Laporan Kemajuan Pembangunan Satpas SIM

qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views17 pages

Laporan Kemajuan Pembangunan Satpas SIM

qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet qwetryuoiplkhgfadzvf qwet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Pemberi Tugas : Konsultan Perencana : Konsultan Pengawas : Konsultan Perencana :

POLDA METRO JAYA PT. PRADNYA PARAMITA KONSULTAN PT. DEMENSI RONAKON PT. ANUGRAH KARYA FORTUNA

RINCIAN LAPORAN KEMAJUAN FISIK PEKERJAAN


NAMA PEKERJAAN : KONSULTAN PENGAWAS PEMBANGUNAN SATPAS SIM PROTOTYPE POLRES METRO BEKASI KOTA T.A. 2024
LOKASI : Jl. Pramuka No.79, RT.001 / RW. 002 Marga Jaya, Kelurahan Kota Bekasi Kecamatan Bekasi, Jawa Barat 17141
Jawa Barat
MINGGU KE : 11 (Sebelas)

REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14

A PEKERJAAN PENDAHULUAN
A.I PEKERJAAN PERSIAPAN 1.06 1.06
1 Pek. Pengukuran Lahan Menggunakan Alat ha 0.68 827,506.87 562,704.67 0.003 0.68 0.00 100.00
2 Pek. Pembersihan Lahan Menggunakan Alat m2 3,400.00 11,772.34 40,025,956.00 0.189 3,400.00 0.19 100.00
3 Pek. Pembuatan Papan Nama Proyek 1 x 2 m bh 1.00 1,863,994.91 1,863,994.91 0.009 1.00 0.01 100.00
4 Pek. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2
meter m' 217.70 366,595.31 79,807,798.99 0.377 217.70 0.38 100.00
5 Pek. Pembuatan Direksikeet ( Kantor Los Pekerja dan Gudang) m2 48.00 1,909,201.48 91,641,671.04 0.433 48.00 0.43 100.00
6 Pek. Uitzet dan bouwplank m' 88.13 109,196.82 9,623,284.98 0.045 88.13 0.05 100.00
223,525,410.59
A.II SMKK
A.II.1 ALAT PELINDUNG KERJA DAN ALAT PELINDUNG DIRI
A.II.1.1 APD 0.19 0.16
1 Topi Pelindung (Safety Helmet) bh 65.00 38,985.98 2,534,088.70 0.012 38.00 0.01 58.46
2 Pelindung Mata (Goggles, Spectacles) bh 5.00 27,852.70 139,263.50 0.001 5.00 0.00 100.00
3 Pelindung Pernafasan dan Mulut (Masker) bh 5.00 2,228.22 11,141.10 0.000 5.00 0.00 100.00
4 Sarung Tangan (Safety Gloves) bh 15.00 5,013.99 75,209.85 0.000 15.00 0.00 100.00
5 Sepatu Keselamatan (Rubber Safety Shoes and toe cap) psg 65.00 94,727.61 6,157,294.65 0.029 35.00 0.02 53.85
6 Penunjang Seluruh Tubuh (Full Body Harness) psg 5.00 389,898.78 1,949,493.90 0.009 - - -
7 Rompi Keselamatan (Safety Vest) bh 65.00 39,001.59 2,535,103.35 0.012 38.00 0.01 58.46

A.II.2 ASURANSI DAN PERIJINAN


1 Asuransi (Construction All Risk/ CAR) ls 1.00 24,982,500.00 24,982,500.00 0.118 1.00 0.12 100.00

A.II.3 FASILITAS SARANA, PRASARANA DAN ALAT KESEHATAN


1 Peralatan P3K ls 1.00 749,250.00 749,250.00 0.004 1.00 0.00 100.00

A.II.4 RAMBU-RAMBU
1 Rambu Petunjuk bh 2.00 55,716.55 111,433.10 0.001 2.00 0.00 100.00
2 Rambu Larangan bh 2.00 55,699.83 111,399.66 0.001 2.00 0.00 100.00
3 Rambu Peringatan bh 2.00 55,694.25 111,388.50 0.001 2.00 0.00 100.00
5 Rambu Informasi bh 2.00 55,705.40 111,410.80 0.001 2.00 0.00 100.00

A.II.5 KONSULTASI DENGAN AHLI TERKAIT KESELAMATAN KONSTRUKSI (Tidak Diperlukan)


I KEGIATAN DAN PERALATAN TERKAIT PENGENDALIAN RESIKO KESELAMATAN KONSTRUKSI
1 Alat Pemadam Api Ringan (APAR) bh 1.00 724,242.68 724,242.68 0.003 1.00 0.00 100.00
2 Bendera K3 bh 1.00 66,866.55 66,866.55 0.000 1.00 0.00 100.00
40,370,086.34
A.III PEKERJAAN PEMATANGAN LAHAN 0.09 - 0.09
2 Pek. Galian Tanah m³ 512.34 38,530.88 19,740,879.89 0.093 512.34 0.09 100.00
19,740,879.89

