Lifting Operations Risk Assessment Guide

risk assessment for lifting operations
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
442 views12 pages

Lifting Operations Risk Assessment Guide

risk assessment for lifting operations
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

RISK ASSESSMENT

RA # 02 LOCATION

TASK Lifting of Loading and Unloading Miscellaneous Materials

DATE Sep 21, 2023 New Revised Revision Date Sep 21, 2023

Cold Work Hot Work Excavation Confined Space Work At Height


1.0 Permit(s) Required:
LOTO Permit Night Work Radiography Lifting Permit Road Closure Permit

Hard Hat Fluorescent Reflective Vest Rain Suit Cut resistant gloves
Clear Safety Glasses Dust Mask Disposable Coverall Leather Gloves
Dark Safety Glasses Cartridge Respirator Mask Fire resistant coverall Rubber Gloves
2.0 PPE Required: Coverall Air supplied respirator Chemical Goggles Nitrile gloves
Cotton Gloves SCBA Cutting Goggles Elect Insulated gloves
Ear Plugs Face Shield Welding Aprons
Safety Shoes
Earmuffs Welding Hood Welding Leggings
Dielectric footwear
Special Tools and Gas Badge Anemometer Lifeline Fire Extinguisher
3.0 Equipment Dosimeter Lux Meter Retrieval Line Ventilation Fans
Required: Multi-Gas Monitor Noise Meter Full body Harness Lighting
Foreman / Supervisors to secure work permit before commencing activity and conduct brief safety talk
(E.g. toolbox meeting, topics shall include heat stress awareness).
Wear mandatory PPE’s (hard hats, safety glass, coverall, safety shoes, visibility vest)
Additional
4.0 Ensure availability of sufficient hydration and rest shade area.
Instructions
Maintain adequate supervision.
Dangerous occurrence, near miss and other related incident shall be reported accordingly.
Eltizam on Safe lifting operation &Neom SOP on safe lifting operation

Page 1 of 13
P a g e 1 | 10
RISK ASSESSMENT

RISK SCORE CALCULATOR


Use The Risk Score Calculator To Determine The Level Of Risk Of Each Hazard

What would What is the LIKELIHOOD of an occurrence? Hierarchy of Controls


the SEVERITY Severit Almos Very Very
Of an occurrence be? Likely Unlikely Can the hazard be Eliminated or removed from the work place?
y t Likel Unlikel
Rating Certai y y
n
Catastrophic
High High High Me Me Can the product or process be substituted for a less hazardous
Multiple Fatalities / 5 alternative?
Environmental release with detrimental effects requiring 25 20 15 d d
external emergency services
10 5
Major High High High Me Lo
Major Illness or Injury, disability/ 4 Can the hazard be engineered away with guards or barriers?
Environmental release with minimal off site impact 20 16 12 d w
8 4
Moderate
Serious but non-permanent injury or ill health High High Me Me Lo Can Administrative Controls be adopted
Work days lost/ 3 i.e. procedures, job rotation etc
On site release requiring environmental emergency 15 12 d d w
plan to be activated 9 6 3
Minor
Me Me Me Lo Lo
Medical attention needed. 2 Can Personal Protective Equipment & Clothing be worn to
No work restrictions./ d d d w w safeguard against hazards?
Local on site environmental release treated locally
10 8 6 4 2
Negligible Me Lo Lo Lo Lo
Minor cuts & bruises or sickness/ 1 d w w w w RISK RATING (Likelihood x Severity)
Nuisance release with no adverse
impact 5 4 3 2 1
1-4 LOW RISK (No further action required)
5-10 MEDIUM RISK (Procedure to be available)
Likelihood Rating 5 4 3 2 1 11-25 HIGH RISK (Full time supervision present)

Page 2 of 13
P a g e 2 | 10
RISK ASSESSMENT

SN Activity Potential Hazard L S RL Control Measures L S RR

1 Complete all • Missed information 3 3 9  Mobile plant and construction equipment vehicle Plan. 1 2 2
necessary • Incompliance to  Ensure Permit documents, Location drawing verify the HSE Team.
documents (Safe specification and  Work location physical examination by site foreman &HSE Team
Work Permit) Safety requirements.  Comply to the requirements lifting permit. Lifting accessories
Toolbox Meeting, • Missed steps. certificate, operator certificate by HSE Team
Lifting Plan • Working without valid  Work permit must be available before starting the job.
permit.  Conduct tool box meeting and discuss the activity before to start
 the work.
 A lifting plan must be prepared and implemented according to the
 lifting activity.
 Supervisor must be present during the lifting activity.
2 Pre-task briefing Lack of communication 4 5 20 Proper Communicate with all workers during work activity, permit 2 2 4
(Activity Briefing) and requirement to be communicated.
between workers may cause harm. Be undertaken at the point of work in languages the workers understand.
inspection
Unaware of significant hazards from Involve no more than 15 workers (optimum number of 8 people).
the task. Discuss with workforce all activity related significant hazards &control
Poor supervision at workplace measures with workforce.
Empower the workers to stop the work if it becomes unsafe
Activity briefing safety instructions by Foreman/supervisor.
All Supervisors should complete Projects Supervisor Activity Briefing
Training to support in the delivery of effective briefings.

