Republic of the Philippines
DEPARTMENT OF HEALTH
Regional Health Office IX
LABUAN GENERAL HOSPITAL
Labuan , Zamboanga City, 7000
Email Address: lphchd@yahoo.com; lhg.bacsecretariat@gmail.com
Project Title: PROPOSED EXTENSION OF LAUNDRY AREA
Owner: Labuan General Hospital
Location: Labuan, Zamboanga City
BILL OF MATERIALS
ITEM ITEM DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT TOTAL
I SCAFFOLDING and STAGINGS
Scope of Works:
1. Installation of Scaffolds
20 pcs 2x3x10 Coco Lumber
100.00 BD.FT 28.50 2,850.00 2,850.00
4'' Common Wire Nail 3.00 kls 80.75 242.25 242.25
Php 3,092.25
II CONCRETE WORKS
Scope of Works:
1. Concrete of Floor Slab
Materials:
Portland Cement 45.00 Bags 285.00 12,825.00 12,825.00
Coarse Sand 75.00 Bags 42.75 3,206.25 3,206.25
Gravel G1 75.00 CU.M. 42.75 3,206.25 3,206.25
10mm def bars(grade 33) 32.00 lghts 190.00 6,080.00 6,080.00
#16 tie wire 5.00 kls 114.00 570.00 570.00
Php 25,887.50
III MASONRY WORKS
Scope of Works:
1. Laying of CHB Wall
2. Plastering of Walls
3. Installation of vertical & h
Materials:
4'' Concrete Hallow Blocks 60 Pcs 19.00 1,140.00 1,140.00
Fine sand (Plastering) 40 Bags 4.75 190.00 190.00
Php 1,330.00
IV ROOFING WORKS
Scope of Works:
1. Fabrication of Roof Frame
2. Installation of Roofing
Materials:
3''x2''x1.5mm thk C-Purlins 16 pcs 741.00 11,856.00 11,856.00
mm thk. Rib type roof (Galvalum) 56 lin.m 399.00 22,344.00 22,344.00
'' tekscrew with neoprene gasket 200 pcs 1.90 380.00 380.00
Wielding rod 5 kls 133.00 665.00 665.00
Red Oxide 1 GAL 798.00 798.00 798.00
Paint Thinner 5 bot 57.00 285.00 285.00
Paint brush 3 pcs 42.75 128.25 128.25
1/8'' dyna bolt 24 Pcs 28.50 684.00 684.00
Php 37,140.25
V PLUMBING WORKS
Scope of Works:
1. Installation of electrical ligh
Materials:
3'' PVC Pipe sch# 1000 4 pcs 522.50 2,090.00 2,090.00
3''x3'' PVC Wye 3 kls 304.00 912.00 912.00
3''x45 PVC elbow 3 set 356.25 1,068.75 1,068.75
3''x90 PVC elbow 2 Pcs 53.20 106.40 106.40
3'' PVC P-Trap 2 Pcs 399.00 798.00 798.00
'x4'' Stainless Steel Floordrain 2 Pcs 807.50 1,615.00 1,615.00
Php 6,590.15
VI ELECTRICAL WORKS
Scope of Works:
1. Installation of electrical ligh
Materials:
Tnhn #12 wire 30 mtrs 33.25 997.50 997.50
light receptacle 4 kls 304.00 1,216.00 1,216.00
2-gang switch 1 set 356.25 356.25 356.25
Surface type pvc switch box 2 pcs 53.20 106.40 106.40
Junction box 5 Pcs 30.00 150.00 150.00
Php 2,826.15
VII PAINTING WORKS
Scope of Works:
1. Painting of steel frames
2. Painting of masonry walls
quid tile primer white or equal 4 gals 1,140.00 4,560.00 4,560.00
Patching compound 5 kls 114.00 570.00 570.00
Liquid tile semi gloss or equal 5 gals 1,330.00 6,650.00 6,650.00
Liquid tile reducer or equal 3 kls 855.00 2,565.00 2,565.00
Asstd Sand Paper 6 shts 133.00 798.00 798.00
4'' Paint roller 3 Pcs 190.00 570.00 570.00
3'' Paint brush 3 Pcs 142.50 427.50 427.50
2'' Paint Brush 3 Pcs 142.50 427.50 427.50
Php 15,143.00
SUMMARY OF ESTIMATE
1 SCAFFOLDING and STAGIN 3,092.25
2 CONCRETE WORKS 25,887.50
3 MASONRY WORKS 1,330.00
4 ROOFING WORKS 37,140.25
5 PLUMBING WORKS 6,590.15
6 ELECTRICAL WORKS 2,826.15
7 PAINTING WORKS 15,143.00
TOTAL DIRECT COST(TDC) 92,009.30
VAT 5% of TDC 4,600.46
TOTAL INDIRECT COST(TIC) 4,600.47
GRAND TOTAL (TDC+TIC) 96,609.76
Delivery Period:
Thirty (30) days, upon receiving the Notice to Proceed.
Warranty:
Six (6) months warranty, after acceptance by the Procuring Entity of the delivered supplies.
Price Validity:
Thirty (30) Calendar days
Printed Name & Signature
Tel. No. Cellphone No., Email
address