B PEKERJAAN GEDUNG UTAMA


B.I PEKERJAAN STRUKTUR
B.I.1 PEKERJAAN STRUKTUR BAWAH
B.I.1.1 PEKERJAAN TANAH 0.66 - 0.50
1 Pek. Galian Tanah Pondasi m³ 41.51 32,865.11 1,364,230.72 0.006 41.51 0.01 100.00
2 Pek. Urugan Tanah Kembali m³ 13.84 75,013.16 1,038,182.13 0.005 13.84 0.00 100.00
3 Pek. Urugan Pasir Bawah Pondasi Foot Plat m³ 2.31 458,036.45 1,058,064.20 0.005 2.31 0.00 100.00
4 Pek. Urugan Pasir Bawah Lantai m³ 75.19 458,036.45 34,439,760.68 0.163 - - -
5 Pek. Urugan Tanah Peninggian Bangunan m³ 377.44 269,097.09 101,568,005.65 0.480 377.44 0.48 100.00
139,468,243.38
B.I.1.2 PEKERJAAN LANTAI KERJA 0.07 - 0.07
1 Pek. Lantai Kerja (bedding) m³ 4.61 1,112,770.99 5,129,874.26 0.024 4.61 0.02 100.00
2 Pekerjaan Lantai Kerja Sloof m³ 8.98 1,112,770.99 9,992,683.49 0.047 8.87 0.05 98.77
15,122,557.75
B.I.1.3 PEKERJAAN PONDASI PANCANG 1.71 - 1.71
1 Pek. Mobilisasi & Demobilisasi Peralatan Pancang unit 1.00 18,937,940.50 18,937,940.50 0.089 1.00 0.09 100.00
2 Pek. Pengadaan Pondasi Mini Pile 25x25 Panjang : 14 meter K.500 m' 1,026.00 228,827.87 234,777,394.62 1.109 1,026.00 1.11 100.00
3 Pek. Pemancangan m' 1,117.40 68,023.10 76,009,011.94 0.359 1,117.40 0.36 100.00
4 Pek. Last Joint joint 82.00 38,217.13 3,133,804.66 0.015 82.00 0.01 100.00
5 Pek. Pemotongan Tiang Pancang bh 82.00 199,359.73 16,347,497.86 0.077 82.00 0.08 100.00
6 Pek.Tes PDA titik 3.00 4,376,414.82 13,129,244.46 0.062 3.00 0.06 100.00
362,334,894.04
B.I.1.4 PEKERJAAN PILE CAP
1 Pekerjaan Pile Cap 75x75x40 cm (P1) 0.37 - 0.37
- Pek. Beton K-250 m³ 6.75 1,380,811.68 9,320,478.84 0.044 6.75 0.04 100.00
- Pek. Besi Ulir D 13 - 150 kg 830.80 18,373.38 15,264,604.10 0.072 830.80 0.07 100.00
- Pek. Bekisting untuk pondasi 3x pakai m² 36.00 185,027.69 6,660,996.84 0.031 36.00 0.03 100.00
2 Pekerjaan Pile Cap 150x75x40 cm (P2) - -
- Pek. Beton K-250 m³ 11.70 1,380,811.68 16,155,496.66 0.076 11.70 0.08 100.00
- Pek. Besi Ulir D 16 - 200 kg 554.21 18,373.38 10,182,710.93 0.048 554.21 0.05 100.00
- Pek. Besi Ulir D 13 - 150 kg 660.03 18,373.38 12,126,982.00 0.057 660.03 0.06 100.00
- Pke. Bekisting untuk pondasi 3x pakai m² 46.80 185,027.69 8,659,295.89 0.041 46.80 0.04 100.00
78,370,565.26
B.I.1.5 PEKERJAAN SLOOF
1 Pekerjaan Sloof 15x30 cm (S1) 1.43 - 1.43
- Pek. Beton K-250 m³ 4.29 1,380,811.68 5,923,682.11 0.028 4.29 0.03 100.00
- Pek. Besi ulir 4 D 16 kg 741.75 18,373.38 13,628,454.62 0.064 741.75 0.06 100.00
- Pek. Besi Polos Ø 10 - 200 kg 161.52 17,234.15 2,783,659.91 0.013 161.52 0.01 100.00
- Pek. Besi Polos Ø 10 - 200 kg 313.98 17,234.15 5,411,178.42 0.026 313.98 0.03 100.00
- Pek. Bekisting untuk sloof 3x pakai m² 57.25 191,266.07 10,949,982.51 0.052 57.25 0.05 100.00
2 Pekerjaan Sloof 25x45 cm (S2)
- Pek. Beton K-250 m³ 48.79 1,380,811.68 67,371,527.88 0.318 48.79 0.32 100.00
- Pek. Besi Ulir 6 D 16 kg 4,510.21 18,373.38 82,867,862.56 0.391 4,510.21 0.39 100.00
- Pek. Besi Polos Ø 10 - 150 kg 1,322.42 17,234.15 22,790,784.64 0.108 1,322.42 0.11 100.00
- Pek. Besi Polos Ø 10 - 200 kg 990.90 17,234.15 17,077,319.24 0.081 990.90 0.08 100.00
- Pek. Bekisting untuk sloof 3x pakai m² 390.33 191,266.07 74,656,885.10 0.353 390.33 0.35 100.00
303,461,336.98
B.I.1.6 PEKERJAAN KOLOM PEDESTAL
1 Pekerjaan Kolom Pedestal 20x30 cm (KPD 1) 0.61 - 0.61
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Pek. Beton K-250 m³ 0.13 1,380,811.68 179,505.52 0.001 0.13 0.00 100.00
- Pek. Besi Ulir 8 D 19 kg 160.31 18,373.38 2,945,436.55 0.014 160.31 0.01 100.00
- Pek. Besi Polos Ø 10 - 100 kg 19.76 17,234.15 340,546.80 0.002 19.76 0.00 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 2.20 244,825.77 538,616.69 0.003 2.20 0.00 100.00
2 Pekerjaan Kolom Pedestal 30x50 cm (KPD 2)
- Pek. Beton K-250 m³ 8.91 1,380,811.68 12,303,032.07 0.058 8.91 0.06 100.00
- Pek. Besi Ulir 12 D 19 kg 4,076.63 18,373.38 74,901,472.11 0.354 4,076.63 0.35 100.00
- Pek. Besi Polos Ø 10 - 150 kg 773.07 17,234.15 13,323,204.34 0.063 773.07 0.06 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 98.04 244,825.77 24,002,718.49 0.113 98.04 0.11 100.00
128,534,532.57
B.I.2 PEKERJAAN LANTAI 1
B.I.2.1 PEKERJAAN LANTAI BETON
1 Lantai Rabat Beton t = 10 cm 0.54 - 0.51
- Pek. Beton K-250 (Ready Mix) m³ 78.67 1,380,811.68 108,628,454.87 0.513 77.61 0.51 98.65
2 Pek. Rabatan Layout Plan Area Gedung Beton K-225 ( Ready Mix Tanpa Pompa ) m³ 4.56 1,319,405.84 6,016,490.63 0.028 - - -
114,644,945.50
B.I.2.2 PEKERJAAN KOLOM BETON
1 Pekerjaan Kolom Beton 20x20 cm (K4) 0.01
- Pek. Beton K-250 m³ 0.20 1,380,811.68 276,162.34 0.001 - - -
- 4 Ø 12 kg 20.47 17,234.15 352,783.05 0.002 - - -
- Pek. Besi Polos Ø 8 - 150 kg 12.12 17,234.15 208,877.90 0.001 - - -
- Pek. Bekisting untuk kolom 3x pakai m² 1.60 244,825.77 391,721.23 0.002 - - -
2 Pekerjaan Balok 20x20 cm
- Pek. Beton K-250 m³ 0.01 1,380,811.68 13,808.12 0.000 - - -
- 4 Ø 12 kg 2.29 17,234.15 39,466.20 0.000 - - -
- Pek. Besi Polos Ø 8 - 150 kg 0.71 17,234.15 12,236.25 0.000 - - -
- Pek. Bekisting untuk balok 3x pakai m² 0.32 244,825.77 78,344.25 0.000 - - -
1,373,399.33
B.I.2.3 PEKERJAAN BADUKAN BETON
1 Pekerjaan Badukan Beton 0.13
- Pek. Beton K-225 m³ 4.65 1,319,405.84 6,135,237.16 0.029 - - -
-Pek. Besi Polos 6 Ø 8 kg 271.68 17,234.15 4,682,173.87 0.022 - - -
- Pek. Besi Polos Ø 6 - 200 kg 133.83 17,234.15 2,306,446.29 0.011 - - -
- Pek. Angkur Ø 6 - 100 kg 23.26 17,234.15 400,866.33 0.002 - - -
- Pek. Bekisting m² 77.55 191,266.07 14,832,683.73 0.070 - - -
28,357,407.38
B.I.2.4 PEKERJAAN KANOPI BETON
1 Pekerjaan Plat Kanopi Type 3 t: 8 cm 0.01
- Pek. Beton K-225 m³ 0.29 1,319,405.84 382,627.69 0.002 - - -
- Pek. Besi Polos Ø 10 - 150 kg 30.84 17,234.15 531,501.19 0.003 - - -
- Pek. Bekisting untuk plat 3x pakai m² 3.50 299,856.23 1,049,496.81 0.005 - - -
1,963,625.68
B.I.2.5 PEKERJAAN TANGGA & BORDES
1 Pekerjaan Plat Tangga & Bordes Lt. 1 t : 12 cm 0.16 - 0.10
- Pek. Beton K-250 m³ 5.61 1,380,811.68 7,746,353.52 0.037 - - -
- Pek. Tulangan Anak Tangga Ø 10 - 200 kg 339.71 17,234.15 5,854,613.10 0.028 237.80 0.02 70.00
- Pek. Besi Ulir D 13 - 125 kg 574.20 18,373.38 10,549,994.80 0.050 574.20 0.05 100.00
- Pek. Bekisting untuk Tangga m² 40.20 245,627.28 9,874,216.66 0.047 28.14 0.03 70.00
34,025,178.07
B.I.2.6 PEKERJAAN PLAT MEJA WASTAFEL BETON
1 Pekerjaan Plat Meja Wastafel & Pantry t: 10 cm 0.01
- Pek. Beton K-175 (Mollen Mix) m³ 0.32 1,172,988.93 375,356.46 0.002 - - -
- Pek. Besi Polos Ø 8 - 150 kg 8.91 17,234.15 153,556.28 0.001 - - -
- Pek. Bekisting untuk plat 3x pakai m² 3.71 299,856.23 1,112,466.61 0.005 - - -
1,641,379.35
B.I.2.7 PEKERJAAN BAJA 9.36 - 9.15
1 Pek. Kolom Baja WF 250.125.6.9 (K1) kg 227.33 37,857.30 8,606,100.01 0.041 227.33 0.04 100.00
2 Pek. Kolom Baja WF 350.200.8.13 (K2) kg 3,427.20 37,857.30 129,744,538.56 0.613 3,427.20 0.61 100.00
3 Pek. Kolom Baja WF 400.200.8.13 (K3) kg 9,123.84 37,857.30 345,403,948.03 1.631 9,123.84 1.63 100.00
4 Pek. Balok Baja WF 200.100.5,5.8 (B1) kg 4,713.86 37,857.30 178,454,012.18 0.843 4,713.86 0.84 100.00
5 Pek. Balok Baja WF 250.125.6.9 (B2) kg 8,723.74 37,857.30 330,257,242.30 1.560 8,723.74 1.56 100.00
6 Pek. Balok Baja WF 350.175.7.11 (B3) kg 13,097.98 37,857.30 495,854,158.25 2.342 13,097.98 2.34 100.00
7 Pek. Pasangan Balok CNP 150.50.20.2 kg 158.28 29,724.07 4,704,725.80 0.022 158.28 0.02 100.00
8 Pek. Pasangan Balok CNP 150.50.20.2 Diatas Jendela kg 735.47 29,724.07 21,861,161.76 0.103 551.60 0.08 75.00
9 Pek. Besi Hollow 35.35.1,2 (Hitam) Penggantung CNP 150.50.20.2,3 Diatas Jendela kg 51.70 35,898.61 1,855,958.14 0.009 38.78 0.01 75.00
10 Pek. Pasangan Penggantung Hollow 40.60.1,4 (Kisi-kisi) kg 119.22 36,296.39 4,327,255.62 0.020 89.41 0.02 75.00
11 Pek. Plat Besi Plandes Kolom t = 15 mm kg 998.96 32,444.64 32,410,897.57 0.153 998.96 0.15 100.00
12 Pek. Angkur 6 Ø 19 L= 675mm kg 486.51 115,274.05 56,081,978.07 0.265 486.51 0.26 100.00
13 Pek. Angkur 4 Ø 19 L= 675mm kg 18.02 115,274.05 2,077,238.38 0.010 18.02 0.01 100.00
14 Pek. Stiffener PL t = 8 mm kg 4,642.78 32,235.85 149,663,959.66 0.707 3,482.09 0.53 75.00
15 Pek. Plat Joint t = 10 mm (End plate) kg 1,063.16 35,599.47 37,847,932.53 0.179 1,029.82 0.17 96.86
16 Pek. Plat Joint t = 12 mm (End plate) kg 1,540.49 35,592.89 54,830,491.12 0.259 1,540.49 0.26 100.00
17 Pek. Vute WF 200.100.5,5.8 kg 72.53 37,857.30 2,745,789.97 0.013 69.97 0.01 96.47
18 Pek. Vute WF 250.125.6.9 kg 495.80 37,857.30 18,769,649.34 0.089 495.80 0.09 100.00
19 Pek. Vute WF 350.175.7.11 kg 1,844.50 37,857.30 69,827,789.85 0.330 1,844.50 0.33 100.00
20 Pek. Mur Baut HTB M16 kg 596.52 61,568.58 36,726,889.34 0.173 594.68 0.17 99.69
1,982,051,716.48
B.I.2.8 PEKERJAAN RAILLING 0.15
1 Pek. Railling Tangga Utama m' 8.83 978,490.98 8,640,075.35 0.041 - - -
2 Pek. Railling Ramp Depan m' 11.30 978,490.98 11,056,948.07 0.052 - - -
3 Pek. Railling Ramp Belakang m' 12.12 978,490.98 11,859,310.68 0.056 - - -
31,556,334.10
B.I.3 PEKERJAAN LANTAI 2
B.I.3.1 PEKERJAAN LANTAI BETON
1 Pekerjaan Plat Lantai t = 12 cm 1.98 - 1.21
- Pek. Beton K-250 m³ 88.98 1,380,811.68 122,864,623.29 0.580 - - -
- Pek. Tulangan Wiremesh M8 kg 4,044.39 14,950.24 60,464,601.15 0.286 3,033.29 0.21 75.00
- Pek. Shear Conector D13 - 0,2 m kg 253.27 18,373.38 4,653,425.95 0.022 205.26 0.02 81.04
- Pek. Bekisting Bondex Tebal 0,75 mm m² 741.53 238,803.41 177,079,892.62 0.836 741.53 0.84 100.00
- Pek. Bekisting untuk plat 3x pakai m² 17.80 299,856.23 5,337,440.89 0.025 - - -
2 Pekerjaaan Plat Lantai t = 15 cm
- Pek. Beton K-250 m³ 11.21 1,380,811.68 15,478,898.93 0.073 - - -
- Pek. Tulangan Wiremesh M10 kg 407.32 14,944.19 6,087,067.47 0.029 305.49 0.02 75.00
- Pek. Shear Conector D13 - 0,2 m kg 68.28 18,373.38 1,254,534.39 0.006 51.21 0.00 75.00
- Pek. Bekisting Bondex Tebal 0,75 mm m² 104.90 238,803.41 25,050,477.71 0.118 104.90 0.12 100.00
- Pek. Bekisting untuk plat 3x pakai m² 6.03 299,856.23 1,808,133.07 0.009 - - -
420,079,095.47
B.I.3.2 PEKERJAAN PLAT BETON DROP OFF
1 Pekerjaan Plat Lantai t = 12 cm 0.20 - 0.12
- Pek. Beton K-250 m³ 9.58 1,380,811.68 13,228,175.89 0.062 - - -
- Pek. Tulangan Wiremesh M6 kg 435.14 16,604.77 7,225,399.62 0.034 326.36 0.03 75.00
- Pek. Shear Conector D13 - 0,2 m kg 43.92 18,373.38 806,958.85 0.004 37.77 0.00 85.99
- Pek. Bekisting Bondex Tebal 0,75 mm m² 79.84 238,803.41 19,066,064.25 0.090 79.84 0.09 100.00
- Pek. Bekisting untuk plat 3x pakai m² 5.35 299,856.23 1,604,230.83 0.008 - - -
41,930,829.45
B.I.3.3 PEKERJAAN BADUKAN BETON
1 Pekerjaan Badukan Beton 12 x 34 (BB) 0.13 - -
- Pek. Beton K-225 m³ 4.19 1,319,405.84 5,528,310.47 0.026 - - -
- Pek. Besi Polos 6 Ø 8 kg 209.38 17,234.15 3,608,486.33 0.017 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Pek. Besi Polos Ø 6 - 200 kg 44.49 17,234.15 766,747.33 0.004 - - -
- Pek. Angkur - Ø 6 - 100 kg 8.16 17,234.15 140,630.66 0.001 - - -
- Pek. Bekisting untuk plat 3x pakai m² 60.46 299,856.23 18,129,307.67 0.086 - - -
28,173,482.46
B.I.3.4 PEKERJAAN KANOPI BETON
1 Pekerjaan Plat Kanopi Type 3 t: 10 cm 0.03 - -
- Pek. Beton K-225 m³ 0.54 1,319,405.84 712,479.15 0.003 - - -
- Pek. Besi Polos Ø 10 - 150 kg 57.86 17,234.15 997,167.92 0.005 - - -
- Pek. Bekisting untuk plat 3x pakai m² 6.54 299,856.23 1,961,059.74 0.009 - - -
2 Pekerjaan Plat Kanopi Type 4 t: 10 cm
- Pek. Beton K-225 m³ 0.08 1,319,405.84 105,552.47 0.000 - - -
- Pek. Besi Polos Ø 10 - 150 kg 8.26 17,234.15 142,354.08 0.001 - - -
- Pek. Bekisting untuk balok 3x pakai m² 1.00 299,856.23 299,856.23 0.001 - - -
3 Pekerjaan Plat Kanopi Type 5 t: 10 cm
- Pek. Beton K-225 m³ 0.12 1,319,405.84 158,328.70 0.001 - - -
- Pek. Besi Polos Ø 10 - 150 kg 2.31 17,234.15 39,810.89 0.000 - - -
- Pek. Bekisting untuk plat 3x pakai m² 1.67 299,856.23 500,759.90 0.002 - - -
4 Pekerjaan Plat Kanopi Type 6 t: 10 cm
- Pek. Beton K-225 m³ 0.31 1,319,405.84 409,015.81 0.002 - - -
- Pek. Besi Polos Ø 10 - 150 kg 4.19 17,234.15 72,211.09 0.000 - - -
- Pek. Bekisting untuk plat 3x pakai m² 3.81 299,856.23 1,142,452.24 0.005 - - -
6,541,048.22
B.I.3.5 PEKERJAAN PLAT MEJA WASTAFEL BETON
1 Pekerjaan Plat Meja Wastafel & Pantry t: 10 cm 0.00 - -
- Pek. Beton K-175 (Mollen Mix) m³ 0.11 1,172,988.93 129,028.78 0.001 - - -
- Pek. Besi Polos Ø 8 - 150 kg 1.07 17,234.15 18,440.54 0.000 - - -
- Pek. Bekisting untuk plat 3x pakai m² 1.39 299,856.23 416,800.16 0.002 - - -
564,269.48
B.I.3.6 PEKERJAAN BAJA 3.89 - 3.30
1 Pek. Kolom Baja WF 400.200.8.13 (K3) kg 8,743.68 37,857.30 331,012,116.86 1.563 8,743.68 1.56 100.00
3 Pek. Balok Baja WF 200.100.5,5.8 (B1) kg 3,165.44 37,857.30 119,835,011.71 0.566 2,374.08 0.42 75.00
4 Pek. Balok Baja WF 250.125.6.9 (B2) kg 6,915.87 37,857.30 261,816,165.35 1.237 5,186.90 0.93 75.00
5 Pek. Pasangan Balok CNP 150.50.20.2,3 Diatas Jendela kg 404.93 29,724.07 12,036,167.67 0.057 303.70 0.04 75.00
6 Pek. Besi Hollow 35.35.1,2 Penggantung CNP 150.50.20.2,3 Diatas Jendela m' 58.10 35,898.61 2,085,709.24 0.010 43.58 0.01 75.00
7 Pek. Stiffener PL t = 8 mm kg 498.26 32,235.85 16,061,834.62 0.076 373.70 0.06 75.00
8 Pek. Plat joint t = 10 mm kg 254.84 35,599.47 9,072,168.93 0.043 191.13 0.03 75.00
9 Pek. Plat joint t = 12 mm kg 631.94 35,592.89 22,492,570.91 0.106 473.96 0.08 75.00
10 Pek. Vute WF 250.125.6.9 kg 769.60 37,857.30 29,134,978.08 0.138 577.20 0.10 75.00
11 Pek. Mur Baut HTB M16 kg 295.20 61,568.58 18,175,044.82 0.086 221.40 0.06 75.00
12 Pek. Tangga Maintenance m' 5.12 337,488.08 1,727,938.97 0.008 - - -
823,449,707.16
B.I.4 PEKERJAAN LANTAI 3 (ATAP)
B.I.4.1 PEKERJAAN LANTAI BETON (DAK ATAP) - -
1 Pekerjaan Plat Atap (12 cm) dan Pelat Tandon (15 cm) 1.05 - 0.49
- Pek. Beton K-250 m³ 57.87 1,380,811.68 79,907,571.92 0.377 - - -
- Pek. Tulangan Wiremesh M6 kg 1,046.02 16,604.77 17,368,921.52 0.082 784.52 0.06 75.00
- Pek. Tulangan Wiremesh M8 kg 374.74 14,950.24 5,602,452.94 0.026 281.06 0.02 75.00
- Pek. Shear Conector Ø10 - 0,2 m bh 241.43 17,234.15 4,160,840.83 0.020 181.07 0.01 75.00
- Pek. Bekisting Bondex Tebal 0,75 mm m² 463.57 238,803.41 110,702,096.77 0.523 347.68 0.39 75.00
- Pek. Bekisting untuk plat 3x pakai m² 13.76 299,856.23 4,126,021.72 0.019 - - -
221,867,905.71
B.II PEKERJAAN ARSITEKTUR
B.II.1 PEKERJAAN LANTAI 1
B.II.1.1 PEKERJAAN PASANGAN 1.85 - -
1 Pek. Pasang Dinding Bata Ringan Tebal 10 cm m² 921.98 192,566.83 177,542,765.92 0.839 - - -
- Pek. Pas Konektor Dinding Bata Ringan Besi Ø 8 - 1m kg 24.25 17,234.15 417,928.14 0.002 - - -
2 Pek. Pasang Dinding Bata Ringan Tebal 10 cm (Untuk diatasnya rollag) m² 131.40 192,566.83 25,303,281.46 0.120 - - -
3 Pek. Plesteran Mortar Siap Pakai ( MSP ) m² 932.96 85,569.87 79,833,265.92 0.377 - - -
4 Pek. Plesteran Mortar Siap Pakai (MSP) untuk Pasangan Bata Diatas Rollagh m² 25.21 85,569.87 2,157,216.42 0.010 - - -
5 Pek. Acian Mortar Siap Pakai ( MSP ) m² 932.96 53,268.29 49,697,183.84 0.235 - - -
6 Pek. Plesteran Skoning m' 171.93 62,663.96 10,773,814.64 0.051 - - -
7 Pek. Beton Bertulang Kolom Praktis 11 x 11 cm m' 272.25 132,347.31 36,031,555.15 0.170 - - -
8 Pek. Beton Bertulang Balok Latei 10 x 15 cm m' 62.79 168,190.20 10,560,662.66 0.050 - - -
392,317,674.15
B.II.1.2 PEKERJAAN KUSEN,PINTU DAN JENDELA 3.58 - -
1 Pek. Pemasangan Pintu Jendela (PJ1) unit 1.00 23,434,855.83 23,434,855.83 0.111 - - -
2 Pek. Pemasangan Pintu Jendela (PJ2) unit 1.00 17,296,944.87 17,296,944.87 0.082 - - -
3 Pek. Pemasangan Pintu Jendela (PJ3) unit 1.00 22,537,699.21 22,537,699.21 0.106 - - -
4 Pek. Pemasangan Pintu Kaca (PK1) unit 1.00 26,808,156.95 26,808,156.95 0.127 - - -
5 Pek. Pemasangan Pintu Kaca (PK2) unit 1.00 21,298,003.57 21,298,003.57 0.101 - - -
6 Pek. Pemasangan Pintu Kaca (PK3) unit 2.00 10,366,306.05 20,732,612.10 0.098 - - -
7 Pek. Pemasangan Pintu Kaca (PK4) unit 1.00 22,156,038.71 22,156,038.71 0.105 - - -
8 Pek. Pemasangan Pintu Kaca (PK5) unit 3.00 21,670,859.73 65,012,579.19 0.307 - - -
9 Pek. Pemasangan Pintu Kaca (PK6) unit 1.00 23,209,860.57 23,209,860.57 0.110 - - -
10 Pek. Pemasangan Pintu Kaca (PK8) unit 2.00 18,911,201.04 37,822,402.08 0.179 - - -
11 Pek. Pemasangan Pintu Kaca (PK10) unit 1.00 24,722,007.75 24,722,007.75 0.117 - - -
12 Pek. Pemasangan Pintu Geser (PG) unit 1.00 12,545,741.64 12,545,741.64 0.059 - - -
13 Pek. Pemasangan Pintu Geser (PG') unit 2.00 10,159,853.33 20,319,706.66 0.096 - - -
14 Pek. Pemasangan Pintu (P1) unit 2.00 5,816,830.67 11,633,661.34 0.055 - - -
15 Pek. Pemasangan Pintu (P1A) unit 5.00 6,201,696.08 31,008,480.40 0.146 - - -
16 Pek. Pemasangan Pintu (P3) unit 5.00 5,598,121.82 27,990,609.10 0.132 - - -
17 Pek. Pemasangan Pintu (P3A) unit 5.00 5,978,190.80 29,890,954.00 0.141 - - -
18 Pek. Pemasangan Pintu (P4) unit 2.00 6,775,802.34 13,551,604.68 0.064 - - -
19 Pek. Pemasangan Jendela (J1) unit 1.00 15,504,057.55 15,504,057.55 0.073 - - -
20 Pek. Pemasangan Jendela (J2) unit 2.00 9,593,597.39 19,187,194.78 0.091 - - -
21 Pek. Pemasangan Jendela (J3) unit 2.00 8,973,831.59 17,947,663.18 0.085 - - -
22 Pek. Pemasangan Jendela (J4A) unit 1.00 21,076,033.86 21,076,033.86 0.100 - - -
23 Pek. Pemasangan Jendela (J5) unit 1.00 8,303,964.07 8,303,964.07 0.039 - - -
24 Pek. Pemasangan Jendela (J6) unit 1.00 8,714,582.30 8,714,582.30 0.041 - - -
25 Pek. Pemasangan Jendela (J7) unit 1.00 8,292,713.60 8,292,713.60 0.039 - - -
26 Pek. Pemasangan Jendela (J8) unit 1.00 9,636,685.60 9,636,685.60 0.046 - - -
27 Pek. Pemasangan Jendela (J9) unit 1.00 14,008,257.48 14,008,257.48 0.066 - - -
28 Pek. Pemasangan Jendela (J9A) unit 1.00 19,927,500.61 19,927,500.61 0.094 - - -
29 Pek. Pemasangan Jendela (J10) unit 1.00 13,543,381.68 13,543,381.68 0.064 - - -
30 Pek. Pemasangan Jendela (J10') unit 2.00 15,488,934.03 30,977,868.06 0.146 - - -
31 Pek. Pemasangan Jendela (J10A) unit 1.00 19,699,354.40 19,699,354.40 0.093 - - -
32 Pek. Pemasangan Jendela (J16) unit 1.00 14,990,722.11 14,990,722.11 0.071 - - -
33 Pek. Pemasangan Jendela (J17) unit 1.00 8,588,777.59 8,588,777.59 0.041 - - -
34 Pek. Pemasangan Jendela (J18) unit 3.00 10,509,621.02 31,528,863.06 0.149 - - -
35 Pek. Pemasangan Jendela (J19) unit 1.00 6,256,479.67 6,256,479.67 0.030 - - -
36 Pek. Pemasangan Jendela (J20) unit 1.00 18,161,791.56 18,161,791.56 0.086 - - -
37 Pek. Pemasangan Jendela (JL) unit 1.00 3,047,771.14 3,047,771.14 0.014 - - -
38 Pek. Pemasangan Bovenlicht (BV) unit 6.00 664,654.76 3,987,928.56 0.019 - - -
39 Pek. Pemasangan Bovenlicht (BV1) unit 2.00 691,669.47 1,383,338.94 0.007 - - -
40 Pek. Pemasangan Bovenlicht (BV2) unit 2.00 1,017,445.07 2,034,890.14 0.010 - - -
41 Pek. Kisi-Kisi Hollow 50.100.3,2 kg 271.67 36,114.17 9,811,136.56 0.046 - - -
758,582,875.15
B.II.1.3 PEKERJAAN PENUTUP LANTAI DAN DINDING 2.12 - -
1 Pek. Pasang Lantai Interior Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 708.64 328,795.83 232,997,876.97 1.100 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
2 Pek. Pasang Lantai Exterior Granite Tile Matt Valentino Rover Beige ukuran (60 x 60) cm m² 145.01 299,628.94 43,449,192.59 0.205 - - -
3 Pek. Pasang Lantai Interior Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm Tangga & m² 122.34 328,795.83 40,224,881.84 0.190 - - -
4 Pek. Pasang Lantai KM Granite Tile Matt Valentino Mozart Dark Grey ukuran (60 x 60) cm m² 47.09 314,548.15 14,812,072.38 0.070 - - -
5 Pek. Pasang Dinding Granite Tile Valentino Gress Mozart Cemento ukuran (30 x 60) cm Toilet m² 281.43 362,919.70 102,136,491.17 0.482 - - -
6 Pek. Pasang Badukan Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 32.97 328,795.83 10,840,398.52 0.051 - - -
7 Pek. Pasang Meja Wastafel Granite Tile Matt Ticino Black Valentino ukuran (60 x 60) cm m² 4.24 349,786.67 1,483,095.48 0.007 - - -
8 Pek. Pasang Step Nosing 10 x 60 cm m' 51.37 64,978.23 3,337,931.68 0.016 - - -
449,281,940.63
B.II.1.4 PEKERJAAN PLAFON 1.01 - -
1 Pek. Pasang Rangka Plafon Hollow Gypsum Board m² 912.09 149,667.07 136,509,837.88 0.645 - - -
2 Pek. Pasang Penutup Plafon Gypsum Board tebal 9 mm m² 912.09 68,126.82 62,137,791.25 0.293 - - -
3 Pek. Pasang Rangka Plafon Hollow Kalsiboard Toilet m² 42.79 149,667.07 6,404,253.93 0.030 - - -
4 Pek. Pasang Penutup Plafon Kalsiboard tebal 4 mm Toilet m² 42.79 51,481.29 2,202,884.40 0.010 - - -
5 Pek. Pasang Shadowline (Tali Air) m' 463.60 15,566.28 7,216,527.41 0.034 - - -
214,471,294.86
B.II.1.5 PEKERJAAN DINDING PARTISI 0.11 - -
1 Pek. Pasang Rangka Partisi m² 112.10 134,900.93 15,122,394.25 0.071 - - -
2 Pek. Pasang Gypsum Board 12 mm m² 112.10 72,975.23 8,180,523.28 0.039 - - -
23,302,917.54
B.II.1.6 PEKERJAAN PENGECATAN 0.83 - 0.27
1 Pek. Pengecatan Dinding Interior m² 775.74 52,270.67 40,548,449.55 0.192 - - -
2 Pek. Pengecatan Dinding Exterior m² 141.34 61,104.17 8,636,463.39 0.041 - - -
3 Pek. Pengecatan Badukan m² 15.15 52,270.67 791,900.65 0.004 - - -
4 Pek. Pengecatan Plafon m² 954.87 45,218.51 43,177,798.64 0.204 - - -
5 Pek. Pengecatan Besi Hollow Kanopi m² 118.09 116,964.59 13,812,348.43 0.065 - - -
6 Pek. Pengecatan Chromate Baja m² 1,156.35 54,556.68 63,086,616.92 0.298 1,040.72 0.27 90.00
7 Pek. Pengecatan Dinding Partisi m² 112.10 52,270.67 5,859,542.11 0.028 - - -
175,913,119.69
B.II.1.7 PEKERJAAN SANITAIR 0.01 - -
1 Pek. Pemasangan Kaca Cermin tebal 5 mm m² 8.00 215,498.28 1,723,986.24 0.008 - - -
1,723,986.24
B.II.1.8 PEKERJAAN RANGKA ATAP KANOPI - -
1 Pekerjaan Kanopi Type 2 (Samping kanan) 0.33 - 0.05
-Pek. Pasang Rangka Atap Kanopi Baja WF 200.100.5,5.8 kg 236.80 37,857.30 8,964,608.64 0.042 94.72 0.02 40.00
-Pek. Pasang Rangka Atap Kanopi Besi Hollow 80x40x1,6 mm kg 25.62 34,828.97 892,318.21 0.004 - - -
-Pek. Pasang Rangka Atap Kanopi Besi Hollow 100x50x 3,2 mm kg 128.76 36,114.17 4,650,060.53 0.022 - - -
-Pek. Vute Baja WF 200.100.5,5.8 kg 24.66 37,857.30 933,561.02 0.004 9.86 0.00 40.00
-Pek. Mur Baut HTB M16 kg 36.00 61,568.58 2,216,468.88 0.010 14.40 0.00 40.00
-Pek. Pasang Atap Kanopi Kaca tempered 6 mm m² 10.42 543,205.26 5,660,198.81 0.027 - - -

