Instrument Layout for Slag Concentrator
Topics covered
Instrument Layout for Slag Concentrator
Topics covered
PLANT TN PN
1 INSTRUMENT TABLE
TRUE NORTH
0
NORTH
ELEVATION
22.96118 REF NO. TAG NUMBER LOC REMARKS
1 (EL+)
DOMINANT WIND
4852-HV-0130
270 90
A 4852-HY-0130 A
SECONDARY 48 F4
WIND 4852-ZSC-0130
4852-ZSO-0130 27 4852-LSHH-0012 9.260 F5
180
4852-HV-0131
4852-HY-0131 4852-XA-0003-A
F4 32 7.975 E5
49 4852-XL-0003-A
4852-ZSC-0131
4852-ZSO-0131 44 4852-XA-0003-B 9.956 F4
4852-XL-0004-A
45 13.326 F7
4852-XA-0004-A
46 4852-XL-0115 6.672 E4
KEY PLAN
47 4852-FSH-0115 6.104 E4
NOTES:
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED.
ALL LEVELS AND COORDINATES ARE IN METERS.
JUNCTION BOX TABLE
2. THE INSTRUMENT LOCATION/ELEVATION IS DECIDED BY CONSIDERING
ELEVATION
REF NO. TAG NUMBER LOC REMARKS THE INSTRUMENT CHARACTERISTICS, OPERABILITY AND MAINTAINABILITY.
(EL+)
J1 4850-F-RIB-110 5.380 D4
J2 4850-F-RIB-113 5.600 E4
J3 4852-F-PLC-001 9.105 E5
J4 4852-F-IPL-002 8.431 E5
1 J5 4852-JDC-501 9.508 F4
C
J7 4852-JDC-502 6.020 F4 C
J8 4852-F-PLC-003 9.135 E5
ML DWG NO. MS-DD-4850-ICS-DWG-0022 J9 4852-F-IPL-008 7.374 E5
J10 4852-JDS-501 8.370 F5
4852-FDA-0001 J11 4852-F-PLC-005 8.370 E5
3000
7592
6000
4850-SLF-0008 1 1
D 3759 D
SLAG CRUSHING
IPL
6000
J12
4852-CHU-0001
4852-FDR-0001
9245
6434
4852-CHU-0002
4852-CHU-0003
RIB
J1 J11 J3
ML DWG NO. MS-DD-4820-ICS-DWG-0033
8000 32 4852-SHR-0001
6000
E E
4852-CVR-0001
J4
IPL
J2
6000
RIB
1
1 4852-CVR-0002
45
44
6000
8000
LS 27
5150
JB
F J5 JB F
J10
4852-CTT-0001
48
3120
JB J7
49
4852-CHU-0006
3000
6000
4850-PRA-0005 4852-ZEP-0001
1500
G
16500 4000 10500 5000 4300 6000 11000 15000
FOR CONSTRUCTION G
CWA : 485D
0 2 4 6 8 10 20m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
PLANT TN PN
TRUE NORTH
0
NORTH
22.96118 INSTRUMENT TABLE
ELEVATION
REF NO. TAG NUMBER LOC REMARKS
DOMINANT WIND
1 (EL+)
270 90
A A
SECONDARY
WIND 4850-HV-0200
4850-HY-0200
180 2 5.034 F3
4850-ZSC-0200
4850-ZSO-0200
P.N 442.000 3 4850-FIT-0002 5.034 F3
P.E 901.000 4850-HV-0207
6000 6000 6000 6000 6000 6000
ML DWG NO. MS-DD-4850-ICS-DWG-0029
4850-HY-0207
4 5.007 F3
990
CL 6m ROAD 4850-ZSC-0207
1
8 4850-FIT-0003 5.112 F5
9 4850-PIT-0102 5.410 E5
