RA # 02 LOCATION
DATE Sep 21, 2023 New Revised Revision Date Sep 21, 2023
Hard Hat Fluorescent Reflective Vest Rain Suit Cut resistant gloves
Clear Safety Glasses Dust Mask Disposable Coverall Leather Gloves
Dark Safety Glasses Cartridge Respirator Mask Fire resistant coverall Rubber Gloves
2.0 PPE Required: Coverall Air supplied respirator Chemical Goggles Nitrile gloves
Cotton Gloves SCBA Cutting Goggles Elect Insulated gloves
Ear Plugs Face Shield Welding Aprons
Safety Shoes
Earmuffs Welding Hood Welding Leggings
Dielectric footwear
Special Tools and Gas Badge Anemometer Lifeline Fire Extinguisher
3.0 Equipment Dosimeter Lux Meter Retrieval Line Ventilation Fans
Required: Multi-Gas Monitor Noise Meter Full body Harness Lighting
Foreman / Supervisors to secure work permit before commencing activity and conduct brief safety talk
(E.g. toolbox meeting, topics shall include heat stress awareness).
Wear mandatory PPE’s (hard hats, safety glass, coverall, safety shoes, visibility vest)
Additional
4.0 Ensure availability of sufficient hydration and rest shade area.
Instructions
Maintain adequate supervision.
Dangerous occurrence, near miss and other related incident shall be reported accordingly.
Eltizam on Safe lifting operation &Neom SOP on safe lifting operation
Page 1 of 13
P a g e 1 | 10
RISK ASSESSMENT
Page 2 of 13
P a g e 2 | 10
RISK ASSESSMENT
1 Complete all • Missed information 3 3 9 Mobile plant and construction equipment vehicle Plan. 1 2 2
necessary • Incompliance to Ensure Permit documents, Location drawing verify the HSE Team.
documents (Safe specification and Work location physical examination by site foreman &HSE Team
Work Permit) Safety requirements. Comply to the requirements lifting permit. Lifting accessories
Toolbox Meeting, • Missed steps. certificate, operator certificate by HSE Team
Lifting Plan • Working without valid Work permit must be available before starting the job.
permit. Conduct tool box meeting and discuss the activity before to start
the work.
A lifting plan must be prepared and implemented according to the
lifting activity.
Supervisor must be present during the lifting activity.
2 Pre-task briefing Lack of communication 4 5 20 Proper Communicate with all workers during work activity, permit 2 2 4
(Activity Briefing) and requirement to be communicated.
between workers may cause harm. Be undertaken at the point of work in languages the workers understand.
inspection
Unaware of significant hazards from Involve no more than 15 workers (optimum number of 8 people).
the task. Discuss with workforce all activity related significant hazards &control
Poor supervision at workplace measures with workforce.
Empower the workers to stop the work if it becomes unsafe
Activity briefing safety instructions by Foreman/supervisor.
All Supervisors should complete Projects Supervisor Activity Briefing
Training to support in the delivery of effective briefings.
Page 3 of 13
P a g e 3 | 10
RISK ASSESSMENT
3 Lifting Operation by Defective lifting equipment 4 5 20 Ensure lifting equipment (appliances and accessories) has valid 1 4 4
Crane, Boom Truck certification.
& Excavator Inspect equipment prior to use and ensure that lifting accessories
(Loading/ Unloading, are correctly color coded.
& Installation of Ensure equipment is regularly maintained, follow manufacturer’s
NJBs, port cabin, instructions.
generator). Lifting equipment shall be inspected annually by 3rd party.
All accessories (Lifting belts, lifting Chain, D-Shakel, chain slings)
shall be certified every 6 months by 3rd party and inspected on
regular basis by rigger/ inspector.
Color coding procedures and tagging system to be implemented.
Ensure excavator only designed by manufacturer with an eye on
the bucket’s head can be used for suspend, lower and raise the
load.
Incorrect use of lifting 5 4 20 Trained riggers, Person In Charge, crane operator etc. must 1 4 4
equipment be competent and qualified.
