE LOCATED IN HAUNCH AREAS ABOVE BEAMS, THE SCUPPERS SHALL BE
8"

TAPPED HOLE FOR vBLOCKED UP OFF THE FORMS SO AS TO LOCATE TOP OF SCUPPER „ in. BELOW TOP SURFACE
ƒ" DIA. BOLT (TYP.) 1" vOF SLAB AS SHOWN.
1"
1•" TYP.
SEE NOTE 1 3. STRUCTURAL SLAB CONCRETE IMMEDIATELY ADJACENT TO SCUPPERS SHALL BE THOROUGHLY
†"
TAPPED HOLD FOR vVIBRATED DURING PLACEMENT TO ELIMINATE VOIDS WHICH COULD RESULT IN PREMATURE
•" CAP SCREW (TYP.)
"

vCONCRETE DETERIORATION.
"

5"
16
16

†"
3
1

4. IN CERTAIN CASES, THE SCUPPER DIMENSION SHOWN PERPENDICULAR TO THE CURB WILL BE
2

vINSUFFICIENT TO LOCATE THE DOWNSPOUT INSIDE THE FASCIA BEAM. IN THESE CASES, A
vLARGER SCUPPER, REQUIRING SPECIAL DETAILS, WILL BE REQUIRED.
ƒ" DIA. BOLTS (TYP.) SEE DETAIL "B"

5. DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE


INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL
CURB LINE SECTION B-B OTHER DETAILS, FOR WHICH NO SCALE IS SHOWN, ARE DRAWN
PROPORTIONAL AND ARE FULLY DIMENSIONED.

2116" 1'-258" 2116"


CAST IRON SCUPPER-TYPE "B1"

1'-634"
ISSUED STATE OF NEW YORK
01

DEPARTMENT OF TRANSPORTATION
DATE/TIM E = 19-APR-2016 12:

NOTES: 5/01/08
OFFICE OF STRUCTURES
PLAN REVISED
dgn

USER = jdellarocco

NOTE: EACH SCUPPER TO BE FURNISHED WITH 10v-vƒ" DIA. BOLTS,


8 in. LONG.
FILE NAM E = BD-M S1E.

GRATING NOT SHOWN, SEE


SCUPPER DETAILS
SCUPPER GRATING DETAIL SCUPPER AND PIPE SHALL BE CAST IRON. (1 OF 2)
ON BD-MS2E.
ALL MATERIAL SHALL BE GALVANIZED IN ACCORDANCE WITH
N.Y.S. STD. SPECIFICATIONS SUBSECTION 719-01. APPROVED:
ORIGINAL SIGNED BY ISSUED UNDER EB 08-002
GEORGE A. CHRISTIAN, P.E. EFFECTIVE WITH THE
DEPUTY CHIEF ENGINEER LETTING OF 1/08/09
(STRUCTURES)
BD-MS2E

CURB

NOTE: 2" COV. (TYP.)


WHEN TYPE "B1" SCUPPERS ARE USED,
A FLANGED OUTLET IS USED (SEE
DETAIL BELOW).
1‹"
•" p •" GRATING BAR (TYP.)

SCUPPER FRAME BRACING SYSTEM TO


3" (TYP.)

2• "
BE DESIGNED IF WEB
DEPTH EXCEEDS 3 ft.

2‰' A REMOVABLE DIFFUSER TO BE USED


IF SCUPPER IS LOCATED OVER LAND,
GROOVE WELD
UNLESS EROSION PROTECTION IS PROVIDED
GRIND SMOOTH OR FREE FALL EXCEEDS 25 ft.

SECTION A-A
DETAILS OF SPILL AREA FOR SCUPPERS
(FABRICATED SCUPPER & GRATE) 12-#5 EPOXY COATED BARS 3'-8" LONG.
NOT TO SCALE
NOT TO SCALE THESE BARS ARE TO BE PLACED IN A MAT
LOCATED BETWEEN THE MAIN SLAB
REINFORCEMENT (NOT SHOWN).

NOTE:

DOWNSPOUT TO BE EXTENDED 1'-0" BELOW


THE BOTTOM OF BOTTOM FLANGE. COST TO BE
INCLUDED IN THE PRICE BID FOR THE SCUPPER ITEM.