Page 3 of 13
P a g e 3 | 10
RISK ASSESSMENT

SN Activity Potential Hazard L S RL Control Measures L S RR

3 Lifting Operation by Defective lifting equipment 4 5 20  Ensure lifting equipment (appliances and accessories) has valid 1 4 4
Crane, Boom Truck certification.
& Excavator  Inspect equipment prior to use and ensure that lifting accessories
(Loading/ Unloading, are correctly color coded.
& Installation of  Ensure equipment is regularly maintained, follow manufacturer’s
NJBs, port cabin, instructions.
generator).  Lifting equipment shall be inspected annually by 3rd party.
 All accessories (Lifting belts, lifting Chain, D-Shakel, chain slings)
shall be certified every 6 months by 3rd party and inspected on
regular basis by rigger/ inspector.
 Color coding procedures and tagging system to be implemented.
 Ensure excavator only designed by manufacturer with an eye on
the bucket’s head can be used for suspend, lower and raise the
load.
Incorrect use of lifting 5 4 20  Trained riggers, Person In Charge, crane operator etc. must 1 4 4
equipment be competent and qualified.
 Equipment operator required to carry out a daily inspection and
record it.
 Supervision of a competent supervisor is a must
Abrupt movements 3 4 12  Load to be lifted/lowered carefully 1 5 5
 Watch out for objects in the way of the load
 Operator to follow the signals of the trained rigger

4 Unstable, uneven ground 4 4 16  Position crane on stable and even ground 1 3 3


 Ensure the outriggers are set correctly
 Use mats under the outriggers to distribute ground pressure
 Keep sufficient distance from the edge of trenches
 Ensure riggers and crane operator are qualified Supervision

Page 4 of 13
P a g e 4 | 10
RISK ASSESSMENT

SN Activity Potential Hazard L S RL Control Measures L S RR

5 Improper handling of load 3 4 12  Check suitability of crane position in relation to radius, boom 1 3 3
length and load chart
 Make sure load down area is safe
 In case of loading a vehicle ensure its position is suitable
 Ensure correct and certified rigging is used
 Use tag lines to avoid swinging of the load
 Lift the load carefully 10-20cm before proceeding
 Ensure riggers and crane operator are qualified/certified
 Ensure crane operator will follow signals of trained
rigger Supervision
6 Suspended load 3 3 9  Personnel never to be allowed under suspended load or within 1 4 4
swinging radius
 No tools, food or drinks to be allowed near moving crane parts
 Use tag lines to avoid swinging of the load
 Cordon off area
 Restrict area to and limit number of authorized persons
 Crane operator shall not leave controls unattended
 Never leave load unattended
Supervision.

Overloading crane  Ensure correct capacity crane is selected 1 3 3


 Ensure load computer is working correctly
 Ensure load charts and boom angle indicator are available
4 5 20  SWL, inspection and next due date are displayed prominently on
the boom
 Load only to be lifted vertically.

Page 5 of 13
P a g e 5 | 10
RISK ASSESSMENT

SN Activity Potential Hazard L S RL Control Measures L S RR


Inadequate work space /  Plan the work to avoid congestion and conflicting tasks in that area
Congested area  Ensure adequate space is available to work and maneuver crane
and vehicle
 Parking not to be allowed in the area
5 4 20  Provide proper storage area 1 3 3
 Maintain good house keeping
 Use only qualified/certified riggers and crane operator
 Supervision.

Insufficient communication  Use only qualified/certified riggers and crane operator


 Ensure it is clear who is in charge (trained rigger)
 Ensure trained rigger is easily recognized by wearing a color vest or
4 4 16 1 3 3
helmet (red)
 Ensure rigger’s signals are understood and followed
 Restrict area to and limit number of authorized persons
Bad weather  Follow strictly crane manufacturers requirements for wind speed
 Stop work if the conditions are beyond the limit as mentioned by
4 3 12 1 5 5
manufacturer.
 No Lifting during adverse weather.
Heat stress.  Ensure to implement as per project approved, Heat Stress
Management.
 Install sun's shades and shelters appropriate for number of
working crews.
1 3 3
 Schedule work for the cooler time of the day or nightshift.
 Schedule work rest rotations and awareness briefing.
 Need to ensure no work proceed during summer break hours (12
noon to 15:00 Hrs.)