2 Pekerjaan Kanopi Type 2 (Samping Kiri) Penghubung Gedung Utama dan Pendukung - -
-Pek. Pasang Rangka Atap Kanopi Baja WF 200.100.5,5.8 kg 341.12 37,857.30 12,913,882.18 0.061 136.45 0.02 40.00
-Pek. Pasang Rangka Atap Kanopi Besi Hollow 80x40x1,6 mm kg 80.34 34,828.97 2,798,159.45 0.013 - - -
-Pek. Pasang Rangka Atap Kanopi Besi Hollow 100x50x 3,2 mm kg 300.44 36,114.17 10,850,141.23 0.051 - - -
-Pek. Vute Baja WF 200.100.5,5.8 kg 24.66 37,857.30 933,561.02 0.004 9.86 0.00 40.00
-Pek. Mur Baut HTB M16 bh 36.00 61,568.58 2,216,468.88 0.010 14.40 0.00 40.00
-Pek. Pasang Atap Kanopi Kaca tempered 6 mm m² 31.57 543,205.26 17,148,990.06 0.081 - - -
70,178,418.90
B.II.1.9 PEKERJAAN ALLUMUNIUM COMPOSITE PANEL ( ACP )
1 Pekerjaan Kanopi Type 1 (Drop off) 3.40 - -
-Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PVDF Type Glossy Allumunium Thickness 0,3 m² 54.34 923,792.62 50,198,890.97 0.237 - - -
2 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PE Type Glossy Allumunium Thickness 0,21 m² 296.97 827,150.67 245,638,934.47 1.160 - - -
3 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PVDF Type Glossy Allumunium Thickness 0,3 m² 459.16 923,792.62 424,168,619.40 2.003 - - -
720,006,444.84
B.II.2 PEKERJAAN LANTAI 2 - -
B.II.2.1 PEKERJAAN PASANGAN 1.66 - -
1 Pek. Pasang Dinding Bata Ringan Tebal 10 cm m² 653.35 192,566.83 125,813,538.38 0.594 - - -
- Pek. Konektor Dinding Bata Ringan Besi Ø 8 - 1m kg 24.85 17,234.15 428,268.63 0.002 - - -
2 Pek. Pasang Badukan Bata Ringan Tebal 10 cm (Lantai Atap) m² 34.78 192,566.83 6,697,474.35 0.032 - - -
3 Pek. Plesteran Mortar Siap Pakai (MSP) m² 1,314.61 85,569.87 112,491,006.80 0.531 - - -
4 Pek. Acian Mortar Siap Pakai (MSP) m² 1,333.05 53,268.29 71,009,293.98 0.335 - - -
5 Pek. Plesteran Sekining m' 80.73 62,663.96 5,058,861.49 0.024 - - -
6 Pek. Beton Bertulang Kolom Praktis 11 x 11 cm m' 180.96 132,347.31 23,949,569.22 0.113 - - -
7 Pek. Beton Bertulang Balok Latei 10 x 15 cm m' 39.95 168,190.20 6,719,198.49 0.032 - - -
352,167,211.34
B.II.2.2 PEKERJAAN KUSEN,PINTU DAN JENDELA 2.05 - -
1 Pemasangan Pintu Kaca (PK2) unit 1.00 21,298,003.57 21,298,003.57 0.101 - - -
2 Pemasangan Pintu Kaca (PK5) unit 2.00 21,670,859.73 43,341,719.46 0.205 - - -
3 Pemasangan Pintu Kaca (PK6) unit 1.00 23,209,860.57 23,209,860.57 0.110 - - -
4 Pemasangan Pintu Kaca (PK8) unit 2.00 18,911,201.04 37,822,402.08 0.179 - - -
5 Pemasangan Pintu Kaca (PK9) unit 2.00 25,528,831.27 51,057,662.54 0.241 - - -
6 Pemasangan Pintu (P2) unit 1.00 5,618,760.40 5,618,760.40 0.027 - - -
7 Pemasangan Pintu (P1A) unit 5.00 6,201,696.08 31,008,480.40 0.146 - - -
8 Pemasangan Pintu (P3A) unit 4.00 5,978,190.80 23,912,763.20 0.113 - - -
9 Pemasangan Pintu (P4) unit 2.00 6,775,802.34 13,551,604.68 0.064 - - -
10 Pemasangan Jendela (J2) unit 2.00 9,593,597.39 19,187,194.78 0.091 - - -
11 Pemasangan Jendela (J11) unit 1.00 16,523,222.98 16,523,222.98 0.078 - - -
12 Pemasangan Jendela (J13) unit 4.00 18,344,638.61 73,378,554.44 0.347 - - -
13 Pemasangan Jendela (J14) unit 1.00 11,486,719.53 11,486,719.53 0.054 - - -
14 Pemasangan Jendela (J15) unit 1.00 11,486,719.53 11,486,719.53 0.054 - - -
15 Pemasangan Jendela (J16) unit 2.00 14,990,722.11 29,981,444.22 0.142 - - -
16 Pemasangan Jendela (J21) unit 4.00 4,555,194.67 18,220,778.68 0.086 - - -
17 Pemasangan Bovenlicht (BV) unit 5.00 664,654.76 3,323,273.80 0.016 - - -
434,409,164.86
B.II.2.3 PEKERJAAN PENUTUP LANTAI DAN DINDING 1.08 - -
1 Pek. Urugan Pasir Bawah Lantai m³ 44.76 458,036.45 20,501,711.50 0.097 - - -
2 Pek. Pasang Lantai Interior Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 403.23 328,795.83 132,580,342.53 0.626 - - -
3 Pek. Pasang Lantai KM Granite Tile Matt Valentino Mozart Dark Grey ukuran (60 x 60) cm m² 32.56 314,548.15 10,241,687.76 0.048 - - -
4 Pek. Pasang Dinding Granite Tile Valentino Gress Mozart Cemento ukuran (30 x 60) cm Toilet m² 160.67 362,919.70 58,310,308.20 0.275 - - -
5 Pek. Pasang Badukan Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 16.95 328,795.83 5,573,089.32 0.026 - - -
6 Pek. Pasang Meja Pantry Granite Tile Matt Ticino Black Valentino ukuran (60 x 60) cm m² 1.50 349,786.67 524,680.01 0.002 - - -
7 Pek. Pasang Dinding Granite Tile Valentino Gress Mozart Cemento ukuran (30 x 60) cm Pantry m² 1.12 362,919.70 406,470.06 0.002 - - -
228,138,289.38
B.II.2.4 PEKERJAAN PLAFON 0.48 - -
1 Pek. Pasang Rangka Plafon Hollow Gypsum Board m² 417.53 149,667.07 62,490,491.74 0.295 - - -
2 Pek. Pasang Penutup Plafon Gypsum Board tebal 9 mm m² 417.53 68,126.82 28,444,991.15 0.134 - - -
3 Pek. Pasang Rangka Plafon Hollow Kalsiboard Toilet m² 31.27 149,667.07 4,680,089.28 0.022 - - -
4 Pek. Pasang Penutup Plafon Kalsiboard tebal 4 mm Toilet m² 31.27 51,481.29 1,609,819.94 0.008 - - -
5 Pek. Pasang Shadowline (Tali Air) m' 308.67 15,566.28 4,804,843.65 0.023 - - -
102,030,235.76
B.II.2.5 PEKERJAAN PENGECATAN 2.04 - 0.13
1 Pek. Pengecatan Dinding Interior m² 736.90 52,270.67 38,518,256.72 0.182 - - -
2 Pek. Pengecatan Dinding Exterior m² 117.34 61,104.17 7,169,963.31 0.034 - - -
3 Pek. Pengecatan Plafon m² 448.80 45,218.51 20,294,067.29 0.096 - - -
4 Pek. Pengecatan Exterior Lantai Atap Tulisan " SATPAS " m² 37.97 61,104.17 2,320,125.33 0.011 - - -
5 Pek. Screed (MSP) tebal 20 mm m² 877.29 112,831.24 98,985,718.54 0.468 - - -
6 Pek. Waterprofing Sikatop 107 2x Lapis (Kamar Mandi) m² 44.10 61,410.26 2,708,192.47 0.013 - - -
7 pek. Waterprofing Sikalastic 590 4x lapis (Menggunakan membran fiberglass Sika 120 reemat) m² 877.29 264,394.12 231,950,317.53 1.096 - - -
8 Pek. Pengecatan Chromate Baja m² 564.95 54,556.68 30,821,796.37 0.146 508.46 0.13 90.00
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
432,768,437.56
B.II.2.6 PEKERJAAN SANITAIR 0.00 - -
1 Pek. Pemasangan Kaca Cermin tebal 5 mm m² 1.60 215,498.28 344,797.25 0.002 - - -
344,797.25
B.II.2.7 PEKERJAAN ALLUMUNIUM COMPOSITE PANEL ( ACP ) 2.81 - -
1 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PE Type Glossy Allumunium Thickness 0,21 m² 175.80 827,150.67 145,413,087.79 0.687 - - -
2 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PVDF Type Glossy Allumunium Thickness 0,3 m² 485.87 923,792.62 448,843,120.28 2.120 - - -
594,256,208.07
B.II.2.8 PEKERJAAN TULISAN DAN LOGO 0.36 - -
1 Pek. Pemasangan Logo Lalu Lintas Bahan Akrilik unit 1.00 20,291,203.30 20,291,203.30 0.096 - - -
2 Pek. Pemasangan Tulisan " SATUAN PENYELENGGARA ADMINISTRASI SIM " Font Arial Bahan Akrilik bh 34.00 736,433.65 25,038,744.10 0.118 - - -
3 Pek. Pemasangan Tulisan " SATPAS " Font Arial Bahan Akrilik Tinggi 50 cm bh 6.00 1,126,404.90 6,758,429.40 0.032 - - -
4 Pek. Pemasangan Tulisan " POLRES METRO BEKASI KOTA " Font Arial Bahan Akrilik Tinggi 50 cm bh 21.00 1,126,404.90 23,654,502.90 0.112 - - -
75,742,879.70
B.III PEKERJAAN MEEP - -
B.III.1 PEKERJAAN MECHANICAL VENTILATION AIR CONDITIONING DAN FIRE FIGHTING (MVAC) - -
B.III.1.1 PEKERJAAN INSATALASI TATA UDARA (MVAC) - -
B.III.1.1.1 LANTAI 1 - -
B.III.1.1.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN TATA UDARA (VRV SYSTEM BY LG) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 3.73 - -
- Indoor Unit-1, R. PENCETAKAN SIM (wall mounted type), 5500 BTU/H unit 1.00 12,281,891.66 12,281,891.66 0.058 - - -
WALL MOUNTED - ARNU05GSJN4, 1 PK - -
- Indoor Unit-2,3 , R. TUNGGU PENCETAKAN SIM (cassette type), 15400 BTU/H unit 2.00 17,595,859.23 35,191,718.46 0.166 - - -
CASSETTE - ARNU15GTQB4 + PT-QAGW0, 1 1/2 PK - -
- Indoor Unit-4, R.TUNGGU PENGUMUMAN (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-5, R. KONTROL E-DRIVE (cassette type), 12300 BTU/H unit 1.00 17,230,153.73 17,230,153.73 0.081 - - -
CASSETTE - ARNU12GTRB4 + PT-QAGW0,1 PK - -
- Indoor Unit-6,7 , R. TUNGGU UJI PRAKTEK (cassette type), 19100 BTU/H unit 2.00 18,676,581.75 37,353,163.50 0.176 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-8,9,10, TRANSIT (cassette type), 24200 BTU/H unit 3.00 20,482,504.27 61,447,512.81 0.290 - - -
CASSETTE - ARNU24GTBB4 + PT-QAGW0, 2 1/2 PK - -
- Indoor Unit-11,12, R. PENCERAHAN & UJI TEORI (cassette type), 24200 BTU/H unit 2.00 20,482,504.27 40,965,008.54 0.193 - - -
CASSETTE - ARNU24GTBB4 + PT-QAGW0, 2 1/2 PK - -
- Indoor Unit-13, R. PANEL (wall mounted type), 5500 BTU/H unit 1.00 12,281,891.66 12,281,891.66 0.058 - - -
WALL MOUNTED - ARNU05GSJN4, 1/2 PK - -
- Indoor Unit-14,15, SELASAR (cassette type), 20500 BTU/H unit 2.00 19,029,509.28 38,059,018.56 0.180 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-16,17, R. IDENTIFIKASI (cassette type), 19100 BTU/H unit 2.00 18,676,581.75 37,353,163.50 0.176 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-18,19, R. REGISTRASI (cassette type), 19100 BTU/H unit 2.00 18,676,581.75 37,353,163.50 0.176 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-20, R. SKUKP R2 & R4 (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-21, R. TUNGGU (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-22,23,24, COUNTER, R. TUNGGU, R. PENGADUAN, R BERMAIN (cassette type), 28000 BT unit 3.00 21,558,821.52 64,676,464.56 0.305 - - -
CASSETTE - ARNU28GTBB4 + PT-AAGW0,2 PK - -
- Indoor Unit-25, R. LAKTASI (wall mounted type), 5500 BTU/H unit 1.00 12,281,891.66 12,281,891.66 0.058 - - -
WALL MOUNTED - ARNU05GSJN4, 1/2 PK - -
- Indoor Unit-26, LOKET PEMBAYARAN (wall mounted type), 5500 BTU/H unit 1.00 12,281,891.66 12,281,891.66 0.058 - - -
WALL MOUNTED - ARNU05GSJN4, 1/2 PK - -
- Outdoor Unit lt.1 496800 BTU/H unit 1.00 312,947,359.14 312,947,359.14 1.478 - - -
Outdoor Multi-V 5 Pro - ARUV521LLS5, 55PK - -
788,792,820.78
B.III.1.1.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESSORIS INSTALASI AC VRV - -
(Meliputi material pendukung, ketebalan isolasi sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.56 - -
- ARBLN01621 - Refnet branch piping kit unit 12.00 1,577,050.24 18,924,602.88 0.089 - - -
- ARBLN03321 - Refnet branch piping kit unit 5.00 1,889,339.66 9,446,698.30 0.045 - - -
- ARBLN07121 - Refnet branch piping kit unit 6.00 2,778,294.62 16,669,767.72 0.079 - - -
- ARBLN14521 - Refnet branch piping kit unit 2.00 3,736,023.43 7,472,046.86 0.035 - - -
- Outdoor Pipe Connection - ARCNN21 unit 1.00 3,081,089.56 3,081,089.56 0.015 - - -
- Standard III Wired Remocon - PREMTB100 unit 22.00 2,601,799.47 57,239,588.34 0.270 - - -
- Wireless Remocon - PWLSSB21C unit 4.00 1,575,237.73 6,300,950.92 0.030 - - -
119,134,744.58
B.III.1.1.1.3 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA REFRIGERANT - -
(Meliputi material pendukung, komplit dgn isolasi dgn ketebalan isolasi 19 mm sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pendukung terkait berjalannya 0.62 - -
- Ref Pipe 'Liquit 'dia. 1/4" (6,35 mm) m' 60.00 110,251.86 6,615,111.60 0.031 - - -
Gas 'dia. 1/2" (12,70 mm) m' 60.00 205,965.92 12,357,955.20 0.058 - - -
- Ref Pipe 'Liquit 'dia. 3/8" (9,52 mm) m' 64.00 159,660.67 10,218,282.88 0.048 - - -
Gas 'dia. 5/8" (15,88 mm) m' 64.00 267,034.65 17,090,217.60 0.081 - - -
- Ref Pipe 'Liquit 'dia. 3/8" (9,52 mm) m' 9.50 159,660.67 1,516,776.37 0.007 - - -
Gas 'dia. 3/4" ( 19,05 mm) m' 9.50 326,373.49 3,100,548.16 0.015 - - -
- Ref Pipe 'Liquit 'dia. 3/8" ( 9,52 mm ) m' 11.50 159,660.67 1,836,097.71 0.009 - - -
Gas 'dia.7/8" (22,2 mm ) m' 11.50 501,164.88 5,763,396.09 0.027 - - -
- Ref Pipe 'Liquit 'dia. 1/2" (12,7 mm) m' 9.00 205,965.92 1,853,693.28 0.009 - - -
Gas 'dia. 1-1/8" (28,58 mm) m' 9.00 856,813.12 7,711,318.08 0.036 - - -
- Ref Pipe 'Liquit 'dia. 5/8" (15,88 mm) m' 8.00 267,034.65 2,136,277.20 0.010 - - -
Gas 'dia. 1-1/8" (28,58 mm) m' 8.00 856,813.12 6,854,504.96 0.032 - - -
- Ref Pipe 'Liquit 'dia. 5/8" (15,88 mm) m' 1.00 267,034.65 267,034.65 0.001 - - -
Gas 'dia. 1-3/8"(34,9 mm) m' 1.00 1,080,348.17 1,080,348.17 0.005 - - -
- Ref Pipe 'Liquit 'dia. 3/4" ( 19,05 mm) m' 1.50 326,373.49 489,560.24 0.002 - - -
Gas 'dia. 1-3/8"(34,9 mm) m' 1.50 1,080,348.17 1,620,522.26 0.008 - - -
- Ref Pipe 'Liquit 'dia. 3/4" ( 19,05 mm) m' 26.00 326,373.49 8,485,710.74 0.040 - - -
Gas 'dia.1-5/8" (41,3 mm) m' 26.00 1,446,857.12 37,618,285.12 0.178 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 1/4"+1/2", Jarak 2 m Titik 30.00 48,586.75 1,457,602.50 0.007 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+5/8", Jarak 2 m Titik 32.00 48,586.75 1,554,776.00 0.007 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+3/4", Jarak 2 m Titik 5.00 48,586.75 242,933.75 0.001 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+7/8", Jarak 2m Titik 6.00 48,586.75 291,520.50 0.001 - - -
- Penggantung Pipa 'dia. 3" (80 mm), Untuk Ref Pipe Dia 1/2"+1-1/8", Jarak 2 m Titik 5.00 59,849.01 299,245.05 0.001 - - -
- Penggantung Pipa 'dia. 3" (80 mm), Untuk Ref Pipe Dia 5/8"+1-1/8", Jarak 2 m Titik 4.00 59,849.01 239,396.04 0.001 - - -
- Penggantung Pipa 'dia. 4" (100 mm), Untuk Ref Pipe Dia 3/4"+1-3/8", Jarak 2 m Titik 1.00 62,322.33 62,322.33 0.000 - - -
- Penggantung Pipa 'dia. 4" (100 mm), Untuk Ref Pipe Dia 3/4"+1-5/8", Jarak 2 m Titik 1.00 62,322.33 62,322.33 0.000 - - -
130,825,758.78
B.III.1.1.1.4 PEKERJAAN PENGADAAN DAN PEMASANGAN REFRIGERANT GAS 0.03 - -
- Refrigerant Gas R410A kg 22.23 289,324.52 6,431,684.08 0.030 - - -
6,431,684.08
B.III.1.1.1.5 PEKERJAAN PENGADAAN DAN PEMASANGAN KONTROL UNIT INDOOR AC 0.08 - -
- Kabel 2x AWG 18 mm2 + HIC 20 mm (indoor unit to Outdoor Unit) m' 217.00 39,110.67 8,487,015.39 0.040 - - -
- Kabel 2x AWG 18 mm2 + HIC 20 mm (indoor unit to thermostat) m' 203.00 39,110.67 7,939,466.01 0.037 - - -
16,426,481.40
B.III.1.1.1.6 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA DRAIN UNIT AC - -
(Material pipa PVC Class AW, Meliputi material pendukung, Komplit dengan isolasi tebal 10 mm, dan alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.13 - -
- Pipa Drain dia 25 mm (1 ") m' 21.00 80,976.52 1,700,506.92 0.008 - - -
- Pipa Drain dia 32 mm (1 1/4 ") m' 78.00 105,014.98 8,191,168.44 0.039 - - -
- Pipa Drain dia 50 mm (2 ") m' 93.00 160,254.28 14,903,648.04 0.070 - - -
- Penggantung Pipa dia. 1-1/2" (40 mm), Untuk Pipa Drain Dia 1", Jarak 2 m Titik 22.00 43,644.07 960,169.54 0.005 - - -
- Penggantung Pipa dia. 2" (50 mm), Untuk Pipa Drain Dia 1-1/4", Jarak 2 m Titik 36.00 46,114.92 1,660,137.12 0.008 - - -
27,415,630.06
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
B.III.1.1.1.7 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM VENTILASI UDARA 0.11 - -
- Pipa PVC class "D" dia 100 mm (4') Exhaust Fan ke Louver Grille m 44.00 136,037.30 5,985,641.20 0.028 - - -
- Exhaust Fan unit Cap 75 CFM Ukuran 12" unit 11.00 1,578,914.53 17,368,059.83 0.082 - - -
- Exhaust Air Louver Grille uk 150 x 150 mm no 2.00 279,508.62 559,017.24 0.003 - - -
23,912,718.27
B.III.1.1.2 LANTAI 2 - -
B.III.1.1.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN TATA UDARA (VRV SYSTEM BY LG) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 2.33 - -
- Indoor Unit-1,2, R. ARSIP (cassette type), 28000 BTU/H unit 2.00 21,558,821.52 43,117,643.04 0.204 - - -
CASSETTE - ARNU28GTBB4 + PT-AAGW0,2 PK - -
- Indoor Unit-3, MUSHOLAH (cassette type), 19100 BTU/H unit 1.00 18,676,581.75 18,676,581.75 0.088 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-4, GUDANG (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-5, R. TUNGGU VIP (cassette type), 12300 BTU/H unit 1.00 17,230,153.73 17,230,153.73 0.081 - - -
CASSETTE - ARNU12GTQB4 + PT-QAGW0, 1 1/2 PK - -
- Indoor Unit-6,7, R. RAPAT (cassette type), 19100 BTU/H unit 2.00 18,676,581.75 37,353,163.50 0.176 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-8, R. STAFF (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-9, R. BAUR SIM (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-10,11,12, KORIDOR (cassette type), 19100 BTU/H unit 3.00 18,676,581.75 56,029,745.25 0.265 - - -
CASSETTE - ARNU18GTQB4 + PT-QAGW0, 2 PK - -
- Indoor Unit-13, R. KRI (cassette type), 20500 BTU/H unit 1.00 19,029,509.28 19,029,509.28 0.090 - - -
CASSETTE - ARNU21GTQB4 + PT-QAGW0,2 PK - -
- Indoor Unit-14, R. SERVER/IT (wall mounted type), 12300 BTU/H unit 1.00 13,365,466.94 13,365,466.94 0.063 - - -
WALL MOUNTED - ARNU12GSJN4, 1 1/2 PK - -
- Indoor Unit-15, R. SERVER/IT (single split system, wall mounted type), 13500 BTU/H unit 1.00 7,424,145.08 7,424,145.08 0.035 - - -
WALL MOUNTED SINGLE SPLIT SYSTEM, 1 1/2 PK - -
- Outdoor Unit 2 lt.atap, 286600 BTU/H unit 1.00 224,353,582.97 224,353,582.97 1.060 - - -
Outdoor Multi-V 5 Pro - ARUV301ILLS5, 35 PK - -
493,668,519.38
B.III.1.1.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESSORIS INSTALASI AC VRV - -
(Meliputi material pendukung, ketebalan isolasi sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.50 - -
- ARBLN01621 - Refnet branch piping kit unit 4.00 1,577,050.24 6,308,200.96 0.030 - - -
- ARBLN03321 - Refnet branch piping kit unit 6.00 1,889,339.66 11,336,037.96 0.054 - - -
- ARBLN07121 - Refnet branch piping kit unit 3.00 2,778,294.62 8,334,883.86 0.039 - - -
- Outdoor Pipe Connection - ARCNN21 unit 1.00 3,081,089.56 3,081,089.56 0.015 - - -
- Standard III Wired Remocon - PREMTB100 unit 13.00 2,601,799.47 33,823,393.11 0.160 - - -
- Wireless Remocon - PWLSSB21C unit 1.00 1,575,237.73 1,575,237.73 0.007 - - -
- AC SMART 5 unit 1.00 42,044,455.90 42,044,455.90 0.199 - - -
106,503,299.08
B.III.1.1.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA REFRIGERANT - -
(Meliputi material pendukung, komplit dgn isolasi dgn ketebalan isolasi 19 mm sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pendukung terkait berjalannya 0.36 - -
- Ref Pipe 'Liquit 'dia. 1/4" (6,35 mm) m' 38.00 110,251.86 4,189,570.68 0.020 - - -
Gas'dia. 1/2" (12,70 mm) m' 38.00 205,965.92 7,826,704.96 0.037 - - -
- Ref Pipe 'Liquit 'dia. 3/8" (9,52 mm) m' 47.50 159,660.67 7,583,881.83 0.036 - - -
Gas dia. 5/8" (15,88 mm) m' 47.50 267,034.65 12,684,145.88 0.060 - - -
- Ref Pipe 'Liquit 'dia. 3/8" (9,52 mm) m' 6.50 159,660.67 1,037,794.36 0.005 - - -
Gas 'dia. 3/4" ( 19,05 mm) m' 6.50 326,373.49 2,121,427.69 0.010 - - -
- Ref Pipe 'Liquit 'dia. 3/8" (9,52 mm) m' 8.00 159,660.67 1,277,285.36 0.006 - - -
Gas 'dia.7/8" (22,2 mm ) m' 8.00 501,164.88 4,009,319.02 0.019 - - -
- Ref Pipe 'Liquit 'dia. 1/2" (12,7 mm) m' 5.00 205,965.92 1,029,829.60 0.005 - - -
Gas 'dia. 1-1/8" (28,58 mm) m' 5.00 856,813.12 4,284,065.60 0.020 - - -
- Ref Pipe 'Liquit 'dia. 5/8" (15,88 mm) m' 2.50 267,034.65 667,586.63 0.003 - - -
Gas 'dia. 1-1/8" (28,58 mm) m' 2.50 856,813.12 2,142,032.80 0.010 - - -
- Ref Pipe 'Liquit 'dia. 3/4" ( 19,05 mm) m' 17.00 326,373.49 5,548,349.33 0.026 - - -
Gas 'dia. 1-3/8"(34,9 mm) m' 17.00 1,080,348.17 18,365,918.89 0.087 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 1/4"+1/2", Jarak 2 m Titik 19.00 48,586.75 923,148.25 0.004 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+5/8", Jarak 2 m Titik 24.00 48,586.75 1,166,082.00 0.006 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+3/4", Jarak 2 m Titik 3.00 48,586.75 145,760.25 0.001 - - -
- Penggantung Pipa 'dia. 2-1/2" (65 mm), Untuk Ref Pipe Dia 3/8"+7/8", Jarak 2m Titik 4.00 48,586.75 194,347.00 0.001 - - -
- Penggantung Pipa 'dia. 3" (80 mm), Untuk Ref Pipe Dia 1/2"+1-1/8", Jarak 2 m Titik 3.00 59,849.01 179,547.03 0.001 - - -
- Penggantung Pipa 'dia. 3" (80 mm), Untuk Ref Pipe Dia 5/8"+1-1/8", Jarak 2 m Titik 2.00 59,849.01 119,698.02 0.001 - - -
- Penggantung Pipa 'dia. 4" (100 mm), Untuk Ref Pipe Dia 3/4"+1-3/8", Jarak 2 m Titik 8.00 62,322.33 498,578.64 0.002 - - -
75,995,073.79
B.III.1.1.2.4 PEKERJAAN PENGADAAN DAN PEMASANGAN REFRIGERANT GAS 0.02 - -
- Refrigerant Gas R410A kg 13.58 289,324.52 3,929,026.98 0.019 - - -
- Refrigerant Gas R32 kg 3.64 189,732.59 690,626.63 0.003 - - -
4,619,653.61
B.III.1.1.2.5 PEKERJAAN PENGADAAN DAN PEMASANGAN KONTROL UNIT INDOOR AC 0.04 - -
- Kabel 2x AWG 18 mm2 + HIC 20 mm (indoor unit to Outdoor Unit) m' 160.00 39,110.67 6,257,707.20 0.030 - - -
- Kabel 2x AWG 18 mm2 + HIC 20 mm (indoor unit to thermostat) m' 66.00 39,110.67 2,581,304.22 0.012 - - -
8,839,011.42
B.III.1.1.2.6 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA DRAIN UNIT AC - -
(Material pipa PVC Class AW, Meliputi material pendukung, komplit dengan isolasi dgn ketebalan isolasi sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pen 0.08 - -
- Pipa Drain dia 25 mm (1 ") m' 18.00 80,976.52 1,457,577.36 0.007 - - -
- Pipa Drain dia 40 mm (1 1/2 ") m' 18.00 120,692.24 2,172,460.32 0.010 - - -
- Pipa Drain dia 32 mm (1 1/4 ") m' 66.00 105,014.98 6,930,988.68 0.033 - - -
- Pipa Drain dia 50 mm (2 ") m' 33.00 160,254.28 5,288,391.24 0.025 - - -
- Penggantung Pipa dia. 2" (50 mm), Untuk Pipa Drain Dia 1-1/4", Jarak 2 m Titik 4.00 46,114.92 184,459.68 0.001 - - -
- Penggantung Pipa dia. 2" (50 mm), Untuk Ref Pipe Dia 2", Jarak 2m Titik 25.00 46,114.92 1,152,873.00 0.005 - - -
17,186,750.28