REINFORCEMENT PLAN AT SCUPPERS


TYPES "B1" & "B2"
NOT TO SCALE

A 2•" X •" p - A36,


A572 GR 50.

1'-4•" 9" SQUARE FLANGE

1‰" (TYP.)

4- †" DIA. HOLES IN FLANGES TO TAKE •" DIA.


2" (TYP.)
HEX HEAD BOLTS 2• in. LONG. EACH BOLT
5" (A307) TO BE SUPPLIED WITH A FLAT WASHER,
†" †"
1‹" (TYP.) SPRING LOCK WASHER AND A NUT.

† "
DIRECTION OF TRAFFIC
-8"
8 SPACES @ 2• " = 1'

„" RUBBER GASKET SUITABLE

† "
FOR WATER SERVICE.
-8• "
1'

•" •"

•" p (TYP.)

Œ" DIA. HOLE (TYP.)


1'-5" 1‰" (TYP.)
5"
†" †"
NOTE:

A PLAN c OF FLANGE
DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE
INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL
OTHER DETAILS, FOR WHICH NO SCALE IS SHOWN, ARE DRAWN
PROPORTIONAL AND ARE FULLY DIMENSIONED.
FLANGED CONNECTIONS FOR OUTLET
SCUPPER GRATING (FOR TYPES "B1" & "B2")
OF TYPE "B1" SCUPPER
STATE OF NEW YORK
03

NOT TO SCALE ISSUED


DEPARTMENT OF TRANSPORTATION
DATE/TIM E = 19-APR-2016 12:

5/01/08
OFFICE OF STRUCTURES
dgn

REVISED
USER = jdellarocco

NOTES:
NOTES:
FILE NAM E = BD-M S2E.

GRATING SHALL BE INCLUDED IN THE UNIT


SCUPPER DETAILS
FLANGES AND OUTLET SHALL BE DUCTILE IRON
PRICE BID FOR THE SCUPPER ITEM.
AND GALVANIZED, P.V.C., OR FIBERGLASS.
(2 OF 2)
ALL MATERIAL SHALL BE GALVANIZED IN ACORDANCE WITH
FLANGED CONNECTION IS TO BE INCLUDED IN
N.Y.S. STANDARD SPECIFICATIONS MATERIAL SPECIFICATION 719-01. APPROVED:
THE UNIT PRICE BID FOR THE SCUPPER.
ORIGINAL SIGNED BY ISSUED UNDER EB 08-002
GEORGE A. CHRISTIAN, P.E. EFFECTIVE WITH THE
DEPUTY CHIEF ENGINEER LETTING OF 1/08/09
(STRUCTURES)
BD-MS3E

6"u .20
6"u .20

3"u .10

+.04
u .04 +.06 -.03
WOOD FORM - REAR FACE OF WALL +.04 +.03 NOTES TO DESIGNER:
-.03 u .02
-.03 -.05
THE WATERSTOP TYPES LISTED BELOW SHALL BE USED
+.08
+.08 AT THE FOLLOWING LOCATIONS.
-.04
&" LONG ST -.05
VERTICAL @ 6"u CENTERS TYPE D: CONSTRUCTION AND CONTRACTION JOINTS.
u .04
u .04
R" TYPE E: EXPANSION JOINTS.
7 SPAC u .04
+.04
STAPLING TO WOOD FORM WILL
-.03
ONLY BE PERMITTED IN THIS u .06 TYPE A: CONSTRUCTION AND CONTRACTION JOINTS ONLY

AREA ON EACH SIDE. vWHEN A TYPE D CANNOT BE USED.