10 4850-FIT-0004 6.269 F5
11 4850-PIT-0001 6.608 F6
12 4850-PIT-0005 6.155 F5
6000
1
13 4850-LSL-0004 5.750 F5
FIN FAN UNIT 14 4850-LIT-0003 13.468 F4
C (PART OF 4850-SUB-0001) C
4853-ZEP-0006
15 4850-AIT-0003 5.945 F5
CONCRETE CURB CONCRETE CURB 16 4850-AE-0003 5.250 1 F5
17 4850-LSLL-0002 5.250 F3
6500
18 4850-LIT-0001 9.377 F3
CL 6m ROAD
3500
19 4850-PIT-0010 5.570 E2
20 4850-PG-00004A 5.950 F5
21 4850-PG-00004B 5.950 F5
5000
22 4850-PG-00001B 5.795 F5
1 23 4850-PG-00002A 5.610 F6
CL 6m ROAD 4850-SUB-0001
10000
J3 JB 24 4850-PG-00002B 5.610 F6
1 25 4850-PG-00001A 5.770 F6
NB NB 1 J1
D D
J4 26 4850-PIT-0012 5.450 E3
6000
1 27 4855-LIT -0130 5421 B4
J2 FAP
4850-PRA-0004
3000
1
JUNCTION BOX TABLE
6000
ELEVATION
REF NO. TAG NUMBER LOC REMARKS
4000
(EL+)
J1 4850-JDC-201 9.778 D4
10300
J2 4850-B-FAP-001 9.628 D3
2500
1500
J3 4850-B-OFP-001 9.178 D4
19 1 9 J4 4850-B-OFP-002 9.178 D4
3000
3010
4850-PRA-0001 4850-SLF-0001
7
5 4 6 8
S
12
S S
M M
M M 10
2 3
11
4850-TNK-0001 4850-TNK-0003 13
15
F LS PG PG PG PG F
17 18 PH PG PG 22 25 23 24
14
19000
RAD
4850-PUM-0004B
4850-PUM-0004A
4850-PUM-0001B
4850-PUM-0001A
4850-PUM-0002B
4850-PUM-0002A
LS 21 20
RAD
16
J5
1
CL 15m ROAD
G
P.N 370.000 ML DWG NO. MS-DD-4810-ICS-DWG-0015 P.N 370.000
P.E 934.500
ML DWG NO. MS-DD-4850-ICS-DWG-0034 FOR CONSTRUCTION G
P.E 901.000
CWA : 485A
500 4000 5000 12000 6000 6000 6000 6000 6000 6000 6000 4500
0 2 4 6 8 10 20m
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
PLANT TN PN
TRUE NORTH
0
NORTH
22.96118
INSTRUMENT TABLE
DOMINANT WIND ELEVATION CABLE
REF NO. TAG NUMBER LOC DESTINATION REMARKS
270 90
(EL+) CODE
A 6000 6000 6000 6000 6000 6000 A
SECONDARY 1
WIND P.N 442.000
P.E 901.000 4850-HV-0200 - -
180 ML DWG NO. MS-DD-4850-ICS-DWG-0469 4850-HY-0200 E2C 4850-F-RIB-109
2 5.034 E4
4850-ZSC-0200 4850-F-RIB-109
990
CL 6m ROAD C4C
4850-ZSO-0200 4850-F-RIB-109
6000
1 4850-HV-0207 - -
4850-HY-0207 E2C 4850-F-RIB-109
4 5.007 E4
4850-ZSC-0207 4850-F-RIB-109 KEY PLAN
C4C
4850-SLF-0007
4850-ZSO-0207 4850-F-RIB-109
B1P 4850-F-RIB-109 NOTES:
6000
B 5 4850-FIT-0006 1 5.387 E4 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED.
B
L2C+E 4850-F-PDP-102 1
B1P 4850-F-RIB-201 ALL LEVELS AND COORDINATES ARE IN METERS.