B.III.1.1.2.7 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM VENTILASI UDARA - -


(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, swicth looping saklar) 0.05 - -
- Pipa PVC class "D" dia 100 mm (4') Exhaust Fan ke Louver Grille m 15.00 136,037.30 2,040,559.50 0.010 - - -
- Ceilling Exhaust Fan unit Cap 75 CFM Ukuran 12" unit 5.00 1,578,914.53 7,894,572.65 0.037 - - -
- Exhaust Air Louver Grille uk 150 x 150 mm no 2.00 279,508.62 559,017.24 0.003 - - -
10,494,149.39
B.III.1.2 PEKERJAAN ELEKTRIKAL - -
B.III.1.2.1 LANTAI 1 - -
B.III.1.2.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PANEL - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.16 - -
- PP - LT.1 unit 1.00 21,110,279.16 21,110,279.16 0.100 - - -
- PP. E-DRIVE unit 1.00 12,402,727.03 12,402,727.03 0.059 - - -
33,513,006.19
B.III.1.2.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN KEBEL FEEDER - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.10 - -
- Dari Panel Utama (MDP) ke PP - LT.1, kabel NYY 4x16 +NYA 10 mm2 m 57.00 257,367.49 14,669,946.93 0.069 - - -
- Dari Panel Utama (MDP) ke PP.E-DRIVE, kabel NYY 3x6 +NYA 4 mm2 m 54.00 105,595.00 5,702,130.00 0.027 - - -
20,372,076.93
B.III.1.2.1.3 PEKERJAAN PENGADAAN DAN PEMASANGAN KABEL TRAY / KABEL LADDER - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.28 - -
- Kabel Tray Elektrikal uk 200x100 (HORIZONTAL) m 64.00 336,347.67 21,526,250.88 0.102 - - -
- Kabel Tray Elektrikal uk 200x100 (VERTIKAL) m 8.00 336,375.46 2,691,003.68 0.013 - - -
- Kabel Tray Elektronik uk 200x100 (HORIZONTAL) m 64.00 336,347.67 21,526,250.88 0.102 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Kabel Tray Elektronik uk 200x100 (VERTIKAL) m 10.00 336,375.46 3,363,754.60 0.016 - - -
- Penggantung Kabel Tray 200x100 Titik 121.00 62,191.11 7,525,124.31 0.036 - - -
- Tutup Kabel Tray 200x50X3000X1.2mm m 9.00 275,819.71 2,482,377.39 0.012 - - -
59,114,761.74
B.III.1.2.1.4 PEKERJAAN PENGADAAN DAN PEMASANGAN PENERANGAN DAN STOPKONTAK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 1.24 - -
- Lampu TL RMI 2 x 18 Watt bh 25.00 935,205.77 23,380,144.25 0.110 - - -
- Lampu TL RMI 2 x 18 Watt + Battery Emergency bh 9.00 1,411,415.12 12,702,736.08 0.060 - - -
- Lampu Downlight LED 5 watt bh 12.00 138,829.53 1,665,954.36 0.008 - - -
- Lampu Downlight LED 9 watt bh 9.00 166,019.88 1,494,178.92 0.007 - - -
- Lampu Downlight LED 13 watt bh 19.00 189,324.13 3,597,158.47 0.017 - - -
- Lampu Downlight LED 13 watt Outbow bh 2.00 251,949.46 503,898.92 0.002 - - -
- Lampu Downlight LED 17 watt bh 26.00 219,488.78 5,706,708.28 0.027 - - -
- Lampu Sorot LED 50 watt bh 4.00 1,223,324.12 4,893,296.48 0.023 - - -
- Saklar Tunggal / Engkel bh 9.00 44,239.12 398,152.08 0.002 - - -
- Saklar Ganda / Seri bh 15.00 63,971.02 959,565.30 0.005 - - -
- Saklar Tukar Single / Engkel bh 1.00 48,516.42 48,516.42 0.000 - - -
- Instalasi Penerangan dengan Kabel 3 x 1,5 mm2 + HIC 20 mm point 106.00 534,398.69 56,646,261.14 0.268 - - -
- Instalasi Saklar Penerangan dengan Kabel 3 x 1,5 mm2 + HIC 20 mm point 25.00 279,323.52 6,983,088.00 0.033 - - -
- Stop Kontak Dinding no 24.00 47,655.11 1,143,722.64 0.005 - - -
- Stop Kontak Lantai (Tanpa Data Outlet) no 12.00 1,098,708.07 13,184,496.84 0.062 - - -
- Stop Kontak Lantai (Kombinasi Stop Kontak + Data Outlet) no 31.00 1,252,575.90 38,829,852.90 0.183 - - -
- Stop Kontak untuk Acces Point + Wifi no 4.00 40,178.69 160,714.76 0.001 - - -
- Instalasi Stop Kontak dengan Kabel 3 x 2,5 mm2 + HIC 20 mm point 71.00 749,178.73 53,191,689.83 0.251 - - -
- Instalasi Power Indoor AC dengan Kabel 3 x 2,5 mm2 + HIC 20 mm m 572.00 60,574.86 34,648,819.92 0.164 - - -
- Instalasi Power Exhaust Fan dengan Kabel 3 x 2,5 mm2 + HIC 20 mm m 26.00 60,574.86 1,574,946.36 0.007 - - -
261,713,901.95
B.III.1.2.2 LANTAI 2 - -
B.III.1.2.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PANEL - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.23 - -
- PP - LT.2 unit 1.00 16,914,965.26 16,914,965.26 0.080 - - -
- PP-OU AC unit 1.00 20,244,508.85 20,244,508.85 0.096 - - -
- PP- FIFO unit 1.00 12,398,837.17 12,398,837.17 0.059 - - -
49,558,311.28
B.III.1.2.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN KEBEL FEEDER - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.67 - -
- Dari Panel Utama (MDP) ke PP - LT.2, kabel NYY 4x10 +NYA 6 mm2 m 80.00 183,863.85 14,709,108.00 0.069 - - -
- Dari MDP ke PP-FIFO, kabel NYY 3x6 +NYA 4 mm2 m 78.00 105,595.00 8,236,410.00 0.039 - - -
- Dari MDP ke PP-OU AC, kabel NYY 4x95 +NYA 50 mm2 m 81.00 1,319,629.01 106,889,949.81 0.505 - - -
- Dari PP-OU AC ke OU.AC LT-1, kabel NYY 4x50 +NYA 25 mm2 m 13.00 662,607.88 8,613,902.44 0.041 - - -
- Dari PP-OU AC ke OU.AC LT-2, kabel NYY 4x25 +NYA 16 mm2 m 9.00 390,011.01 3,510,099.09 0.017 - - -
141,959,469.34
B.III.1.2.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN KABEL TRAY / KABEL LADDER - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.16 - -
- Kabel Tray Elektrikal uk 200x100 (HORIZONTAL) m 30.00 336,347.67 10,090,430.10 0.048 - - -
- Kabel Tray Elektrikal uk 200x100 (VERTIKAL) m 11.00 336,375.46 3,700,130.06 0.017 - - -
- Kabel Tray Elektronik uk 200x100 (HORIZONTAL) m 29.00 336,347.67 9,754,082.43 0.046 - - -
- Kabel Tray Elektronik uk 200x100 (VERTIKAL) m 11.00 336,375.46 3,700,130.06 0.017 - - -
- Penggantung Kabel Tray 200x100 Titik 23.00 62,191.11 1,430,395.53 0.007 - - -
- Cable Ladder 200x100 m 7.00 307,269.52 2,150,886.64 0.010 - - -
- Tutup Kabel Tray 200x50 m 14.00 275,819.71 3,861,475.94 0.018 - - -
34,687,530.76
B.III.1.2.2.4 PEKERJAAN PENGADAAN DAN PEMASANGAN PENERANGAN DAN STOPKONTAK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.58 - -
- Lampu TL RMI 2 x 18 Watt bh 17.00 935,205.77 15,898,498.09 0.075 - - -
- Lampu TL RMI 2 x 18 Watt + Battery Emergency bh 5.00 1,411,415.12 7,057,075.60 0.033 - - -
- Lampu Downlight LED 5 watt bh 6.00 138,829.53 832,977.18 0.004 - - -
- Lampu Downlight LED 9 watt bh 7.00 166,019.88 1,162,139.16 0.005 - - -
- Lampu Downlight LED 13 watt bh 3.00 189,324.13 567,972.39 0.003 - - -
- Lampu Downlight LED 13 watt + Battery Emergency bh 1.00 665,533.48 665,533.48 0.003 - - -
- Lampu Downlight LED 17 watt bh 8.00 219,488.78 1,755,910.24 0.008 - - -
- Saklar Tunggal / Engkel bh 11.00 44,239.12 486,630.32 0.002 - - -
- Saklar Ganda / Seri bh 5.00 63,971.02 319,855.10 0.002 - - -
- Saklar Tukar Single / Engkel bh 1.00 48,516.42 48,516.42 0.000 - - -
- Instalasi Penerangan dengan Kabel NYM 3 x 1,5 mm2 + HIC 20 mm bh 47.00 534,398.69 25,116,738.43 0.119 - - -
- Instalasi Saklar Penerangan dengan Kabel NYM 3 x 1,5 mm2 + HIC 20 mm bh 17.00 279,323.52 4,748,499.84 0.022 - - -
- Stop Kontak Dinding bh 14.00 47,655.11 667,171.54 0.003 - - -
- Stop Kontak Lantai (Kombinasi Stop Kontak + Data Outlet) bh 15.00 1,252,575.90 18,788,638.50 0.089 - - -
- Stop Kontak untuk Acces Point + Wifi bh 2.00 40,178.69 80,357.38 0.000 - - -
- Instalasi Stop Kontak dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm bh 31.00 749,178.73 23,224,540.63 0.110 - - -
- Instalasi Power Indoor AC dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm bh 342.00 60,574.86 20,716,602.12 0.098 - - -
- Instalasi Power Exhaust Fan dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm bh 14.00 60,574.86 848,048.04 0.004 - - -
122,985,704.46
B.III.1.2.3 AREA EKSTERNAL - -
B.III.1.2.3.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI GROUNDING PERALATAN ELEKTRIKAL DAN ELEKTRONIK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.05 - -
- Tancapan Grounding Elektronik (Pentanahan dgn Kabel BC 6 mm2 sampai mendapatkan nilai resistansi ls 1.00 9,478,304.79 9,478,304.79 0.045 - - -
- Kabel Grounding Elektronik NYA 6 mm2 + HIC 20 mm (dari Bak Kontrol ke Peralatan Utama Elektronik) m 46.00 34,345.40 1,579,888.40 0.007 - - -
11,058,193.19