u .06
TYPE B: EXPANSION JOINTS WHERE ANTICIPATED
TYPE A WATERSTOP
vMOVEMENT IN EITHER DIRECTION DOES NOT
NOT TO SCALE vEXCEED 1".
TYPE D WATERSTOP vUSE ONLY WHEN A TYPE E CANNOT BE USED.
NOT TO SCALE TYPE A WATERSTOP:
TYPE CA: ONLY IN SPECIFIC ABUTMENT APPLICATIONS.
NOTES:
HOLES MUST NOT BE MADE IN WATERSTOP FOR ANY PURPOSE. vEXAMPLE: IN THE 1960’S AND 1970’S, "BR
vSHEETS" SHOWED TYPE CA WATERSTOP AT
HOLES MUST NOT BE MADE IN WATERSTOP FOR ANY
vTHE TOP OF ABUTMENT BACKWALLS. IT WAS
PURPOSE EXCEPT AS REQUIRED FOR STAPLING TO FORMS.
vUSED ADJACENT TO THE EXPANSION JOINT
vBETWEEN STRUCTURAL AND APPROACH SLABS
TYPE D WATERSTOP SHALL BE LIGHT GRAY IN COLOR.
vTO SEAL THE JOINT BETWEEN STRUCTURAL
vSLAB AND TOP OF BACKWALL. IF THIS DETAIL
vIS BEING RETAINED ON A WIDENING CONTRACT,
7"u .20 vTYPE CA WILL BE REQUIRED.

1" X "
WOOD FORM - REAR FACE OF WALL NAILED TO WOOD FORM

+.06 u .05 RADIUS +.03


1"

-.03 -.05
&" LONG ST
u .04 +.06
VERTICAL @ 6"u CENTERS
-.03

u .06
PREMOULDED RESILIENT
STAPLING TO WOOD FORM WILL
JOINT FILLER
ONLY BE PERMITTED IN THIS
AREA ON EACH SIDE.

+.06 1 "
-.03
STAGE ONE - PRIOR TO POURING CONCRETE NOTES:
+.06
7 SPAC
-.03
PVC USED IN WATERSTOPS SHALL CONFORM TO THE REQUIREMENTS
TYPE B WATERSTOP OF N.Y.S. STANDARD SPECIFICATIONS SUBSECTION 705-11.
7"u .20
NOT TO SCALE
THE COST OF FURNISHING AND PLACING WATERSTOPS SHALL BE

3 u .10 INCLUDED IN THE UNIT PRICES BID FOR THE CONCRETE ITEMS.
+.06 NOTES:

-.02 FIELD SPLICES SHOULD BE AVOIDED IF POSSIBLE, HOWEVER,


HOLES MUST NOT BE MADE IN WATERSTOP FOR ANY PURPOSE.
u .06 u .08 HEAT WELDED BUTT SPLICES WILL BE PERMITTED ON
LONG STRAIGHT RUNS (GENERALLY IN EXCESS OF 50

PVC INSERT FEET) AT POINTS APPROVED BY THE ENGINEER.

2" WIDE PRESSURE WATERSTOP SHALL BE SHIPPED IN STRAIGHT SECTIONS HAVING


+.04
u .04 A MINIMUM LENGTH OF 10 FEET UNLESS SHORTER LENGTHS ARE
-.02 SENSITIVE RELEASE TAPE
REQUIRED.

+.09 u .06
+.05 PREMOULDED RESILIENT JOINT FILLER SHALL CONFORM TO THE
-.04 -.02 REQUIREMENTS OF N.Y.S. STANDARD SPECIFICATION SUBSECTION 705-07.

+.02
-.05 DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE
1"u .08
u .04 INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL
+.05
+.06 OTHER DETAILS, FOR WHICH NO SCALE IS SHOWN, ARE DRAWN
-.02
-.03 PROPORTIONAL AND ARE FULLY DIMENSIONED.

TOLERANCES SHOWN FOR THIS


+.05
-.02
u .10

PREMOULDED RESILIENT DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE


DIMENSION APPLY TO PVC INSERT ONLY
5 SPA

JOINT FILLER INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL
+.05
OTHER DETAILS, FOR WHICH NO SCALE IS SHOWN, ARE DRAWN
-.02
PROPORTIONAL AND ARE FULLY DIMENSIONED.
2