6 4855-FIT-0033 4.994 E5
L2C+E 4850-F-PDP-104 1 2. THE ROUTE OF SECONDARY WIRING SHOWN ON THE DRAWING ARE FOR
4850-HV-0201 - - REFERENCE ONLY. THE LOCATION AND THE ROUTE SHALL NOT CAUSE
4850-HY-0201 E2C 4850-F-RIB-109 OBSTRUCTION OF OPERATION, MAINTENANCE SPACE, SUPPORTS AND
6000
CL 6m ROAD
3500
C 11 4850-PIT-0001 6.608 E7 B1P 4850-F-RIB-109 C
5000
14 4850-LIT-0003 13.468 F6 B1P 4850-F-RIB-109
1
CL 6m ROAD 4850-SUB-0001 15 4850-AIT-0003 5.945 F6 B1P 4850-F-RIB-109
10000
6000
L2C+E 4850-F-PDP-102
18 4850-LIT-0001 9.377 F5 B1P 4850-F-RIB-109
19 4850-PIT-0010 5.570 E3 B1P 4850-F-RIB-109
4850-PRA-0004
4000
10300
2500
1500
1
19
J1 4855-XS-0020 B4 D2C Pump Alarm
3000
3010
1B1P/1D2C-L50 1B1P-L50
1L2C+E-L50 4850-TNK-0003 1B1P-L50
1 4850-TNK-0001
LS
1D2C-L50 1B1P-L50 15
1B1P-L50 13 PH
1L2C+E-L50
19000
4850-PUM-0004B
4850-PUM-0004A
4850-PUM-0001B
4850-PUM-0001A
4850-PUM-0002B
4850-PUM-0002A
1 LS 1J-L50 1B1P/1D/2C-L50
RAD RAD
14 16
17 18
J1
F 1B1P-L50 F
500 4000 5000 12000 6000 6000 6000 6000 6000 6000 6000 4500
G
FOR CONSTRUCTION G
CWA : 485A
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
0 2 4 6 8 10 20m INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
288 4855-HV -0304 HV - ON-OFF VALVE BALL (CONTROL VALVE) MS-DD-4855-PRO-PID-5021 IA-BH11.101 HDG 015
289 4855-HV -0306 HV - ON-OFF VALVE BALL (CONTROL VALVE) MS-DD-4855-PRO-PID-5021 IA-BH11.101 HDG 015
290 4855-HV -0307 HV - ON-OFF VALVE BALL (CONTROL VALVE) MS-DD-4855-PRO-PID-5021 IA-BH11.101 HDG 015 SHEET NO.: JOB NO.:
IA-0000.005 ANX17
REV.
HOOK-UP FOR INSTRUMENT AIR DRAWING NO.
MS-DD-4850-ICS-STA-0401 1
1 2 3 4 5 6
PAGE NO. 6/27
1 2 3 4 5 6
PART IDENTIFICATION CODE NAME SPECIFICATION MATERIAL QTY TOTAL UNIT REMARKS NO. TAG NO. REMARKS
NO.
1 JT010054 TUBE 1/4"OD x 0.035"T 316SS SMLS 2 4038 m 1 4850-AV -0004
2 JT020058 MALE CONNECTOR 1/4"OD x 1/4"NPT 316SS, DOUBLE FERRULE 1 2019 pcs 2 4853-FV -0002
3 JT020059 MALE CONNECTOR 1/4"OD x 1/2"NPT 316SS, DOUBLE FERRULE 1 2019 pcs 3 4853-FV -0003
A A
4 JV010036 BALL VALVE 1/2"NPT(F), CL.600 A182-F316 WITH LEVER HANDLE 1 2019 pcs 4 4853-FV -0004
5 JP010171 PIPE 1/2", SCH80 A106-B SMLS HDG - - 1 m 5 4853-FV -0006
6 4853-FV -0007
7 4853-FV -0011
8 4853-FV -0013
9 4854-FV -0001
10 4854-FV -0003
11 4854-FV -0004
12 4854-FV -0008
13 4854-FV -0009
14 4854-FV -0049
1 19 4856-HV -0211 BV
20 4851-FV
- -0111
21 -
2 1 3 4 5 22 -
23 -
24 -
I AIN
P 25 -
NOTES:
C 1. BV: INSTRUMENT PROVIDED BY PACKAGE VENDOR. C
CONTROL VALVE
PROJECT
MS PROJECT
TITLE
D CONTROL VALVE D
WITH I/P POSITIONER
PART IDENTIFICATION CODE NAME SPECIFICATION MATERIAL QTY TOTAL UNIT REMARKS NO. TAG NO. REMARKS
NO.