B.III.1.2.3.2 PEKERJAAN PENGADAAN DAN PEMASANGAN PENANGKAL PETIR 0.37 - -


- Tancapan Grounding Penangkal Petir (Pentanahan dgn Kabel BC 70 mm2 sampai mendapatkan nilai resi ls 1.00 13,853,953.86 13,853,953.86 0.065 - - -
- LSR-1 (Lighning Strike Recorder) unit 1.00 10,434,581.29 10,434,581.29 0.049 - - -
- Kabel Konduktor NYA 1x70 sqmm (Dari LSR-1 ke Lighting Head Terminal di Roof) m 42.00 199,551.53 8,381,164.26 0.040 - - -
- Cable Duct 100x100 mm (Dari LSR-1 ke Lighting Head Terminal di Roof) m 37.00 149,874.06 5,545,340.22 0.026 - - -
- Kabel Power NYM 3 x 2,5 mm2 + HIC 20 mm (dari PP. LT-2 ke Lighting Head Terminal di Roof) m 29.00 60,574.86 1,756,670.94 0.008 - - -
- Cable Duct 100x100 mm ( Dari PP. LT.2 ke lighting head terminal) m 11.00 149,874.06 1,648,614.66 0.008 - - -
- Lightning Head terminal (LPI - Stormmaster ESE-60 Level Standart Radius 110 m, H=10 meter dari Dek A unit 1.00 35,659,833.58 35,659,833.58 0.168 - - -
77,280,158.81
B.III.1.3 PEKERJAAN ELEKTRONIK - -
B.III.1.3 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM DATA - -
B.III.1.3.1 LANTAI 1 - -
B.III.1.3.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM DATA - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.17 - -
- SDF.DT - LT.1 (Switch-Hub 24 port + Switch Hub 24 Port + Switch Hub 8 Port ) unit 1.00 4,859,835.31 4,859,835.31 0.023 - - -
- Kabel Feeder dari SDF.DT - LT.1 ke MDF-DT dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 23.00 31,862.64 732,840.72 0.003 - - -
- Kabel Data dari ISP ke MDF-DT dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 135.00 31,862.64 4,301,456.40 0.020 - - -
- Outlet Data (kombinasi + Power Outlet) Include stop Kontak lantai - -
- Instalasi Data dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 698.00 31,862.64 22,240,122.72 0.105 - - -
- Access Point + Wifi m 4.00 485,443.89 1,941,775.56 0.009 - - -
- Wall Mount Rak Server Uk. 4U m 1.00 2,160,781.83 2,160,781.83 0.010 - - -
36,236,812.54
B.III.1.3.2 LANTAI 2 - -
B.III.1.3.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA DATA (DI RUANG PANEL LANTAI 2) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.08 - -
- PC Server c/w Monitor 17" (komplit dengan UPS) unit 1.00 7,779,583.76 7,779,583.76 0.037 - - -
- MDF.DT (Router 4/1) unit 1.00 1,496,017.86 1,496,017.86 0.007 - - -
- Biaya Penyambungan ke Internet Service Provider ls 1.00 7,799,536.50 7,799,536.50 0.037 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
17,075,138.12
B.III.1.3.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM DATA - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.07 - -
- SDF.DT - LT.2 (Switch-Hub 24 port) unit 1.00 2,046,065.01 2,046,065.01 0.010 - - -
- Kabel Feeder dari SDF.DT - LT.2 ke MDF-DT dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 7.00 31,862.64 223,038.48 0.001 - - -
- Outlet Data (kombinasi + Power Outlet) Include stop Kontak lantai - -
- Instalasi Data dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 283.00 31,862.64 9,017,127.12 0.043 - - -
- Access Point + Wifi unit 2.00 485,443.89 970,887.78 0.005 - - -
- Wall Mount Rak Server Uk. 4U unit 1.00 2,160,781.83 2,160,781.83 0.010 - - -
14,417,900.22
B.III.1.4 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM CCTV - -
B.III.1.4.1 LANTAI 1 - -
B.III.1.4.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT CCTV - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.23 - -
- CCTV Indoor Dome Camera (Zoom) 4MP unit 12.00 1,632,150.91 19,585,810.92 0.093 - - -
- CCTV Outdoor Bullet Camera (Zoom) 5MP unit 6.00 2,258,583.53 13,551,501.18 0.064 - - -
- Instalasi CCTV dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 471.00 31,862.64 15,007,303.44 0.071 - - -
48,144,615.54
B.III.1.4.2 LANTAI 2 - -
B.III.1.4.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATANN UTAMA (DI RUANG PERALATAN UTAMA LANTAI 2) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.11 - -
- NVR 32 CH (Hardick 1 TB) unit 1.00 9,646,111.77 9,646,111.77 0.046 - - -
- PC incl digital disk recorder unit 1.00 4,269,263.42 4,269,263.42 0.020 - - -
- LED TV 43" unit 1.00 3,575,996.67 3,575,996.67 0.017 - - -
- UPS unit 1.00 5,386,184.63 5,386,184.63 0.025 - - -
- Meja Server unit 1.00 753,697.27 753,697.27 0.004 - - -
23,631,253.76
B.III.1.4.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT CCTV - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.07 - -
- CCTV Indoor Dome Camera (Zoom) 4MP unit 5.00 1,632,150.91 8,160,754.55 0.039 - - -
- CCTV Outdoor Bullet Camera (Zoom) 5MP unit 1.00 2,258,583.53 2,258,583.53 0.011 - - -
- Instalasi CCTV dengan kabel UTP Cat 6 mm2 + HIC 20 mm m 131.00 31,862.64 4,174,005.84 0.020 - - -
14,593,343.92
B.III.1.5 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM FIRE ALARM - -
B.III.1.5.1 LANTAI 1 - -
B.III.1.5.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT FIRE ALARM - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.20 - -
- TB.FA-LT1 unit 1.00 1,545,673.04 1,545,673.04 0.007 - - -
- Smoke Detector unit 17.00 576,985.15 9,808,747.55 0.046 - - -
- Alarm Bell unit 2.00 555,243.82 1,110,487.64 0.005 - - -
- Alarm Lamp unit 2.00 171,022.65 342,045.30 0.002 - - -
- Manual Call Point unit 2.00 472,201.01 944,402.02 0.004 - - -
- Instalasi Detector Alarm dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 17.00 1,038,585.08 17,655,946.36 0.083 - - -
- Instalasi Alarm Bell dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 2.00 1,841,993.62 3,683,987.24 0.017 - - -
- Instalasi Alarm Lamp dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 2.00 1,841,993.62 3,683,987.24 0.017 - - -
- Instalasi Manual Call Point dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 2.00 1,841,993.62 3,683,987.24 0.017 - - -
42,459,263.63
B.III.1.5.2 LANTAI 2 - -
B.III.1.5.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA (DI RUANG PERALATAN UTAMA LANTAI 2) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.06 - -
- MCFA 5 Zone Include With Back Up Battery unit 1.00 12,756,939.11 12,756,939.11 0.060 - - -
12,756,939.11
B.III.1.5.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT FIRE ALARM - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.14 - -
- TB.FA-LT2 unit 1.00 1,545,883.97 1,545,883.97 0.007 - - -
- Smoke Detector unit 12.00 576,985.15 6,923,821.80 0.033 - - -
- Heat Detector unit 1.00 260,057.12 260,057.12 0.001 - - -
- Alarm Bell unit 1.00 555,243.82 555,243.82 0.003 - - -
- Alarm Lamp unit 1.00 171,022.65 171,022.65 0.001 - - -
- Manual Call Point unit 1.00 472,201.01 472,201.01 0.002 - - -
- Instalasi Detector Alarm dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 13.00 1,038,585.08 13,501,606.04 0.064 - - -
- Instalasi Alarm Bell dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 1.00 1,841,993.62 1,841,993.62 0.009 - - -
- Instalasi Alarm Lamp dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 1.00 1,841,993.62 1,841,993.62 0.009 - - -
- Instalasi Manual Call Point dengan Kabel FRC 2x1,5 mm2 + HIC 20 mm Point 1.00 1,841,993.62 1,841,993.62 0.009 - - -
28,955,817.27
B.III.1.6 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AUDIO - -
B.III.1.6.1 LANTAI 1 - -
B.III.1.6.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT SOUND SISTEM - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.09 - -
- TB.SS-LT1 unit 1.00 940,458.96 940,458.96 0.004 - - -
- Ceilling Speaker 3 Watt unit 16.00 301,146.51 4,818,344.16 0.023 - - -
- Wall Speaker 6 Watt unit 4.00 504,296.87 2,017,187.48 0.010 - - -
- Instalasi Sound Sistem dengan Kabel CANARE 14 AWG m 21.00 56,688.21 1,190,452.41 0.006 - - -
- Instalasi Sound Sistem dengan Kabel NYMHY 2x2,5 mm2 + HIC 20 mm Point 20.00 510,834.14 10,216,682.80 0.048 - - -
- Instalasi Sound Sistem dari TB-SS LT1 ke RACK.SS dengan Kabel NYMHY 2x2,5 mm2 + HIC 20 mm m 7.00 52,289.22 366,024.54 0.002 - - -
19,549,150.35
B.III.1.6.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA (DI RUANG PERALATAN UTAMA LANTAI 2) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.27 - -
- Rack Sound Sistem (incl. Perangkat dan acc) unit 1.00 49,188,950.05 49,188,950.05 0.232 - - -
- Mic Car Call unit 1.00 2,493,755.68 2,493,755.68 0.012 - - -
- UPS unit 1.00 5,386,184.63 5,386,184.63 0.025 - - -
57,068,890.36
B.III.1.6.2 LANTAI 2 - -
B.III.1.6.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PERANGKAT SOUND SISTEM - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.02 - -
- TB.SS-LT2 unit 1.00 940,722.38 940,722.38 0.004 - - -
- Ceilling Speaker 3 Watt unit 9.00 301,146.51 2,710,318.59 0.013 - - -
- Instalasi Sound Sistem dengan Kabel NYMHY 2x2,5 mm2 + HIC 20 mm Point 1.00 510,834.14 510,834.14 0.002 - - -
- Instalasi Sound Sistem dari TB-SS LT1 ke RACK.SS dengan Kabel NYMHY 2x2,5 mm2 + HIC 20 mm m 19.00 52,289.22 993,495.18 0.005 - - -
5,155,370.29
B.III.2 PEKERJAAN PLUMBING - -
B.III.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR BERSIH - -
B.III.2.1.1 EKSTERNAL AREA (SITE INFRASTRUKTUR AREA) - -
B.III.2.1.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA SISTEM AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.66 - 0.04
- Biaya Penyambungan PUDAM unit 1.00 8,177,090.80 8,177,090.80 0.039 - - -
- Cover GWT Ground Water Tank - -
- Galian Tanah m3 5.00 32,865.11 164,325.55 0.001 4.61 0.00 92.16
- Rabat Beton K-175 (Mollen Mix) m3 0.10 1,172,988.93 117,298.89 0.001 - - -
- Pasang Dinding Batu Bata 1SP : 5PP m2 9.00 192,566.83 1,733,101.47 0.008 - - -
- Cover Beton K-175 (Mollen Mix) m3 0.10 1,172,988.93 117,298.89 0.001 - - -
- Tulangan Wiremesh M8 kg 10.90 14,950.24 162,957.62 0.001 - - -
- Bekisting untuk plat 3x pakai m2 2.00 14,950.24 29,900.48 0.000 - - -
- GWT (Toren Fiber) Kapasitas 5 m³ unit 2.00 15,097,776.13 30,195,552.26 0.143 0.60 0.04 30.00
- POMPA TRANSFER (JET PUMP) - 60 L/min, HEAD 42 M, 220 V/50 Hz, 0,65 Kw (By Grundfos) unit 1.00 18,023,146.36 18,023,146.36 0.085 - - -
- Panel Kontrol Pompa Transfer (PC-Pompa Jet Pump) unit 1.00 2,906,803.69 2,906,803.69 0.014 - - -
- Dari Panel Utama (MDP) ke PC-POMPA JET PUMP, kabel NYY 3x2,5 mm2 m 66.00 46,087.14 3,041,751.24 0.014 - - -
- Kabel Power Pompa Transfer dari PC-POMPA JET PUMP NYM 3 x 2,5 mm2 + HIC 20 mm m 6.00 60,574.86 363,449.16 0.002 - - -
- Kabel Kontak Radar WLC NYM 3 x 2,5 mm2 + HIC 20 mm m 26.00 60,574.86 1,574,946.36 0.007 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Kabel Elektroda NYM 3 x 2,5 mm2 + HIC 20 mm m 58.00 60,574.86 3,513,341.88 0.017 - - -
- Check Valve 40 mm (1 1/2") no 2.00 1,205,406.57 2,410,813.14 0.011 - - -
- Gate Valve 40 mm (1 1/2") no 8.00 1,256,914.61 10,055,316.88 0.047 - - -
- Floating Valve 40 mm (1 1/2") no 1.00 1,770,202.02 1,770,202.02 0.008 - - -
- Radar + Pelampung untuk Tangki Air Bersih unit 2.00 178,952.91 357,905.82 0.002 - - -
- Elektroda untuk Pompa CW unit 1.00 69,921.22 69,921.22 0.000 - - -
- POMPA DISTRIBUSI (BOOSTER PUMP) - POMPA.CW, 76 L/min, HEAD 21 M, 220 V/50 Hz, 0,65 Kw (By unit 1.00 24,540,512.50 24,540,512.50 0.116 - - -
- Kabel Power Pompa CW dari PP-LT.2 NYM 3 x 2,5 mm2 + HIC 20 mm m 27.00 60,574.86 1,635,521.22 0.008 - - -
- Tangki Air Bersih 1500 Liter unit 2.00 5,095,898.25 10,191,796.50 0.048 - - -
- Pipa PPR PN 10 dia 40 mm (1 1/2") dari titik meteran PDAM ke GWT m 5.00 223,957.73 1,119,788.65 0.005 - - -
- Pipa PPR PN 10 dia 40 mm (1 1/2") dari GWT ke Tangki Penampungan Air Bersih m 50.00 223,957.73 11,197,886.50 0.053 - - -
- Pipa PPR PN 10 dia 40 mm (1 1/2") m 28.00 223,957.73 6,270,816.44 0.030 - - -
- Pipa PPR PN 10 dia 50 mm (2") m 1.00 346,253.86 346,253.86 0.002 - - -
140,087,699.40
B.III.2.1.2 LANTAI 1 - -
B.III.2.1.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.11 - -
- Pipa PPR PN10 dia 40 mm (1 1/2") m 31.00 223,957.73 6,942,689.63 0.033 - - -
- Pipa PPR PN10 dia 32 mm (1 1/4") m 17.00 151,015.98 2,567,271.66 0.012 - - -
- Pipa PPR PN10 dia 25 mm (1") m 32.00 102,574.60 3,282,387.20 0.016 - - -
- Pipa PPR PN10 dia 20 mm (3/4") m 113.00 65,525.73 7,404,407.49 0.035 - - -
- Gate Valve 40 mm (1 1/2") no 1.00 1,256,914.61 1,256,914.61 0.006 - - -
- Penggantung Pipa Dia 1-1/2" (40 mm), Untuk Pipa PPR PN 10 Dia 1-1/2", Jarak 2 m Titik 10.00 43,644.07 436,440.70 0.002 - - -
- Penggantung Pipa Dia 1-1/4" (32 mm), Untuk Pipa PPR PN 10 Dia 1-1/4", Jarak 2 m Titik 7.00 43,022.90 301,160.30 0.001 - - -
- Penggantung Pipa Dia 1" (25 mm), Untuk Pipa PPR PN 10 Dia 1", Jarak 2 m Titik 14.00 42,406.55 593,691.70 0.003 - - -
22,784,963.29
B.III.2.1.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SANITARY (BY TOTO) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, mengacu pada spektek dan gambar detail) 0.77 - -
- Wastafel LW526J (Type Meja, Komplit dengan kran, drain leher angsa dan pop up) no 4.00 7,412,028.85 29,648,115.40 0.140 - - -
- Wastafel LW240CJ (Type Dinding, Komplit dengan kran, drain leher angsa dan pop up) no 6.00 4,130,909.12 24,785,454.72 0.117 - - -
- Closet C51-T150NL (Type Duduk, komplit dengan Tangki Flushing & Jet Spray) no 2.00 8,215,222.83 16,430,445.66 0.078 - - -
- Closet CW660NJ-SW660J (Type Duduk, komplit dengan Tangki Flushing & Jet Spary ) no 9.00 6,210,418.26 55,893,764.34 0.264 - - -
- Grab Bar no 4.00 974,402.60 3,897,610.40 0.018 - - -
- Urinal U57M no 3.00 5,191,887.57 15,575,662.71 0.074 - - -
- Urinal Partition A100 no 2.00 2,618,165.12 5,236,330.24 0.025 - - -
- Kran T23B13 no 3.00 547,358.16 1,642,074.48 0.008 - - -
- Jet Washer no 11.00 914,187.11 10,056,058.21 0.047 - - -
163,165,516.16
B.III.2.1.3 LANTAI 2 - -
B.III.2.1.3.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.08 - -
- Pipa PPR PN10 dia 40 mm (1 1/2") m 24.00 223,957.73 5,374,985.52 0.025 - - -
- Pipa PPR PN10 dia 32 mm (1 1/4") m 14.00 151,015.98 2,114,223.72 0.010 - - -
- Pipa PPR PN10 dia 25 mm (1") m 14.00 102,574.60 1,436,044.40 0.007 - - -
- Pipa PPR PN10 dia 20 mm (3/4") m 89.00 65,525.73 5,831,789.97 0.028 - - -
- Gate Valve 40 mm (1 1/2") no 1.00 1,256,914.61 1,256,914.61 0.006 - - -
- Penggantung Pipa Dia 1-1/2" (40 mm), Untuk Pipa PPR PN 10 Dia 1-1/2", Jarak 2 m Titik 11.00 43,644.07 480,084.77 0.002 - - -
- Penggantung Pipa Dia 1-1/4" (32 mm), Untuk Pipa PPR PN 10 Dia 1-1/4", Jarak 2 m Titik 6.00 43,022.90 258,137.40 0.001 - - -
- Penggantung Pipa Dia 1" (25 mm), Untuk Pipa PPR PN 10 Dia 1", Jarak 2 m Titik 6.00 42,406.55 254,439.30 0.001 - - -
17,006,619.69
B.III.2.1.3.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SANITARY (BY TOTO) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, mengacu pada spektek dan gambar detail) 0.30 - -
- Wastafel LW240CJ (Type Dinding, Komplit dengan kran, drain leher angsa dan pop up) no 2.00 4,130,909.12 8,261,818.24 0.039 - - -
- Urinal U57M no 2.00 5,191,887.57 10,383,775.14 0.049 - - -
- Urinal Partition A100 no 2.00 2,618,165.12 5,236,330.24 0.025 - - -
- Closet CW660NJ-SW660J (Type Duduk, komplit dengan Tangki Flushing & Jet Spary ) no 4.00 6,210,418.26 24,841,673.04 0.117 - - -
- Shower Set TX432SDN no 2.00 2,982,139.81 5,964,279.62 0.028 - - -
- Kran T23B13 no 6.00 547,358.16 3,284,148.96 0.016 - - -
- Jet Washer no 4.00 914,187.11 3,656,748.44 0.017 - - -
- Kitchenzink (komplit dengan kran, drain leher angsa dan pop up) no 1.00 1,558,501.99 1,558,501.99 0.007 - - -
63,187,275.67
B.III.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR BEKAS DAN AIR KOTOR - -
B.III.2.2.1 EKSTERNAL AREA ( SITE INSFRASTRUKTUR AREA) - -
B.III.2.2.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA SISTEM AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) - -
- Cover STP 0.32 - 0.09
- Galian Tanah m³ 6.45 32,865.11 211,979.96 0.001 6.45 0.00 100.00
- Rabat Beton K-175 (Mollen Mix) m³ 0.38 1,172,988.93 445,735.79 0.002 - - -
- Pasang Dinding Batu Bata 1SP : 5PP m³ 13.22 192,566.83 2,545,733.49 0.012 - - -
- Cover Beton K-175 (Mollen Mix) m³ 0.38 1,172,988.93 445,735.79 0.002 - - -
- Tulangan Wiremesh M8 kg 19.69 14,950.24 294,370.23 0.001 - - -
- Bekisting untuk plat 3x pakai m² 4.59 14,950.24 68,621.60 0.000 - - -
- STP Biotek Cap 3000 L komplit dengan MINI BLOWER 50 CFM (220 V/ 50 Hz; 0,3 Kw) unit 1.00 59,924,930.56 59,924,930.56 0.283 0.30 0.08 30.00
- Sumur Resapan Dia 1000 mm, kedalaman 3 m unit 1.00 2,633,305.90 2,633,305.90 0.012 - - -
- Pipa PVC Class AW dia 100 mm (4") dari Biotek ke Sumur Resapan m 3.00 208,762.36 626,287.08 0.003 - - -
- Pipa PVC Class AW dia 100 mm (4") dari Sumur Resapan ke Saluran Terdekat m 2.00 208,762.36 417,524.72 0.002 - - -
67,614,225.13
B.III.2.2.2 LANTAI 1 - -
B.III.2.2.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.20 - 0.16
- Pipa PVC Class AW dia 165 mm (6") m 45.00 420,362.15 18,916,296.75 0.089 40.00 0.08 88.89
- Pipa PVC Class AW dia 100 mm (4") m 59.00 208,762.36 12,316,979.24 0.058 43.00 0.04 72.88
- Pipa PVC Class AW dia 80 mm (3") m 38.00 135,629.09 5,153,905.42 0.024 29.50 0.02 77.63
- Pipa PVC Class AW dia 50 mm (2") m 77.00 73,939.92 5,693,373.84 0.027 63.00 0.02 81.82
42,080,555.25
B.III.2.2.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.04 - -
- Floor Drain dia 50 mm (2") no 12.00 567,002.12 6,804,025.44 0.032 - - -
- FCO (Floor Clean Out) dia 100 mm (4") no 2.00 850,032.58 1,700,065.16 0.008 - - -
8,504,090.60
B.III.2.2.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA VENTING - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - -
- Pipa PVC Class AW dia 50 mm (2") m 15.00 73,939.92 1,109,098.80 0.005 - - -
1,109,098.80
B.III.2.2.3 LANTAI 2 - -
B.III.2.2.3.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.06 - 0.02
- Pipa PVC Class AW dia 100 mm (4") m 31.00 208,762.36 6,471,633.16 0.031 9.30 0.01 30.00
- Pipa PVC Class AW dia 80 mm (3") m 26.00 135,629.09 3,526,356.34 0.017 7.80 0.00 30.00
- Pipa PVC Class AW dia 50 mm (2") m 43.00 73,939.92 3,179,416.56 0.015 12.90 0.00 30.00
- Penggantung Pipa Dia 4" (100 mm), Untuk Pipa PVC Class AW Dia 4", Jarak 2 m Titik 5.00 62,322.33 311,611.65 0.001 - - -
- Penggantung Pipa Dia 3" (80 mm) dan Dia. 4" (100 mm) , Jarak 2 m Titik 2.00 127,994.39 255,988.78 0.001 - - -
13,745,006.49
B.III.2.2.3.2 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.02 - -
- Floor Drain dia 50 mm (2") no 6.00 567,002.12 3,402,012.72 0.016 - - -
- FCO (Floor Clean Out) dia 100 mm (4") no 1.00 850,032.58 850,032.58 0.004 - - -
- FCO (Floor Clean Out) dia 80 mm (3") no 1.00 466,560.36 466,560.36 0.002 - - -
4,718,605.66
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
B.III.2.2.3.3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA VENTING - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - -
- Pipa PVC Class AW dia 50 mm (2") m 15.00 208,762.36 3,131,435.40 0.015 - - -
3,131,435.40
B.III.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR HUJAN - -
B.III.2.3.1 AREA GEDUNG UTAMA - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.15 - 0.01
- Roof Drain dia 100 mm (4") no 12.00 594,559.58 7,134,714.96 0.034 - - -
- Pipa PVC Class AW dia 100 mm (4") m 122.00 208,762.36 25,469,007.92 0.120 13.20 0.01 10.82
32,603,722.88
B.III.3 PEKERJAAN MECHANICAL FIRE FIGHTING - -
B.III.3.1 LANTAI 1 - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.06 - -
- PFE-6 KG CO POWDER (APAR) Komplit Dengan Box Kaca Dan Stiker Penanda unit 5.00 2,539,669.37 12,698,346.85 0.060 - - -
12,698,346.85
B.III.3.1 LANTAI 2 - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.02 - -
- PFE-6 KG CO POWDER (APAR) Komplit Dengan Box Kaca Dan Stiker Penanda unit 2.00 2,539,669.37 5,079,338.74 0.024 - - -
5,079,338.74