u .04
+.06 +.06
STAGE TWO - AFTER FORMS HAVE BEEN REMOVED -.03 -.03

u .06

TYPE E WATERSTOP
NOT TO SCALE +.06
-.03 5 SPA u .04 +.05
-.02
NOTES:
8"u .20

ISSUED STATE OF NEW YORK


HOLES MUST NOT BE MADE IN WATERSTOP FOR ANY
5/01/08 DEPARTMENT OF TRANSPORTATION
PURPOSE EXCEPT AS REQUIRED FOR STAPLING TO FORMS.
OFFICE OF STRUCTURES
REVISED
TYPE E WATERSTOP AND PVC INSERT SHALL BE LIGHT GRAY IN COLOR.
PVC INSERT SHALL BE CLOSED CELL POLYVINYL (SP) GRADE VE-45 TYPE CA WATERSTOP POLYVINYL CHLORIDE (PVC)
AS PER ASTM D1667 OR CLOSED CELL RUBBER GRADE RE-45, NOT TO SCALE
CLASS E, AS PER ASTM D1056. NOTES: WATERSTOPS

PVC INSERT AND PRESSURE SENSITIVE RELEASE TAPE SHALL BE HOLES MUST NOT BE MADE IN WATERSTOP FOR ANY PURPOSE.
INSTALLED IN THE FIELD PRIOR TO PLACING THE BACKFILL. APPROVED:
ORIGINAL SIGNED BY ISSUED UNDER EB 08-002
GEORGE A. CHRISTIAN, P.E. EFFECTIVE WITH THE
DEPUTY CHIEF ENGINEER LETTING OF 1/08/09
(STRUCTURES)
SAW OR HAMMERED FACE 5" 3-29-22
SLOPE TOP OF CURB TO
FRONT ARRIS LINE
BACK ARRIS LINE MATCH OVERLAY.
BACK ARRIS LINE
CAULKING COMPOUND FOR STRUCTURES FRONT ARRIS LINE EXPOSED FACE
CONFORMING TO N.Y.S. STANDARD 5"
SPECIFICATIONS SUBSECTION 705-06. TOP OF PAVEMENT
5• "

6"
-4" u 1"

SPLIT FACE
1'

1•" 3"
9"

•" TOP OF SLAB


ANCHORS AT 2' MAX.
SPACING (MIN. 3 ANCHORS
PER LENGTH OF CURB) LOWER ARRIS LINE
2" 6"
CONCRETE BACKING FOR FULL
CAULKING COMPOUND FOR STRUCTURES 11"
LENGTH OF CURB. PAY FOR
•" MIN. DEPTH CONFORMING TO N.Y.S. STANDARD NO
UNDER CURB ITEM.
MORTAR BED SPECIFICATIONS SUBSECTION 705-06 -
TOOLABLE TYPE ONLY. CU
SAWED OR HAMMERED TOP, QUARRY SPLIT FACE
FA
AN
SECTION OF GRANITE BRIDGE CURB - TYPE F1 SECTION OF GRANITE BRIDGE CURB - TYPE A CO
IM
SH
NOTE: MA
NOTE: PR
ALL MORTAR SHALL CONFORM TO N.Y.S. STANDARD
SPECIFICATIONS SUBSECTION 705-21. ALL MORTAR SHALL CONFORM TO N.Y.S. STANDARD
SPECIFICATIONS SUBSECTION 705-21.
WHEN EPOXY COATED REINFORCEMENT IS USED MECHANICAL
CONNECTOR SHALL BE EPOXY COATED. THREADED
CONNECTIONS SHALL BE TORQUED TIGHT WITH WRENCH.
REINFORCE
BAR (TY
45n TY
BAR BAR ƒ" (MIN.) DEEP SAW CUT,
A MINIMUM 6" BEYOND
EACH SIDE OF UNSOUND OR
DELAMINATED CONCRETE AREA.
STAGE II STAGE I
NOTES:
MECHANICAL CONNECTOR DETAIL
CHIP AT A 45n ANGLE.
USE SHARP CHISEL BIT (N
NOTE:
WORK THE REMOVAL TOWA
MECHANICAL CONNECTORS SHALL CONFORM TO N.Y.S. STANDARD
REPAIR AREA.
SPECIFICATIONS SUBSECTION 709-10. COST OF MECHANICAL
CONNECTORS, FURNISHED AS PER DEPARTMENTS APPROVED LIST
SHALL BE INCLUDED IN THE UNIT PRICE BID FOR REBAR. CONCRETE REPA
(COLUMN SHOWN, OTHER RE
A
3'-0" 3'-0" 3'-0"
1'-3
c OF LIGHT POLE 5"
1'-3" DIA.
c OF LIGHT STANDARD PAID FOR UNDER ITEM 670.XXXX
BOLT CIRCLE
9" CAST IRON JUNCTION BOX