Equipment operator required to carry out a daily inspection and
record it.
Supervision of a competent supervisor is a must
Abrupt movements 3 4 12 Load to be lifted/lowered carefully 1 5 5
Watch out for objects in the way of the load
Operator to follow the signals of the trained rigger
Page 4 of 13
P a g e 4 | 10
RISK ASSESSMENT
5 Improper handling of load 3 4 12 Check suitability of crane position in relation to radius, boom 1 3 3
length and load chart
Make sure load down area is safe
In case of loading a vehicle ensure its position is suitable
Ensure correct and certified rigging is used
Use tag lines to avoid swinging of the load
Lift the load carefully 10-20cm before proceeding
Ensure riggers and crane operator are qualified/certified
Ensure crane operator will follow signals of trained
rigger Supervision
6 Suspended load 3 3 9 Personnel never to be allowed under suspended load or within 1 4 4
swinging radius
No tools, food or drinks to be allowed near moving crane parts
Use tag lines to avoid swinging of the load
Cordon off area
Restrict area to and limit number of authorized persons
Crane operator shall not leave controls unattended
Never leave load unattended
Supervision.
Page 5 of 13
P a g e 5 | 10
RISK ASSESSMENT
Page 6 of 13
P a g e 6 | 10
RISK ASSESSMENT
7 Equipment and Struck-by or Caught-in-between 3 4 12 Only trained and experienced operatives to be allowed to operate
Vehicles movement or vehicle contact with plant.
personnel/flagman/pedestrian. Exclusive zone around the plant &equipment 10 meters, no person
Poor traffic signs and Allow to stand, sit near this 10-meter danger zone.
barriers. Don’t leave(or)stand inside the construction vehicle cabin without
Poor vehicle access and Isolation the plant & equipment.
traffic routes. Construction vehicle while Approaching parking zone need to have
Overturning / overloading maintain safe distance with another vehicle frontside 10 meter.
of vehicles. A safe following distance of 20 meters in front of other heavy
equipment and 10 meters to the rear and sides.
Plant &equipment parking in a sequence left to right &leave,
equipment leaves from parking zone from left to right.
All parking zones secured with hard barriers with behind the
parking have pedestrian access to reach welfare area.
Operatives must be in possession of a SAG license of competency
1 4 4
from government.
Only properly maintained and inspected plant used.
Operation or travel near to excavations will be prevented.
Machine will be prohibited from approaching steelwork on which
erectors are working at height or in confined space.
Materials are only to be lifted using forks when not moving
If materials are lifted on forks, measures to be taken when
necessary (unbalanced load etc) to ensure material cannot slip
thoroughly examined and tested at least every 12 months.
P a g e 7 | 10
RISK ASSESSMENT
Page 15 of 32
P a g e 7 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR
8 Lifting Operation Incompetent 4 4 16 TBT to be conducted and the entire hazard associated to be
operators/personnel. discussed.
Run-over and back-over MSRA Communicated with workforce.
injuries and worker Lifting Supervisor Appointed for lifting operations
fatalities. The operator shall have a valid Saudi Arabia Driving license and 3rd
party certification.
All the vehicles in use at work site are to conform to Company.
Periodic equipment /Vehicle maintenance to be done.
Adhere to NEOM driving / road safety policy.
In sand storm, the vehicle speed shall be reduced.
1 5 5
Segregate pedestrians from machines.
Installation of physical barriers like concrete jersey barriers, etc.
Improve alert / awareness of mobile equipment
Training of equipment operators and flag men.
Trained flagman shall be in place and ensure that minimum
Installation of warning signs, lights and alarms system.
Equipment rotating radius shall be properly barricaded and no
one shall enter the area during the operation.
3rd Party equipment inspection or equipment ‘fit for purpose’
evaluation.
Page 16 of 32
P a g e 8 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR
Page 17 of 32 2_02
P a g e 9 | 10
SN Activity Potential Hazard L S RL Control Measures L S RR
Prepared By Approved By
Name
Position Project Manager
Date
Signature