C PEKERJAAN PENDUKUNG GEDUNG PANEL MDP, GENSET - -


C.I PEKERJAAN STRUKTUR - -
C.I.1 PEKERJAAN STRUKTUR BAWAH - -
C.I.1.1 PEKERJAAN TANAH 0.04 - 0.04
1 Pek. Galian Tanah Pondasi Foot Plat m³ 19.52 32,865.11 641,526.95 0.003 19.52 0.00 100.00
2 Pek. Galian Tanah Saluran Kabel m³ 3.61 32,865.11 118,643.05 0.001 3.61 0.00 100.00
3 Pek. Urugan Kembali m³ 6.51 75,013.16 488,335.67 0.002 6.51 0.00 100.00
4 Pek. Urugan Pasir Bawah Pondasi Foot Plat m³ 0.61 458,036.45 279,402.23 0.001 0.61 0.00 100.00
5 Pek. Urugan Pasir Bawah Saluran Kabel m³ 0.36 458,036.45 164,893.12 0.001 0.36 0.00 100.00
6 Pek. Urugan Tanah Peninggian Bangunan m³ 27.27 269,097.09 7,338,277.64 0.035 27.27 0.03 100.00
9,031,078.67
C.I.1.2 PEKERJAAN LANTAI KERJA 0.01 - 0.01
1 Pek. Lantai Kerja (bedding) m³ 1.50 1,112,770.99 1,669,156.48 0.008 1.50 0.01 100.00
1,669,156.48
C.I.1.3 PEKERJAAN PILE CAP - -
1 Pekerjaan Foot Plat 80x80x20 cm (FP1) 0.09 - 0.09
- Pek. Beton K-225 m³ 1.79 1,319,405.84 2,361,736.45 0.011 1.79 0.01 100.00
- Pek. Besi Ulir D 13 - 150 kg 614.57 18,373.38 11,291,728.15 0.053 614.57 0.05 100.00
- Pek. Bekisting untuk pondasi 3x pakai m² 8.96 185,027.69 1,657,848.10 0.008 8.96 0.01 100.00
2 Pekerjaan Foot Plat 60x60x20 cm (FP2) - -
- Pek. Beton K-225 m³ 0.65 1,319,405.84 857,613.80 0.004 0.65 0.00 100.00
- Pek. Besi Ulir D 13 - 150 kg 127.54 18,373.38 2,343,340.89 0.011 127.54 0.01 100.00
- Pek. Bekisting untuk pondasi 3x pakai m² 4.32 185,027.69 799,319.62 0.004 4.32 0.00 100.00
19,311,587.00
C.I.1.4 PEKERJAAN SLOOF - -
1 Pekerjaan Sloof 15x25 cm (S1) 0.16 - 0.16
- Pek. Beton K-225 m³ 4.44 1,319,405.84 5,858,161.93 0.028 4.44 0.03 100.00
- Pek. Besi Polos 6 Ø 12 kg 648.55 17,234.15 11,177,207.98 0.053 648.55 0.05 100.00
- Pek. Besi Polos Ø 8 - 150 kg 331.51 17,234.15 5,713,293.07 0.027 331.51 0.03 100.00
- Pek. Bekisting untuk sloof m² 59.25 191,266.07 11,332,514.65 0.054 59.25 0.05 100.00
34,081,177.63
C.I.1.5 PEKERJAAN KOLOM PEDESTAL - -
1 Pekerjaan Kolom Pedestal 25x25 cm (PK1) 0.07 - 0.07
- Pek. Beton K-225 m³ 0.96 1,319,405.84 1,266,629.61 0.006 0.96 0.01 100.00
- Pek. Besi Ulir 8 D 13 kg 165.16 18,373.38 3,034,547.44 0.014 165.16 0.01 100.00
- Pek. Besi polos Ø 10 - 150 kg 88.34 17,234.15 1,522,464.81 0.007 88.34 0.01 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 15.40 244,825.77 3,770,316.86 0.018 15.40 0.02 100.00
2 Pekerjaan Kolom Pedestail 12x30 cm (PK2) - -
- Pek. Beton K-225 m³ 0.36 1,319,405.84 474,986.10 0.002 0.36 0.00 100.00
- Pek. Besi Ulir 8 D 13 kg 53.09 18,373.38 975,442.74 0.005 53.09 0.00 100.00
- Pek. Besi polos Ø 10 - 150 kg 56.79 17,234.15 978,727.38 0.005 56.79 0.00 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 8.32 244,825.77 2,036,950.41 0.010 8.32 0.01 100.00
14,060,065.35
C.I.2 PEKERJAAN STRUKTUR - -
C.I.2.1 PEKERJAAN LANTAI DASAR BETON - -
1 Lantai Rabat Beton Bertulang t = 10 cm ( Tulangan Wiremesh M6 ) 0.15 - 0.12
- Pek. Beton K-225 m³ 22.59 1,319,405.84 29,805,377.93 0.141 18.90 0.12 83.67
- Pek. Wiremesh 2.1 x 5.4 (6 mm) kg 71.73 16,604.77 1,191,060.15 0.006 71.73 0.01 100.00
30,996,438.08
C.I.2.2 PEKERJAAN KOLOM BETON - -
1 Pekerjaan Kolom 25x25 cm (K1) 0.19 - 0.19
- Pek. Beton K-225 m³ 3.33 1,319,405.84 4,393,621.45 0.021 3.33 0.02 100.00
- Pek. Besi Ulir 8 D 13 kg 347.82 18,373.38 6,390,629.03 0.030 347.82 0.03 100.00
- Pek. Besi Polos Ø 10 - 150 kg 215.33 17,234.15 3,711,029.52 0.018 215.33 0.02 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 53.20 244,825.77 13,024,730.96 0.062 53.20 0.06 100.00
2 Pekerjaan Kolom 12x30 cm (K2) - -
- Pek. Beton K-225 m³ 1.03 1,319,405.84 1,358,988.02 0.006 1.03 0.01 100.00
- Pek. Besi Ulir 8 D 13 kg 149.06 18,373.38 2,738,736.02 0.013 149.06 0.01 100.00
- Pek. Besi Polos Ø 10 - 150 kg 115.36 17,234.15 1,988,131.54 0.009 115.36 0.01 100.00
- Pek. Bekisting untuk kolom 3x pakai m² 28.73 244,825.77 7,033,844.37 0.033 28.73 0.03 100.00
40,639,710.92
C.I.2.3 PEKERJAAN BALOK BETON - -
1 Pekerjaan Balok 15x30 cm 0.37 - 0.37
- Pek. Beton K-225 m³ 8.21 1,319,405.84 10,832,321.95 0.051 8.21 0.05 100.00
- Pek. Besi Ulir 6 D 13 kg 1,165.16 18,373.38 21,407,927.44 0.101 1,165.16 0.10 100.00
- Pek. Besi Polos 2 Ø 12 kg 29.91 17,234.15 515,473.43 0.002 29.91 0.00 100.00
- Pek. Besi Polos Ø 10 - 150 kg 713.06 17,234.15 12,288,983.00 0.058 713.06 0.06 100.00
- Pek. Bekisting untuk balok 3x pakai m² 136.91 247,727.48 33,916,369.29 0.160 136.91 0.16 100.00
78,961,075.10
C.I.2.4 PEKERJAAN ATAP - -
1 Pekerjaan Plat Atap t = 10 cm 0.61 - 0.61
- Beton K-225 (Ready Mix) m² 25.33 1,319,405.84 33,420,549.93 0.158 25.33 0.16 100.00
- Tulangan Wiremesh M8 kg 1,380.35 14,950.24 20,636,563.78 0.097 1,380.35 0.10 100.00
- Pek. Bekisting untuk plat atap m² 253.28 299,856.23 75,947,585.93 0.359 253.28 0.36 100.00
130,004,699.65

C.I.2.5 PEKERJAAN BADUKAN 0.04 - 0.04


- Pek. Badukan Bata Ringan m² 16.02 192,566.83 3,084,920.62 0.015 16.02 0.01 100.00
-Pek. Plesteran Mortar Siap Pakai ( MSP ) m² 32.04 85,569.87 2,741,658.63 0.013 32.04 0.01 100.00
-Pek. Acian Mortar Siap Pakai ( MSP ) m² 32.04 53,268.29 1,706,716.01 0.008 32.04 0.01 100.00
7,533,295.26

C.I.2.6 PEKERJAAN LISTPLANK BETON - -


1 Pekerjaan Plat Listplang t = 10 cm 0.20 - 0.20
- Pek. Beton K-225 m³ 6.64 1,319,405.84 8,760,854.78 0.041 6.64 0.04 100.00
- Pek. Tulangan Wiremesh M8 kg 340.64 14,950.24 5,092,649.75 0.024 340.64 0.02 100.00
- Pek. Bekisting untuk plat atap m² 98.07 299,856.23 29,406,900.48 0.139 98.07 0.14 100.00
43,260,405.01
C.I.2.7 PEKERJAAN SALURAN KABEL - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
1 Pekerjaan Beton Saluran Kabel 0.02 - 0.02
- Pek. Beton K-175 (Mollen Mix) m³ 2.16 1,172,988.93 2,533,656.09 0.012 2.16 0.01 100.00
- Pek. Wiremesh 2.1 x 5.4 (6 mm) kg 61.86 16,604.77 1,027,171.07 0.005 61.86 0.00 100.00
3,560,827.16
C.II PEKERJAAN ARSITEKTUR - -
C.II.1 PEKERJAAN LANTAI 1 - -
C.II.1.1 PEKERJAAN PASANGAN 0.97 - 0.16
1 Pek. Pasang Dinding Bata Ringan Tebal 10 cm m² 274.70 192,566.83 52,898,108.20 0.250 106.70 0.10 38.84
2 Pek. Pasang Rollag m² 33.52 192,566.83 6,454,840.14 0.030 - - -
3 Pek. Plesteran Mortar Siap Pakai ( MSP ) m² 670.58 85,569.87 57,381,443.42 0.271 67.06 0.03 10.00
4 Pek. Acian Mortar Siap Pakai ( MSP ) m² 749.63 53,268.29 39,931,508.23 0.189 74.96 0.02 10.00
5 Pek. Plesteran Skoning m' 283.00 62,663.96 17,733,900.68 0.084 - - -
6 Pek. Pasangan Roster m² 25.00 480,476.44 12,011,911.00 0.057 - - -
7 Pek. Beton Bertulang Kolom Praktis 11 x 11 cm m³ 72.20 132,347.31 9,555,475.78 0.045 21.66 0.01 30.00
8 Pek. Beton Bertulang Balok Latei 10 x 15 cm m³ 54.13 168,190.20 9,104,135.53 0.043 - - -
205,071,322.99
C.II.1.2 PEKERJAAN KUSEN,PINTU DAN JENDELA 0.67 - -
1 Pek. Pemasangan Pintu (P1) unit 5.00 5,837,482.63 29,187,413.15 0.138 - - -
2 Pek. Pemasangan Pintu (P2) unit 1.00 5,837,482.63 5,837,482.63 0.028 - - -
3 Pek. Pemasangan Pintu Kaca 1 (PK1) unit 1.00 10,923,016.83 10,923,016.83 0.052 - - -
4 Pek. Pemasangan Pintu Kaca 1 (PK2) unit 1.00 15,499,486.67 15,499,486.67 0.073 - - -
5 Pek. Pemasangan Pintu Kaca 1 (PK3) unit 1.00 10,923,016.83 10,923,016.83 0.052 - - -
6 Pek. Pemasangan Pintu Besi 1 (PB1) unit 2.00 8,899,513.66 17,799,027.32 0.084 - - -
7 Pek. Pemasangan Jendela BV 1 (BV1) unit 1.00 723,622.13 723,622.13 0.003 - - -
8 Pek. Pemasangan Jendela BV 1 (BV2) unit 5.00 998,803.22 4,994,016.10 0.024 - - -
9 Pek. Pemasangan Jendela 1 (J1) unit 3.00 6,263,530.66 18,790,591.98 0.089 - - -
10 Pek. Pemasangan Kubikel m² 14.40 1,838,278.20 26,471,206.08 0.125 - - -
141,148,879.72
C.II.1.3 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.92 - -
1 Pek. Pasang Lantai Interior Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 91.95 328,795.83 30,232,776.57 0.143 - - -
2 Pek. Pasang Lantai Exterior Granite Tile Matt Valentino Rover Beige ukuran (60 x 60) cm m² 76.78 299,628.94 23,005,510.01 0.109 - - -
3 Pek. Pasang Lantai KM Granite Tile Matt Valentino Mozart Dark Grey ukuran (60 x 60) cm m² 48.94 314,548.15 15,393,986.46 0.073 - - -
4 Pasang Dinding Granite Tile Valentino Gress Mozart Cemento ukuran (30 x 60) cm Toilet m² 153.53 362,919.70 55,719,061.54 0.263 - - -
5 Pek. Pasang Meja Wastafel Granite Tile Matt Ticino Black Valentino ukuran (60 x 60) cm m² 4.64 349,786.67 1,623,010.15 0.008 - - -
6 Pasang Dinding Granite Tile Valentino Gress Mozart Cemento ukuran (30 x 60) cm Pantry m² 1.80 362,919.70 653,255.46 0.003 - - -
7 pek. Waterprofing Sikalastic 590 4x lapis (Menggunakan membran fiberglass Sika 120 reemat) m² 257.40 264,394.12 68,055,046.49 0.321 - - -
194,682,646.68
C.II.1.4 PEKERJAAN PLAFON 0.14 - -
1 Pek. Pasang Rangka Plafon Hollow Gypsum Board m² 21.73 149,667.07 3,252,265.43 0.015 - - -
2 Pek. Pasang Penutup Plafon Gypsum Board tebal 9 mm m² 21.73 68,126.82 1,480,395.80 0.007 - - -
3 Pek. Pasang Rangka Plafon Hollow Kalsiboard m² 113.02 149,667.07 16,915,372.25 0.080 - - -
4 Pek. Pasang Penutup Plafon Kalsiboard tebal 4 mm m² 113.02 51,481.29 5,818,415.40 0.027 - - -
5 Pek. Pasang Shadowline (Tali Air) m' 136.81 15,566.28 2,129,622.77 0.010 - - -
29,596,071.64
C.II.1.5 PEKERJAAN PENGECATAN 0.52 - -
1 Pek. Pengecatan Dinding Interior m² 384.82 52,270.67 20,114,799.23 0.095 - - -
2 Pek. Pengecatan Dinding Exterior m² 237.20 61,104.17 14,493,909.12 0.068 - - -
3 Pek. Pengecatan Plafon m² 134.75 45,218.51 6,093,194.22 0.029 - - -
4 Pek. Pengecatan Dengan Meni Besi "Warna Hitam" m² 9.13 116,964.59 1,067,886.71 0.005 - - -
5 Pek. Screed (MSP) tebal 20 mm m² 180.00 112,831.24 20,309,623.20 0.096 - - -
6 pek. Waterprofing Sikalastic 590 4x lapis (Menggunakan membran fiberglass Sika 120 reemat) m² 180.00 264,394.12 47,590,941.60 0.225 - - -
109,670,354.08
C.II.1.6 PEKERJAAN SANITAIR 0.00 - -
1 Pek. Pemasangan Kaca Cermin tebal 5 mm m² 3.20 215,498.28 689,594.50 0.003 - - -
689,594.50
C.II.1.7 PEKERJAAN ALLUMUNIUM COMPOSITE PANEL ( ACP ) 0.91 - -
1 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PVDF Type Glossy Allumunium Thickness 0,3 m² 208.00 923,792.62 192,148,864.96 0.908 - - -
192,148,864.96
C.II.1.8 PEKERJAAN GRILL PENUTUP SALURAN KABEL 0.02 - -
1 Pek. Rangka Besi Siku 60.60.6 kg 82.44 28,934.75 2,385,380.79 0.011 - - -
2 Pek. Rangka Besi Siku 50.50.5 kg 27.22 33,612.58 914,934.43 0.004 - - -
3 Pek. Grill Besi D13 kg 105.13 18,373.38 1,931,593.44 0.009 - - -
5,231,908.66