Page 6 of 13
P a g e 6 | 10
RISK ASSESSMENT

SN Activity Potential Hazard L S RL Control Measures L S RR

7 Equipment and Struck-by or Caught-in-between 3 4 12  Only trained and experienced operatives to be allowed to operate
Vehicles movement or vehicle contact with plant.
personnel/flagman/pedestrian.  Exclusive zone around the plant &equipment 10 meters, no person
Poor traffic signs and Allow to stand, sit near this 10-meter danger zone.
barriers.  Don’t leave(or)stand inside the construction vehicle cabin without
Poor vehicle access and Isolation the plant & equipment.
traffic routes.  Construction vehicle while Approaching parking zone need to have
Overturning / overloading maintain safe distance with another vehicle frontside 10 meter.
of vehicles.  A safe following distance of 20 meters in front of other heavy
equipment and 10 meters to the rear and sides.
 Plant &equipment parking in a sequence left to right &leave,
equipment leaves from parking zone from left to right.
 All parking zones secured with hard barriers with behind the
parking have pedestrian access to reach welfare area.
 Operatives must be in possession of a SAG license of competency
1 4 4
from government.
 Only properly maintained and inspected plant used.
 Operation or travel near to excavations will be prevented.
 Machine will be prohibited from approaching steelwork on which
 erectors are working at height or in confined space.
 Materials are only to be lifted using forks when not moving
 If materials are lifted on forks, measures to be taken when
 necessary (unbalanced load etc) to ensure material cannot slip
 thoroughly examined and tested at least every 12 months.

P a g e 7 | 10
RISK ASSESSMENT
Page 15 of 32

P a g e 7 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR

8 Lifting Operation Incompetent 4 4 16  TBT to be conducted and the entire hazard associated to be
operators/personnel.  discussed.
Run-over and back-over  MSRA Communicated with workforce.
injuries and worker  Lifting Supervisor Appointed for lifting operations
fatalities.  The operator shall have a valid Saudi Arabia Driving license and 3rd
party certification.
 All the vehicles in use at work site are to conform to Company.
 Periodic equipment /Vehicle maintenance to be done.
 Adhere to NEOM driving / road safety policy.
 In sand storm, the vehicle speed shall be reduced.
1 5 5
 Segregate pedestrians from machines.
 Installation of physical barriers like concrete jersey barriers, etc.
 Improve alert / awareness of mobile equipment
 Training of equipment operators and flag men.
 Trained flagman shall be in place and ensure that minimum
 Installation of warning signs, lights and alarms system.
 Equipment rotating radius shall be properly barricaded and no
 one shall enter the area during the operation.
 3rd Party equipment inspection or equipment ‘fit for purpose’
evaluation.

Page 16 of 32
P a g e 8 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR

9 Parking Improper parking of equipment at 4 5 16 Sequence of Parking and mobilization of plant:


workplace (MMI) Close parking During morning start the work shift, lunch break, shift change time
for equipment/truck Inadequate foreman ensure that entry &exit of plant and equipment at
physical barriers between men parking zone controlled.
machine moment area. Absence Plant &equipment park in a sequence left to right &leave, equipment
of warning signs for parking leaves from parking zone from left to right. (Parking zone Image
Operatives Sitting near the Attached)
parking equipment Poor hand Operation and plant mobilization must be done under supervision and
signal &poor communication on in a controlled manner, with a safe following distance of 20 meters in
hand signaling front of other heavy equipment and 10 meters to the rear and sides.
For Dump truck while travelling need to maintain front side 50-meter
safe distance. Plant &Equipment should not approach other Mobile
Plant and encroach on the 10m danger zone.

All items of mobile plant and equipment must be capable of 360-


degree vision or fitted with 360-degree visibility aids, such as reversing
cameras and Proximity sensors/alarms system in place.
1 3 3
Hand signal proper communicated with All Drivers, operators during
activity briefing.
Contractor will renew TMPs for all local or temporary vehicle and
equipment parking, quarantine and staging areas, to include a Zoning
Risk Plan for vehicle movements and access control for all personnel.

Need to maintain safe distance between to vehicle during parking.


Ensure adequate physical barricades in place to avoid MMI (Men
machine Interface)
Adequate illumination (Lux Lvel-10) in place for nightshift. No sitting
nearby parking areas. No person allows to sit &take rest nearby
parking equipment prohibited. All operatives Trained in men machine
Interface. Disciplinary action notice system in place.

Page 17 of 32 2_02
P a g e 9 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR

Prepared By Approved By
Name
Position Project Manager

Date

Signature

P a g e 10 | 10
P a g e 11 | 10

Page 1 of 13
P a g e 1 | 10
RISK ASSESSMENT
RA #
02
LOCATION
TASK
Lifting of Loading and Unloading Miscellaneous Materials
DA
Page 2 of 13
P a g e 2 | 10
RISK ASSESSMENT
RISK SCORE CALCULATOR
Use The Risk Score Calculator To Determine The Level Of Ris
Page 3 of 13
P a g e 3 | 10
RISK ASSESSMENT
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
1
Complete all 
neces
Page 4 of 13
P a g e 4 | 10
RISK ASSESSMENT
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
3
Lifting Operation b
Page 5 of 13
P a g e 5 | 10
RISK ASSESSMENT
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
5
Improper handling o
Page 6 of 13
P a g e 6 | 10
RISK ASSESSMENT
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
Inadequate work space
P a g e 7 | 10
RISK ASSESSMENT
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
7
Equipment and 
Vehicles movement
P a g e 7 | 10
RISK ASSESSMENT
Page 15 of 32
P a g e 8 | 10
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
8
Lifting Operation
Incompetent 
operators/personn
P a g e 9 | 10
SN
Activity
Potential Hazard
L
S
RL
Control Measures
L
S
RR
9
Parking
Page 17 of 32
Improper parking of equipm

You might also like