1 JT010054 TUBE 1/4"OD x 0.035"T 316SS SMLS 2 10294 m 1 4850-HV -0200
2 JT020058 MALE CONNECTOR 1/4"OD x 1/4"NPT 316SS, DOUBLE FERRULE 1 5147 pcs 2 4850-HV -0201
3 JT020059 MALE CONNECTOR 1/4"OD x 1/2"NPT 316SS, DOUBLE FERRULE 1 5147 pcs 3 4850-HV -0207
A 51 A
4 JV010036 BALL VALVE 1/2"NPT(F), CL.600 A182-F316 WITH LEVER HANDLE 1 47 pcs 4 4851-HV -0101
5 JP010171 PIPE 1/2", SCH80 A106-B SMLS HDG - - 1 m 5 4854-HV -0200
6 4854-HV -0201
7 4855-HV -0052 A
8 4855-HV -0052 B
9 4855-HV -0052 C
10 4855-HV -0112
11 4855-HV -0122 BV
12 4855-HV -0124 BV
13 4855-HV -0201
NOTES:
C 1. BV: INSTRUMENT PROVIDED BY PACKAGE VENDOR. C
ON-OFF VALVE
PROJECT
MS PROJECT
TITLE
D ON-OFF VALVE D
WITH SINGLE SOLENOID VALVE
NOTES:
C 1. BV: INSTRUMENT PROVIDED BY PACKAGE VENDOR. C
PROJECT
MS PROJECT
TITLE
D ON-OFF VALVE D
WITH SINGLE SOLENOID VALVE
PLANT TN PN
TRUE NORTH
INSTRUMENT TABLE
0
NORTH ELEVATION
22.96118 REF NO. TAG NUMBER LOC REMARKS
(EL+)
DOMINANT WIND
PN 165.500 5000 6000 6000 6000 2700 4852-HV-0411 1 3653-FIT-0001 5.043 D5
PE 758.500 4852-HY-0411
270 90 1
A 7 D5 A
SECONDARY 4852-ZSC-0411
WIND
CL 6m ROAD 4852-ZSO-0411 4 4879-XA-8001 6.450 F5
180
5 4879-HS-8001 5.850 F5
6 4879-XA-8002 6.450 1 F5
3000-SLF-0005
6000
C C
D D
UP
J1
FAP
E E
4879-FAN-0001A
4879-FAN-0001B
1
4
F F
5
4879-PUM-0001A
ML DWG NO. MS-DD-4870-ICS-DWG-0016
G
FOR CONSTRUCTION G
4879-PUM-0001B
CWA : 487B
4879-PIT-0001
0 1 2 3 4 5 10m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
PLANT
TRUE NORTH INSTRUMENT TABLE TN PN
0
NORTH
ELEVATION
22.96118 REF NO. TAG NUMBER LOC REMARKS
(EL+)
DOMINANT WIND
1 4875-PIT-0102 5.880 D4
270 90 2 4875-PIT-0101 5.880 D4
6000 6000 6000 6000 6025 6000 5975
A SECONDARY 1 A
WIND
8750
13 4875-PG-00012B 5.720 G3
NOTES:
B 14 4875-LV-0015 5.029 G2 B
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED.
15 4875-PG-00014A 5.720 G5 1
ALL LEVELS AND COORDINATES ARE IN METERS.