C.III PEKERJAAN MEEP GEDUNG PENDUKUNG - -


C.III.1 PEKERJAAN INSATALASI TATA UDARA (MVAC) - -
C.III.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN TATA UDARA (SINGLE SPLIT SYSTEM) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.14 - -
- Indoor Unit-1,2, R. TUNGGU (wall mounted type), 12000 BTU/H unit 2.00 7,424,145.08 14,848,290.16 0.070 - - -
WALL MOUNTED - 1 1/2 PK - -
- Indoor Unit-1, MUSHOLA (wall mounted type), 12000 BTU/H unit 1.00 7,424,145.08 7,424,145.08 0.035 - - -
WALL MOUNTED - 1 1/2 PK - -
- Indoor Unit-1, GUDANG (wall mounted type), 12000 BTU/H unit 1.00 7,424,145.08 7,424,145.08 0.035 - - -
WALL MOUNTED - 1 1/2 PK - -
29,696,580.32
C.III.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA REFRIGERANT - -
(Meliputi material pendukung, komplit dgn isolasi dgn ketebalan isolasi 19 mm sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pendukung terkait berjalannya 0.02 - -
- Ref Pipe Liquid dia. 1/4" (6,35 mm) m' 14.00 110,251.86 1,543,526.04 0.007 - - -
Gas dia. 1/2" (12,70 mm) m' 14.00 205,965.92 2,883,522.88 0.014 - - -
4,427,048.92
C.III.1.3 PEKERJAAN PENGADAAN DAN PEMASANGAN REFRIGERANT GAS 0.01 - -
- Refrigerant Gas R32 kg 14.57 189,732.59 2,764,403.84 0.013 - - -
2,764,403.84
C.III.1.4 PEKERJAAN PENGADAAN DAN PEMASANGAN KONTROL UNIT INDOOR AC 0.00 - -
- Kabel 2x AWG 18 mm2 + HIC 20 mm (indoor unit to Outdoor Unit) m' 14.00 39,110.67 547,549.38 0.003 - - -
547,549.38
C.III.1.5 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PIPA DRAIN UNIT AC - -
(Material pipa PVC Class AW, Meliputi material pendukung, komplit dengan isolasi dgn ketebalan isolasi sesuai dengan spesifikasi teknis, alat bantu serta segala aksessoris pen 0.01 - -
- Pipa Drain dia 25 mm (1 ") m' 35.00 80,976.52 2,834,178.20 0.013 - - -
2,834,178.20
C.III.1.6 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM VENTILASI UDARA - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, swicth looping saklar) 0.05 - -
- Pipa PVC class "D" dia 100 mm (4") Exhaust Fan ke Louver Grille m 13.00 136,037.30 1,768,484.90 0.008 - - -
- Ceilling Exhaust Fan unit Cap 70 CFM unit 3.00 1,578,914.53 4,736,743.59 0.022 - - -
- Blower Dinding uk. 18" unit 1.00 4,076,663.38 4,076,663.38 0.019 - - -
- Exhaust Air Louver Grille uk 150 x 150 mm no 1.00 279,508.62 279,508.62 0.001 - - -
10,861,400.49
C.III.2 PEKERJAAN ELEKTRIKAL - -
C.III.2.1 RUANG PANEL UTAMA - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 4.96 - 0.42
- Genset Super Silent Diesel GENSET CUMMINS Kapasitas 250 KVA (komplit dengan knalpot tambahan, t unit 1.00 553,303,797.01 553,303,797.01 2.613 - - -
- Panel MDP no 1.00 178,468,975.25 178,468,975.25 0.843 - - -
- Kabel feeder dari PLN ke MDP NYFGBY 4x150 mm2 (Prov Quantity)-underground m 139.35 2,124,087.66 296,001,580.02 1.398 41.81 0.42 30.00
- Kabel feeder dari Genset ke MDP NYFGBY 4x150 + NYA 70 mm2 m 7.00 2,330,749.27 16,315,244.89 0.077 - - -
- Lampu Downlight LED 10 watt Outbow bh 6.00 210,869.52 1,265,217.12 0.006 - - -
- Saklar Tunggal / Engkel no 1.00 44,239.12 44,239.12 0.000 - - -
- Saklar Ganda / Seri no 1.00 63,971.02 63,971.02 0.000 - - -
- Instalasi Penerangan dengan Kabel NYM 3 x 1,5 mm2 + HIC 20 mm point 6.00 534,398.69 3,206,392.14 0.015 - - -
- Instalasi Saklar Penerangan dengan Kabel 3 x 1,5 mm2 + HIC 20 mm point 2.00 279,323.52 558,647.04 0.003 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Stop Kontak Dinding no 1.00 47,655.11 47,655.11 0.000 - - -
- Instalasi Stop Kontak dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm point 1.00 749,178.73 749,178.73 0.004 - - -
- Instalasi Power Blower Dinding dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm m 10.00 60,574.86 605,748.60 0.003 - - -
1,050,630,646.05
C.III.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN PANEL - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - -
- MCB BOX - G. PENDUKUNG unit 1.00 2,942,330.78 2,942,330.78 0.014 - - -
2,942,330.78
C.III.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN KEBEL FEEDER 0.02 - -
- Dari Panel Utama (MDP) ke MBC BOX - G. PENDUKUNG, kabel NYY 3x6 +NYA 4 mm2 m' 36.00 105,595.00 3,801,420.00 0.018 - - -
3,801,420.00
C.III.2.4 PEKERJAAN PENGADAAN DAN PEMASANGAN PENERANGAN DAN STOPKONTAK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.16 - -
- Lampu Downlight LED 5 watt bh 4.00 138,829.53 555,318.12 0.003 - - -
- Lampu Downlight LED 9 watt bh 14.00 166,019.88 2,324,278.32 0.011 - - -
- Lampu Downlight LED 10 watt Outbow bh 9.00 210,869.52 1,897,825.68 0.009 - - -
- Lampu Downlight LED 13 watt bh 2.00 189,324.13 378,648.26 0.002 - - -
- Saklar Tunggal / Engkel no 5.00 44,239.12 221,195.60 0.001 - - -
- Saklar Ganda / Seri no 4.00 63,971.02 255,884.08 0.001 - - -
- Instalasi Penerangan dengan Kabel 3 x 1,5 mm2 + HIC 20 mm point 29.00 534,398.69 15,497,562.01 0.073 - - -
- Instalasi Saklar Penerangan dengan Kabel 3 x 1,5 mm2 + HIC 20 mm point 9.00 279,323.52 2,513,911.68 0.012 - - -
- Stop Kontak Dinding no 6.00 47,655.11 285,930.66 0.001 - - -
- Stop Kontak Dinding (Switch Socket Outlet) no 5.00 134,639.04 673,195.20 0.003 - - -
- Instalasi Stop Kontak dengan Kabel 3 x 2,5 mm2 + HIC 20 mm point 6.00 749,178.73 4,495,072.38 0.021 - - -
- Instalasi Power Indoor AC dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm m 54.00 60,574.86 3,271,042.44 0.015 - - -
- Instalasi Power Exhaust Fan dengan Kabel 3 x 2,5 mm2 + HIC 20 mm m 10.00 60,574.86 605,748.60 0.003 - - -
32,975,613.03
C.III.3 AREA EKSTERNAL GEDUNG PENDUKUNG - -
C.III.3.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI GROUNDING PERALATAN ELEKTRIKAL DAN ELEKTRONIK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.16 - -
- Tancapan Grounding Elektrikal (Pentanahan dgn Kabel BC 50 mm2 sampai mendapatkan nilai resistansi ls 1.00 12,589,190.55 12,589,190.55 0.059 - - -
- Tancapan Grounding Genset (Pentanahan dgn Kabel BC 50 mm2 sampai mendapatkan nilai resistansi m ls 1.00 12,589,190.55 12,589,190.55 0.059 - - -
- Kabel Grounding Elektrikal NYA 150 sqmm (dari Bak Kontrol ke Panel Utama Elektrikal di Ruang Panel U m 16.00 415,594.20 6,649,507.20 0.031 - - -
- Kabel Grounding Genset NYA 150 sqmm m 6.00 415,594.20 2,493,565.20 0.012 - - -
34,321,453.50
C.III.4 PEKERJAAN PLUMBING - -
C.III.4.1 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR BERSIH - -
C.III.4.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.03 - -
- Pipa PVC Class AW dia 35 mm (1 1/4") m 10.00 49,487.34 494,873.40 0.002 - - -
- Pipa PVC Class AW dia 25 mm (1") m 44.00 35,094.64 1,544,164.16 0.007 - - -
- Pipa PVC Class AW dia 20 mm (3/4") m 39.00 34,180.95 1,333,057.05 0.006 - - -
- Gate Valve 40 mm (1 1/2") m 2.00 1,256,914.61 2,513,829.22 0.012 - - -
5,885,923.83
C.III.4.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SANITARY (BY TOTO) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, mengacu pada spektek dan gambar detail) 0.38 - -
- Wastafel LW526J (Type Meja, Komplit dengan kran, drain leher angsa dan pop up) no 4.00 7,412,028.85 29,648,115.40 0.140 - - -
- Closet C51-T150NL (Type Duduk, komplit dengan Tangki Flushing & Jet Spary) no 1.00 8,215,222.83 8,215,222.83 0.039 - - -
- Closet CW660NJ-SW660J (Type Duduk, komplit dengan Tangki Flushing & Jet Spray ) no 3.00 6,210,418.26 18,631,254.78 0.088 - - -
- Grab Bar no 2.00 974,402.60 1,948,805.20 0.009 - - -
- Urinal U57M no 2.00 5,191,887.57 10,383,775.14 0.049 - - -
- Urinal Partition A100 no 1.00 2,618,165.12 2,618,165.12 0.012 - - -
- Kran T23B13 no 8.00 547,358.16 4,378,865.28 0.021 - - -
- Jet Washer no 4.00 914,187.11 3,656,748.44 0.017 - - -
- Kitchenzink (komplit dengan kran, drain leher angsa dan pop up) no 1.00 1,558,501.99 1,558,501.99 0.007 - - -
81,039,454.18
C.III.4.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR BEKAS DAN AIR KOTOR - -
C.III.4.2.2 GEDUNG PENDUKUNG - -
C.III.4.2.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.04 - 0.03
- Pipa PVC Class AW dia 100 mm (4") m 20.00 208,762.36 4,175,247.20 0.020 16.00 0.02 80.00
- Pipa PVC Class AW dia 50 mm (2") m 46.00 73,939.92 3,401,236.32 0.016 40.00 0.01 86.96
7,576,483.52
C.III.4.2.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.02 - -
- Floor Drain dia 50 mm (2") no 7.00 567,002.12 3,969,014.84 0.019 - - -
3,969,014.84
C.III.4.2.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA VENTING - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.00 - -
- Pipa PVC Class AW dia 50 mm (2") m 6.00 73,939.92 443,639.52 0.002 - - -
443,639.52
C.III.4.3 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR HUJAN - -
C.III.4.3.1 GEDUNG PENDUKUNG - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.09 - 0.02
- Roof Drain dia 100 mm (4") no 7.00 594,559.58 4,161,917.06 0.020 - - -
- Pipa PVC Class AW dia 100 mm (4") m 67.00 208,762.36 13,987,078.12 0.066 15.84 0.02 23.65
18,148,995.18
C.III.5 PEKERJAAN MECHANICAL FIRE FIGHTING - -
C.III.5.1 LANTAI 1 - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - -
- PFE-6 KG CO POWDER (APAR) Komplit Dengan Box Kaca Dan Stiker Penanda no 1.00 2,539,669.37 2,539,669.37 0.012 - - -
2,539,669.37