-6"
2-#5 BARS
(PAID FOR UNDER ITEM 670.40)

8"
1'

-7• "
FASCIA LINE

-4"
1'

1'
10•"
2" N.P.S. CONDUIT (TYP.)
PAID FOR UNDER ITEM 670.2003

-6"
c OF 2" N.P.S. CONDUIT

4'
1'-4
#5 BARS #4 BARS @ 4" (MAXIMUM) SPACING TRANSFORMER
dgn
35

#4 BAR NOTES:
DATE/TIM E = 16-M AR-2022 11:
FILE NAM E = BD-M S4E_2022.

FOR ADDITIONAL LIGHTING DETAILS, SEE N.Y.S. STANDARD


1'-6"
FASCIA LINE SHEET M670-2.
A
TRANSFORMER BASE SHALL BE DESIGNED TO BE ATTACHED
USER = gruth

TO 1" DIA. ANCHOR BOLTS ON A 1'-2" TO 1'-3•" DIAMETER


SECTION A-A
NOT TO SCALE
PLAN AT LIGHT POLE BOLT CIRCLE.
NOTE:
ANCHOR BOLTS AND STUDS SHALL CONFORM TO THE
N.Y.S. STANDARD SPECIFICATIONS SUBSECTION 723-60.
RAILINGv/vBARRIER SYSTEM NOT SHOWN
THE ADDITIONAL REINFORCEMENT (STIRRUPS) SHALL BE
LIGHTING DETAILS
EPOXY COATED BAR REINFORCEMENT FOR STRUCTURES.
BD-MS5E
C.I.P. PILE C.I.P. PILE H-PILE H-PILE
PILE PILE
APPROVED BACKING RING APPROVED BACKING RING
WITH ‰" THICKNESS WITH ‰" THICKNESS
INTERMITTENT SPACERS INTERMITTENT SPACERS

WEB
O.D. O.D. SEE NOTE 4 FOR
ƒ" p WEB
JOINT AND WELD
REQUIREMENTS.
SEE NOTE "A" SEE NOTE "A"
45n 45n

60n
CONICAL POINT COMMERCIAL OR COMMERCIAL OR
O.D.+†" PREFABRICATED SHOE PREFABRICATED SHOE

NOTE:
SEE WELDING NOTES.
NOTES: NOTES:

OPTIONS I AND II DIFFER ONLY 1. COMMERCIAL OR PREFABRICATED SHOES ARE SUBJECT TO THE APPROVAL OF THE DCES.
IN THE TYPE OF INTERMITTENT SPACER. CAST-IN-PLACE PILE SHOES
2. THE SHOE SHALL BE ATTACHED BY A NYSDOT CERTIFIED WELDER.
SEE WELDING NOTES.
DESIGNER NOTES: 3. A "WELDING PROCEDURE SPECIFICATION" (WPS) APPROVED BY THE DCES IS REQUIRED.

USE THE FLAT PILE SHOES UNLESS THE CONICAL TIP 4. THE SHOE WELD JOINT DESIGN SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S
SECTION THRU PILE AT SPLICE SECTION THRU PILE AT SPLICE IS CALLED FOR IN THE F.D.R. USE THE SHEET PILE RECOMMENDATION, AND AS SHOWN ON THE APPROVED WPS.
SHOES ONLY IF CALLED FOR IN THE F.D.R.
(OPTION I) (OPTION II) 5. IF SHOES ARE WELDED AT A LOCATION OTHER THAN THE PROJECT SITE, ALL OF THE ABOVE
FOR PROJECTS UTILIZING C.I.P. PILES, PROVIDE THE PROVISIONS SHALL APPLY TO THE OFFSITE FABRICATOR. THE DCES SHALL BE NOTIFIED BY THE
SPIRAL WELD TABLE AND APPROPRIATE NOTES FOUND CONTRACTOR OF THE ACTUAL LOCATION WHERE THE WELDING WILL BE PERFORMED A MINIMUM
WELDED SPLICE DETAILS
ON BD-PR7E IN THE CONTRACT PLANS. OF 5 WORKING DAYS BEFORE WORK COMMENCES.