16 4875-PG-00014B 5.720 G5
2. THE INSTRUMENT LOCATION/ELEVATION IS DECIDED BY CONSIDERING
17 4870-LSH-0012A 5.720 G5
THE INSTRUMENT CHARACTERISTICS, OPERABILITY AND MAINTAINABILITY.
18 4870-LSH-0012B 5.720 G5
1
J2 4870-SME-1504 5.392 D5
6500
3000-SLF-0005 3000-SLF-0005
C C
POWER DISTRIBUTION PANEL TABLE
ELEVATION
REF NO. PANEL NUMBER (EL+)
LOC REMARKS
P1 4870-F-PDP-101 5.920 D2
1
7 1 2 UP
UP
4852-HV-0410
1 IPL J2
4852-HY-0410
19 D4
D 4852-ZSC-0410 D
RIB
7
1
6000
4852-ZSO-0410
J1
ML DWG NO. MS-DD-4870-ICS-DWG-0017
RAD
4875-TNK-0009
8
4870-SLF-0001
RAD
4875-TNK-0007
6000
9
M
E E
6000
F 10 F
M
1
4875-PUM-0015A
4875-PUM-0015B
4875-PUM-0012A
4875-PUM-0012B
CATCH BASIN
11
M
UP
17 5
PG 12 PG 13 UP LS VS PG 15 PG LS VS 18
6000
DIKE
14 CURB 6 16
H = 200 (MIN.) H = 1500 (MIN.)
G
FOR CONSTRUCTION G
CWA : 487B
4500
0 1 2 3 4 5 10m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
PLANT TN PN
TRUE NORTH
INSTRUMENT TABLE
0
NORTH ELEVATION CABLE
22.96118 REF NO. TAG NUMBER LOC DESTINATION REMARKS
(EL+) CODE
DOMINANT WIND
PN 165.500 5000 6000 6000 6000 2700 B1P 4870-F-RIB-101
PE 758.500 1 3653-FIT-0001 5.043 D5
270 90 L2C+E 4870-F-PDP-101
A A
SECONDARY 4852-HV-0411
WIND
CL 6m ROAD 4852-HY-0411 E2C 4870-F-RIB-101
2 4734 C5
180
4852-ZSC-0411 D2C 4870-F-RIB-101
4852-ZSO-0411 D2C 4870-F-RIB-101
6000
C C
2
1 1
M
ML DWG NO. MS-DD-4870-ICS-DWG-0459
1B1P-L50
1E2C/2D2C-L50
1L2C+E-L50
D D
UP
CABLE TRAY
DESIGN BY VENDOR
4879-FAN-0001A
4879-FAN-0001B
F F
1
4879-PUM-0001A
ML DWG NO. MS-DD-4870-ICS-DWG-0456
G
FOR CONSTRUCTION G
4879-PUM-0001B
CWA : 487B
4879-PIT-0001
0 1 2 3 4 5 10m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.
PLANT TN PN
TRUE NORTH
INSTRUMENT TABLE
0
NORTH ELEVATION CABLE
22.96118 REF NO. TAG NUMBER LOC DESTINATION REMARKS
(EL+) CODE
DOMINANT WIND
1 4875-PIT-0102 5.880 D4 B1P 4870-F-RIB-101
270 90 2 4875-PIT-0101 5.880 D4 B1P 4870-F-RIB-101
A A
SECONDARY
WIND
6000 6000 6000 6000 6000 6000 6000 D2C 4870-F-RIB-107
5 4870-LSL-0010B 5.720 G5
1
180
D2C 4870-F-RIB-107
6 4870-LSL-0010A 5.720 G5
ML DWG NO. MS-DD-4210-ICS-DWG-0453
7 4875-LIT-0011 19.270 D5 B1P 4870-F-RIB-101
8 4875-LIT-0010 17.563 E3 B1P 4870-F-RIB-101
CL 6m ROAD
B1P 4870-F-RIB-101
9 4875-FIT-0010 17.778 E3
L2C+E 4870-F-PDP-101
B1P 4870-F-RIB-101 KEY PLAN
10 4875-FIT-0011 5.079 F2
1 L2C+E 4870-F-PDP-101
B1P 4870-F-RIB-101 NOTES:
B 11 4875-FIT-0013 5.029 F2 B
9000
L2C+E 4870-F-PDP-101 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED.
14 4875-LV-0015 5.029 G2 B1P 4870-F-RIB-103 ALL LEVELS AND COORDINATES ARE IN METERS.
17 4870-LSH-0012A 5.720 G5 D2C 4870-F-RIB-101 2. THE ROUTE OF SECONDARY WIRING SHOWN ON THE DRAWING ARE FOR
ML DWG NO. MS-DD-4870-ICS-DWG-0457
1 18 4870-LSH-0012B 5.720 G5 D2C 4870-F-RIB-101 REFERENCE ONLY. THE LOCATION AND THE ROUTE SHALL NOT CAUSE
OBSTRUCTION OF OPERATION, MAINTENANCE SPACE, SUPPORTS AND
JUNCTION BOX TABLE OTHER INSTALLATION WORKS. BEFORE INSTALLATION, THE ACTUAL
ELEVATION CABLE LOCATION AND THE ROUTE SHALL BE CAREFULLY DECIDED BY
REF NO. TAG NUMBER LOC DESTINATION REMARKS CONSIDERING THE FIELD CONDITION.
(EL+) CODE
J1 4870-F-RIB-101 5.610 D2 - - 3. LIGHTING CABLE IN INSTRUMENT CABLE TRAY:
1 J2 4870-SME-1504 5.392 D5 A5P 4870-PKG-0002_PCS
3000-SLF-0005 3000-SLF-0005 RATED O.D
NO. CABLE NO. SIZE FROM TO
VOLTAGE (mm)
POWER DISTRIBUTION PANEL
C 4870-LFX-5106 4870-LJB-5106 4870-LFX-5106 C
ELEVATION CABLE 1 0.6/1(1.2)kV 3C-4+E4 17
REF NO. PANEL NUMBER LOC DESTINATION REMARKS -0102-P -01A -0102
6000
(EL+) CODE
4870-ELF-5106 4870-LFX-5106 4870-LFX-5106
P1 4870-F-PDP-101 5.920 D2 - - 2 0.6/1(1.2)kV 3C-4+E4 17
-0103-P -0102 -0103
1 4870-ELF-5251 4870-LJB-5251 4870-ELF-5251
3 0.6/1(1.2)kV 3C-4+E4 17
-0107-P -01A -0107
1E2C/2D2C-L50 1
4852-HV-0131
4852-HV-0410
2B1P-L50 4852-HY-0410
4852-HY-0131
1 19
19 D3
1 4852-ZSC-0131
4852-ZSC-0410
PDP
2
1B1P/1A5P-L50 UP 4852-ZSO-0131
4852-ZSO-0410
P1
D 19 D
J1
1A5P-L50
NOTE 3
6000
RAD
7
8 2B1P-L50
1L2C+E-L50 4875-TNK-0009
4870-SLF-0001
RAD
E
4875-TNK-0007
1B1P-L50 E
1L2C+E-L50
6000
9
M
6000
F 1 F
10
2D2C-L50
1B1P-L50 M
4875-PUM-0015B
1L2C+E-L50 2D2C-L50
4875-PUM-0012A
4875-PUM-0012B
1B1P-L50 UP
1L2C+E-L50
1B1P-L50 6 LS VS LS VS 18
UP
6000
G
14 CURB
H = 200 (MIN.)
17 5
FOR CONSTRUCTION G
CWA : 487B
0 1 2 3 4 5 10m
THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
ML DWG NO. MS-DD-4870-ICS-DWG-0461 INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.