6. ALL WELDING SHALL BE PERFORMED BY A CERTIFIED WELDER IN CONFORMANCE WITH


REQUIREMENTS FOR WELDING SPECIFIED IN THE N.Y.S. STEEL CONSTRUCTION MANUAL.
6-#6 BARS @
PILE
EQUAL SPACES

STEEL H-PILE SHOES


FOOTING 1-#3 SPRIAL BAR
NOT TO SCALE

-6" MIN.
SLEEVE

1" RADIUS

6'
PILE 2" COV. ACCESS HOLE
(LEAVE UNFILLED) STEEL BACKUP BAR
SLEEVE SEE B-U4b NOTE
ƒ "
6"

TO REMAIN IN PLACE

PILE `T1 45n 45n


SLEEVE ‚
B-U4a
SEE NOTE B
B-U4b „"
SLEEVE ‚"
PILE SECTION

33 ft. MIN
T1

NOTE:
NOTE: PILE SEE WELDING NOTES. JOINT B-U4b JOINT B-U4a
‡" SEE WELDING NOTES. 6-#6 BARS

END OF PILE

-2" MIN.

-5"
SPLICE FOR STEEL H-PILE

1'
3" MAX.
PILE ELEVATION

PITCH
SECTION THRU SLEEVE SECTION THRU PILE AT SPLICE

2'
(MECHANICAL SPLICE ONLY)

-0"
MECHANICAL SPLICE DETAILS 6" BOTTOM OF

2'
FOOTING
WELDING NOTES:

A "WELDING PROCEDURE SPECIFICATION" (WPS) APPROVED BY THE D.C.E.S.


CAST-IN-PLACE PILE SPLICE DETAILS 10 ft. MINIMUM OR 1/3 OF THE ESTIMATED
IS REQUIRED.

9" MAX.
PILE LENGTH, WHICHEVER IS GREATER, BUT

PITCH
ALL WELDING SHALL BE PERFORMED BY A CERTIFIED WELDER IN
NOT TO EXCEED A MAXIMUM OF 30 ft.
CONFORMANCE WITH REQUIREMENTS FOR WELDING SPECIFIED IN THE
N.Y.S. STEEL CONSTRUCTION MANUAL.

A: SIZE TO BE INDICATED IN THE F.D.R.

B: EITHER JOINT MAY BE USED AT CONTRACTOR'S OPTION.


-6" MIN.

B-U4b: AIR CARBON ARC GOUGE TO SOUND WELD METAL PRIOR TO


*#3 SPIRAL BARS WELDING THE SECOND SIDE. THE GOUGE SHALL HAVE A ‚" MINIMUM
RADIUS AT THE ROOT WITH THE TOP SLOPED BACK AT 45n MINIMUM.
2'

PILE ELEVATION
1'-0"
BOTTOM OF FOOTING

*TWO SEPARATE SPIRAL BARS MAY BE USED,


ONE FOR A PITCH OF 3" AND THE SECOND
CAST STEEL SHEET
15

CAST STEEL SHEET FOR A PITCH OF 9". IF TWO BARS ARE STATE OF NEW YORK
dgn

PILE PROTECTOR FOR ISSUED


DATE/TIM E = 16-M AR-2022 09:

PILE PROTECTOR USED, A WELDED SPLICE SHALL BE USED. 5/01/08 DEPARTMENT OF TRANSPORTATION
"Z" SECTIONS
FILE NAM E = BD-M S5E_2022.

OFFICE OF STRUCTURES
REVISED
NOTE:
CONTRACTOR MAY USE AN
MISCELLANEOUS
CAST-IN-PLACE CONCRETE PILE
USER = gruth

EQUIVALENT SYSTEM. PILE DETAILS


REINFORCEMENT
SHEET PILE SHOES H-PILE PILE EMBEDMENT ERRATA
APPROVED: 3-29-22
03/2022 ISSUED UNDER EB 22-014
EFFECTIVE IMMEDIATELY
DEPUTY CHIEF ENGINEER
(STRUCTURES)