D POS JAGA - -
D.I PEKERJAAN STRUKTUR - -
D.I.1 PEKERJAAN STRUKTUR BAWAH - -
D.I.1.1 PEKERJAAN TANAH 0.01 - 0.01
1 Galian Tanah Pondasi Foot Plat m³ 3.23 32,865.11 106,154.31 0.001 3.23 0.00 100.00
2 Urugan Kembali m³ 1.08 75,013.16 81,014.21 0.000 1.08 0.00 100.00
3 Urugan Pasir Bawah Pondasi Foot Plat m³ 0.11 458,036.45 50,384.01 0.000 0.11 0.00 100.00
4 Urugan Pasir Bawah Lantai m³ 0.48 458,036.45 219,857.50 0.001 - - -
5 Urugan Tanah Peninggian Bangunan m³ 5.53 269,097.09 1,488,106.91 0.007 5.53 0.01 100.00
1,945,516.93
D.I.1.2 PEKERJAAN LANTAI KERJA 0.00 - 0.00
1 Pek. Lantai Kerja (bedding) m³ 0.11 1,112,770.99 122,404.81 0.001 0.11 0.00 100.00
122,404.81
D.I.1.3 PEKERJAAN PILE CAP - -
1 Pekerjaan Foot Plat 60x60x20 cm (FP1) 0.02 - 0.02
- Beton K-225 (Ready Mix) m³ 0.43 1,319,405.84 567,344.51 0.003 0.43 0.00 100.00
- D 13 - 150 kg 151.56 18,373.38 2,784,669.47 0.013 151.56 0.01 100.00
- Bekisting untuk pondasi 3x pakai m² 1.44 185,027.69 266,439.87 0.001 1.44 0.00 100.00
3,618,453.86
D.I.1.4 PEKERJAAN SLOOF - -
1 Pekerjaan Sloof 15x25 cm (S1) 0.02 - 0.02
- Beton K-225 (Ready Mix) m³ 0.72 1,319,405.84 949,972.20 0.004 0.72 0.00 100.00
- 4 Ø 12 kg 81.59 17,234.15 1,406,134.30 0.007 81.59 0.01 100.00
- Ø 8 - 150 kg 36.23 17,234.15 624,393.25 0.003 36.23 0.00 100.00
- Bekisting untuk sloof 3x pakai m² 9.61 191,266.07 1,838,066.93 0.009 9.61 0.01 100.00
4,818,566.69
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
D.I.1.5 PEKERJAAN KOLOM PEDESTAL - -
1 Pekerjaan Kolom Pedestail 20x20 cm (K1) 0.01 - 0.01
- Beton K-225 (Ready Mix) m³ 0.14 1,319,405.84 184,716.82 0.001 0.14 0.00 100.00
- 8 Ø 12 kg 34.19 17,234.15 589,235.59 0.003 34.19 0.00 100.00
- Ø 8 - 150 kg 6.59 17,234.15 113,573.05 0.001 6.59 0.00 100.00
- Bekisting untuk kolom 3x pakai m² 2.88 244,825.77 705,098.22 0.003 2.88 0.00 100.00
2 Pekerjaan Kolom Pedestail 15x25 cm (K2) - -
- Beton K-225 (Ready Mix) m³ 0.07 1,319,405.84 92,358.41 0.000 0.07 0.00 100.00
- 8 Ø 12 kg 17.09 17,234.15 294,531.62 0.001 17.09 0.00 100.00
- Ø 8 - 150 kg 3.29 17,234.15 56,700.35 0.000 3.29 0.00 100.00
- Bekisting untuk kolom 3x pakai m² 1.44 244,825.77 352,549.11 0.002 1.44 0.00 100.00
2,388,763.17
D.I.2 PEKERJAAN STRUKTUR - -
D.I.2.1 PEKERJAAN LANTAI DASAR BETON - -
1 Lantai Rabat Beton Bertulang t = 10 cm 0.02 - 0.02
- Beton K-175 (Mollen Mix) m³ 2.51 1,172,988.93 2,944,202.21 0.014 2.51 0.01 100.00
- Wiremesh 2.1 x 5.4 (6 mm) kg 76.98 16,604.77 1,278,235.19 0.006 76.98 0.01 100.00
4,222,437.41
D.I.2.2 PEKERJAAN KOLOM PEDESTAL - -
1 Pekerjaan Kolom 20x20 cm (K1) 0.04 - 0.04
- Beton K-225 (Ready Mix) m³ 0.53 1,319,405.84 699,285.10 0.003 0.53 0.00 100.00
- 8 Ø 12 kg 102.34 17,234.15 1,763,742.91 0.008 102.34 0.01 100.00
- Ø 8 - 150 kg 24.16 17,234.15 416,377.06 0.002 24.16 0.00 100.00
- Bekisting untuk kolom 3x pakai m² 10.56 244,825.77 2,585,360.13 0.012 10.56 0.01 100.00
2 Pekerjaan Kolom 15x25 cm (K2) - -
- Beton K-225 (Ready Mix) m³ 0.25 1,319,405.84 329,851.46 0.002 0.25 0.00 100.00
- 8 Ø 12 kg 51.17 17,234.15 881,871.46 0.004 51.17 0.00 100.00
- Ø 8 - 150 kg 12.08 17,234.15 208,188.53 0.001 12.08 0.00 100.00
- Bekisting untuk kolom 3x pakai m² 5.28 244,825.77 1,292,680.07 0.006 5.28 0.01 100.00
8,177,356.71
D.I.2.3 PEKERJAAN BALOK BETON - -
1 Pekerjaan Balok 15x25 cm 0.05 - 0.05
- Beton K-225 (Ready Mix) m³ 1.09 1,319,405.84 1,438,152.37 0.007 1.09 0.01 100.00
- 6 Ø 12 kg 216.97 17,234.15 3,739,293.53 0.018 216.97 0.02 100.00
- Ø 8 - 150 kg 56.82 17,234.15 979,244.40 0.005 56.82 0.00 100.00
- Bekisting untuk balok 2x pakai m² 18.97 247,727.48 4,699,390.30 0.022 18.97 0.02 100.00
10,856,080.59
D.I.2.4 PEKERJAAN PLAT ATAP - -
1 Pekerjaan Plat Atap t = 10 cm 0.06 - 0.06
- Beton K-225 (Mollen Mix) m³ 2.47 1,319,405.84 3,258,932.42 0.015 2.47 0.02 100.00
- Wiremesh 2.1 x 5.4 (10 mm) kg 75.58 14,944.19 1,129,481.88 0.005 75.58 0.01 100.00
- Bekisting untuk pelat 3x pakai m² 26.64 299,856.23 7,988,169.97 0.038 26.64 0.04 100.00
12,376,584.27
D.I.2.5 PEKERJAAN LISTPLANK BETON - -
1 Pekerjaan Plat Listplank t = 10 cm 0.04 - 0.04
- Beton K-225 (Ready Mix) m³ 1.19 1,319,405.84 1,570,092.95 0.007 1.19 0.01 100.00
- Tulangan Wiremesh M6 kg 33.63 16,604.77 558,418.42 0.003 33.63 0.00 100.00
- Bekisting untuk Plat Atap 3x pakai m² 21.78 299,856.23 6,530,868.69 0.031 21.78 0.03 100.00
8,659,380.05
D.II PEKERJAAN ARSITEKTUR - -
D.II.1 PEKERJAAN PASANGAN 0.16 - -
1 Pasang Dinding Bata Ringan Tebal 10 cm m² 41.36 192,566.83 7,964,564.09 0.038 - - -
2 Pasang Rollag Bata ringan m² 9.90 192,566.83 1,906,411.62 0.009 - - -
3 Pekerjaan Plesteran dengan Mortar Siap Pakai (MSP) m² 105.45 85,569.87 9,023,342.79 0.043 - - -
4 Pekerjaan Acian dengan Mortar Siap Pakai (MSP) m² 133.65 53,268.29 7,119,306.96 0.034 - - -
5 Benangan Mortar Siap Pakai m² 88.19 31,331.98 2,763,167.32 0.013 - - -
6 Beton Bertulang Kolom Praktis 11 x 11 cm m' 13.20 132,347.31 1,746,984.49 0.008 - - -
7 Beton Bertulang Balok Latei 10 x 15 cm m' 8.74 168,190.20 1,469,982.35 0.007 - - -
8 Pekerjaan Screed m² 24.66 112,831.24 2,782,418.38 0.013 - - -
34,776,177.99
D.II.2 PEKERJAAN KUSEN,PINTU DAN JENDELA 0.02 - -
1 Pek. Pemasangan Pintu (PM) unit 1.00 4,181,374.40 4,181,374.40 0.020 - - -
4,181,374.40
D.II.3 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.07 - -
1 Pek. Pasang Lantai Interior Granite Tile Polished Valentino Classic White ukuran (60 x 60) cm m² 20.59 328,795.83 6,769,906.14 0.032 - - -
2 Pek. Pasang Lantai KM Granite Tile Matt Valentino Mozart Dark Grey ukuran (60 x 60) cm m² 1.92 314,548.15 603,932.45 0.003 - - -
3 Waterprofing atap ( Aquatite ) m² 28.62 264,394.12 7,566,959.71 0.036 - - -
14,940,798.30
D.II.4 PEKERJAAN PLAFON 0.01 - -
1 Pek. Pasang Rangka Plafon Hollow Gypsum Board m² 7.23 149,667.07 1,082,092.92 0.005 - - -
2 Pek. Pasang Penutup Plafon Gypsum Board tebal 9 mm m² 7.23 68,126.82 492,556.91 0.002 - - -
3 Pek. Pasang Rangka Plafon Hollow Kalsiboard m² 3.25 149,667.07 486,417.98 0.002 - - -
4 Pek. Pasang Penutup Plafon Kalsiboard tebal 4 mm m² 3.25 51,481.29 167,314.19 0.001 - - -
5 Pek. Pasang Shadowline (Tali Air) m 26.36 15,566.28 410,327.14 0.002 - - -
2,638,709.14
D.II.5 PEKERJAAN PENGECATAN 0.04 - -
1 Pekerjaan Pengecatan Dinding Interior m² 102.03 52,270.67 5,333,176.46 0.025 - - -
2 Pekerjaan Pengecatan Dinding Exterior m² 64.79 61,104.17 3,958,939.17 0.019 - - -
9,292,115.63
D.III PEKERJAAN MEKANIKAL ELEKTRIKAL ELEKTRONIK DAN PLUMBING (MEEP) - -
D.III.1 PEKERJAAN ELEKTRIKAL - -
D.III.1 POS JAGA - -
D.III.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN KABEL FEEDER - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.05 - -
- Dari MDP ke MCB BOX-POS JAGA, kabel NYY 3x6 +NYA 4 mm2 m 110.00 105,595.00 11,615,450.00 0.055 - - -
11,615,450.00
D.III.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN PANEL - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - -
- MCB BOX-POS JAGA unit 1.00 2,906,803.69 2,906,803.69 0.014 - - -
2,906,803.69
D.III.1.3 PEKERJAAN PENGADAAN DAN PEMASANGAN PENERANGAN DAN STOP KONTAK - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.04 - -
- Lampu Downlight LED 10 watt Outbow bh 4.00 210,869.52 843,478.08 0.004 - - -
- Lampu Downlight LED 9 watt bh 3.00 166,019.88 498,059.64 0.002 - - -
- Lampu Downlight LED 5 watt bh 1.00 138,829.53 138,829.53 0.001 - - -
- Saklar Tunggal / Engkel bh 1.00 44,239.12 44,239.12 0.000 - - -
- Saklar Ganda / Seri bh 1.00 63,971.02 63,971.02 0.000 - - -
- Instalasi Penerangan dengan Kabel NYM 3 x 1,5 mm2 + HIC 20 mm point 8.00 534,398.69 4,275,189.52 0.020 - - -
- Instalasi Saklar Penerangan dengan Kabel NYM 3 x 1,5 mm2 + HIC 20 mm point 2.00 279,323.52 558,647.04 0.003 - - -
- Stop Kontak Dinding no 2.00 47,655.11 95,310.22 0.000 - - -
- Instalasi Stop Kontak dengan Kabel NYM 3 x 2,5 mm2 + HIC 20 mm point 2.00 749,178.73 1,498,357.46 0.007 - - -
8,016,081.63
D.III.2 PEKERJAAN PLUMBING - -
D.III.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR BERSIH - -
D.III.2.1 POS JAGA - -
D.III.2.1.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BERSIH - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.00 - -
- Pipa PVC Class AW dia 25 mm (1") m 8.00 35,094.64 280,757.12 0.001 - - -
- Pipa PVC Class AW dia 20 mm (3/4") m 8.00 34,180.95 273,447.60 0.001 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
554,204.72
D.III.2.1.1.2 PEKERJAAN PENGADAAN DAN PEMASANGAN SANITARY (BY TOTO) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, mengacu pada spektek dan gambar detail) 0.06 - -
- Wastafel LW240CJ (Type Dinding, komplit dengan kran, drain leher angsa dan pop up) no 1.00 4,130,909.12 4,130,909.12 0.020 - - -
- Closet CW660NJ-SW660J (Type Duduk, komplit dengan Tangki Flushing dan Jet Spray) no 1.00 6,210,418.26 6,210,418.26 0.029 - - -
- Jet Washer no 1.00 914,187.11 914,187.11 0.004 - - -
- Kran T23B13 no 1.00 547,358.16 547,358.16 0.003 - - -
11,802,872.65
D.III.2.2 POS JAGA - -
D.III.2.2.1 PEKERJAAN PENGADAAN DAN PEMASANGAN PERALATAN UTAMA SISTEM AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.03 - -
- Septictank Konvensional 1 m3 unit 1.00 2,497,750.00 2,497,750.00 0.012 - - -
- Sumur Resapan Dia 1000 mm, kedalaman 3 m unit 1.00 2,633,305.90 2,633,305.90 0.012 - - -
- Pipa PVC Class AW dia 100 mm (4") dari Biotek ke Sumur Resapan m 2.00 208,762.36 417,524.72 0.002 - - -
- Pipa PVC Class AW dia 100 mm (4") dari Sumur Resapan ke Saluran Terdekat m 3.00 208,762.36 626,287.08 0.003 - - -
6,174,867.70
D.III.2.2.2 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.01 - 0.01
- Pipa PVC Class AW dia 100 mm (4") m 6.00 208,762.36 1,252,574.16 0.006 4.00 0.00 66.67
- Pipa PVC Class AW dia 50 mm (2") m 11.00 73,939.92 813,339.12 0.004 5.50 0.00 50.00
2,065,913.28
D.III.2.2.3 PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS AIR BEKAS DAN AIR KOTOR - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.00 - -
- Floor Drain dia 50 mm (2") no 1.00 567,002.12 567,002.12 0.003 - - -
567,002.12
D.III.2.3 POS JAGA - -
D.III.2.3.1 PEKERJAAN PENGADAAN DAN PEMASANGAN SISTEM AIR HUJAN - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.02 - -
- Roof Drain dia 100 mm (4") no 2.00 594,559.58 1,189,119.16 0.006 - - -
- Pipa PVC Class AW dia 80 mm (3") m 19.00 135,629.09 2,576,952.71 0.012 - - -
3,766,071.87

E PEMBANGUNAN LAPANGAN UJI PRAKTEK - -


E.I PEKERJAAN PERSIAPAN 0.15 - -
1 Pek. Mobilisasi & Demobilisasi Peralatan Jalan ls 1.00 31,750,740.00 31,750,740.00 0.150 - - -
31,750,740.00
E.II PEKERJAAN ASPAL AREA UJI PRAKTEK, AREA PARKIR R2 DAN AREA DROP OFF - -
E.II.1 PEKERJAAN LAPANGAN UJI PRAKTEK 5.67 - -
1 Pek. Lapis Cement Tread Base CTB m³ 663.48 805,998.16 534,763,659.20 2.526 - - -
2 Pek. Lapis Resap Pengikat - Aspal Emulsi ltr 2,653.94 30,673.27 81,405,018.18 0.384 - - -
5 Pek. Laston Lapis Aus (AC-WC) ton 298.57 1,957,761.58 584,528,874.94 2.761 - - -
1,200,697,552.32
E.II.2 PEKERJAAN AKSES MASUK SATPAS, AREA PARKIR R2 DAN AREA DROP OFF 2.30 - -
1 Pek. Lapis Cement Tread Base CTB m³ 268.80 805,998.16 216,652,305.41 1.023 - - -
2 Pek. Lapis Resap Pengikat - Aspal Emulsi ltr 1,075.20 30,673.27 32,979,899.90 0.156 - - -
3 Pek. Laston Lapis Aus (AC-WC) ton 120.96 1,957,761.58 236,810,840.72 1.118 - - -
486,443,046.03
E.III PEKERJAAN RAM DAN TANJAKAN UJI PRAKTEK 1.39 - 1.16
1 Pek. Galian Tanah Biasa m³ 44.72 32,865.11 1,469,727.72 0.007 44.72 0.01 100.00
2 Pek. Urugan Tanah Kembali m³ 14.91 75,013.16 1,118,446.22 0.005 14.91 0.01 100.00
3 Pek. Timbunan Pilihan Dari Sumber Galian Menggunkan Alat m³ 95.06 269,097.09 25,580,369.38 0.121 95.06 0.12 100.00
4 Pek. Pasang Pondasi Batu Belah 1SP : 5PP m³ 111.60 1,244,888.33 138,929,537.63 0.656 111.60 0.66 100.00
5 Pek. Sloof 15x20 cm - -
Pek. Beton K-225 m³ 0.34 1,319,405.84 448,597.99 0.002 0.34 0.00 100.00
- Pek. Besi Polos 8 Ø 12 kg 47.48 18,373.38 872,368.08 0.004 47.48 0.00 100.00
- Pek. Besi Polos Ø 8 - 150 kg 27.72 18,373.38 509,310.09 0.002 27.72 0.00 100.00
- Pek. bekisting untuk sloof m² 4.17 191,266.07 797,579.51 0.004 4.17 0.00 100.00
6 Pekerjaan Sloof 20x35 cm - -
Pek. Beton K-225 m³ 4.00 1,319,405.84 5,277,623.36 0.025 4.00 0.02 100.00
- Pek. Besi Polos 8 Ø 12 kg 413.35 18,373.38 7,594,636.62 0.036 413.35 0.04 100.00
- Pek. Besi Polos Ø 8 - 150 kg 179.03 18,373.38 3,289,386.22 0.016 179.03 0.02 100.00
- Pek. Bekisting untuk sloof m² 40.00 191,266.07 7,650,642.80 0.036 40.00 0.04 100.00
7 Pekerjaan Kolom 30x30 cm - -
Pek. Beton K-225 m³ 1.59 1,319,405.84 2,097,855.29 0.010 1.59 0.01 100.00
- Pek. Besi Polos 8 Ø 12 kg 171.99 18,373.38 3,160,037.63 0.015 171.99 0.01 100.00
- Pek. Besi Polos Ø 8 - 150 kg 61.81 18,373.38 1,135,658.62 0.005 61.81 0.01 100.00
- Pek. Bekisting untuk Kolom m² 21.24 244,825.77 5,200,099.35 0.025 21.24 0.02 100.00
8 Pek. Pemasangan Besi Angkur Ø 10-300 kg 41.41 18,373.38 760,841.67 0.004 41.41 0.00 100.00
9 Pek. Plesteran 1SP : 5PP tebal 15 mm m² 127.23 67,756.55 8,620,665.86 0.041 127.23 0.04 100.00
10 Pek. acian m² 135.23 54,169.33 7,325,318.50 0.035 127.23 0.03 94.08
11 Pek. Beton K-225 m³ 12.43 1,319,405.84 16,400,214.59 0.077 12.43 0.08 100.00
12 Pek. Tulangan Wiremesh M8 kg 451.46 14,950.24 6,749,435.35 0.032 451.46 0.03 100.00
14 Pek. Lapis Resap Pengikat - Aspal Emulsi ltr 34.28 30,673.27 1,051,479.70 0.005 - - -
15 Pek. Laston Lapis Aus (AC-WC) ton 7.71 1,957,761.58 15,094,341.78 0.071 - - -
16 Pek. Railing Pipa Galvanis dia. 2" m' 57.14 431,722.75 24,668,637.94 0.117 - - -
17 Pek. Pengecatan Dinding Exterior m² 127.23 61,104.17 7,774,283.55 0.037 - - -
293,577,095.42
E.IV PEKERJAAN PENGECATAN MARKA - -
E.IV.1 PEKERJAAN PENGECATAN MARKA UJI PRAKTEK 1.59 - -
1 Pek. Pengecatan Marka Finish TFK-108 Putih (2 kali lapis) m² 89.56 330,062.86 29,560,429.74 0.140 - - -
2 Pek. Pengecatan Marka Finish TFK-108 Hijau (2 kali lapis) m² 94.89 330,062.86 31,319,664.79 0.148 - - -
3 Pek. Pengecatan Marka Finish TFK-108 Biru (2 kali lapis) m² 385.09 330,062.86 127,103,906.76 0.600 - - -
4 Pek. Pengecatan Marka Warna Putih TNK-1020 WA (3 kali lapis) m² 569.55 259,208.42 147,632,155.61 0.697 - - -
335,616,156.90
E.IV.2 PEKERJAAN PENGECATAN MARKA AREA PARKIR R2 0.10 - -
1 Pek. Pengecatan Marka Warna Putih TNK-1020 WA (3 kali lapis) m² 36.23 259,208.42 9,391,121.06 0.044 - - -
2 Pek. Pengecatan Marka Finish TFK-108 Putih (2 kali lapis) m² 36.23 330,062.86 11,958,177.42 0.056 - - -
21,349,298.47
F PEMBANGUNAN SALURAN
F.I PEKERJAAN TANAH 0.02 - 0.01
1 Pek. Galian Untuk Selokan Drainase dan Saluran Air Area Gedung m³ 23.65 43,323.13 1,024,592.02 0.005 9.36 0.00 39.58
2 Pek. Galian Untuk Selokan Drainase lingkungan Satpas m³ 68.00 43,323.13 2,945,972.84 0.014 45.20 0.01 66.47
3,970,564.86
F.II PEKERJAAN SALURAN U-DITCH 2.19 - 1.63
1 Pek. Pasang U-Ditch 30.40.120 tebal 5 m' 197.06 451,338.02 88,940,670.22 0.420 145.33 0.31 73.75
2 Pek. Pasang U-Ditch 40.50.120 tebal 6 m' 340.00 682,918.46 232,192,276.40 1.097 255.60 0.82 75.18
3 Pek. Pasang Cover U-Ditch 30.6.60 cm (40) m' 197.06 225,006.11 44,339,704.04 0.209 145.24 0.15 73.70
4 Pek. Pasang Cover U-Ditch 40.12.120 cm (52) m' 340.00 288,303.62 98,023,230.80 0.463 253.70 0.35 74.62
463,495,881.46
G PEMBANGUNAN PAGAR BRC, PAGAR KELILING DAN PAGAR DEPAN
G.I PEKERJAAN PAGAR BRC
G.I.1 PEKERJAAN TANAH 0.00 -
1 Pek. Galian Tanah m³ 0.43 32,865.11 14,132.00 0.000 - - -
2 Pek. Urugan Kembali m³ 0.14 75,013.16 10,501.84 0.000 - - -
24,633.84
G.I.2 PEKERJAAN PASANGAN 0.01 -
1 Pek. Pondasi Beton siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah m³ 0.43 1,170,988.85 503,525.21 0.002 - - -
2 Pek. Plesteran Mortar Siap Pakai ( MSP ) m² 1.78 85,569.87 152,314.37 0.001 - - -
3 Pek. Acian Mortar Siap Pakai ( MSP ) m² 1.78 53,268.29 94,817.56 0.000 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
4 Pek. Benangan m' 21.60 31,331.98 676,770.77 0.003 - - -
1,427,427.90
G.I.3 PEKERJAAN BESI 0.14 -
1 Pek. Pas Pagar BRC type 120 ( 1,2 x 2.40 ) Ø 6 mm m' 29.31 429,250.99 12,581,346.52 0.059 - - -
2 Pek. Pas Tiang pipa BRC Ø 2" tinggi = 1,40 m bh 18.00 297,308.78 5,351,558.04 0.025 - - -
3 Pek. Pas Clip bh 72.00 18,788.62 1,352,780.64 0.006 - - -
4 Pek. Pas Mur Baut bh 36.00 21,016.22 756,583.92 0.004 - - -
5 Pasang Gerbang BRC Unit 2.00 4,643,629.46 9,287,258.92 0.044 - - -
29,329,528.04

G.II PEKERJAAN PAGAR KELILING


G.II.1 PEKERJAAN TANAH 0.10 0.09
1 Pek. Galian Tanah Pondasi m³ 382.50 32,865.11 12,570,904.58 0.059 328.50 0.05 85.88
2 Pek. Urugan Kembali m³ 126.23 75,013.16 9,468,911.19 0.045 108.41 0.04 85.88
22,039,815.76
G.II.2 PEKERJAAN PASANGAN 2.90 2.27
1 Pek. Pasang Pondasi Batu Belah 1SP : 5PP m³ 191.53 1,244,888.33 238,433,461.84 1.126 163.82 0.96 85.53
2 Pek. Pasang Dinding Bata Ringan Tebal 10 cm m² 585.48 192,566.83 112,744,027.63 0.533 491.07 0.45 83.88
3 Pek. Plesteran Mortar Siap Pakai ( MSP ) m² 1,424.30 85,569.87 121,877,165.84 0.576 1,118.28 0.45 78.51
4 Pek. Acian Mortar Siap Pakai ( MSP ) m² 1,434.50 53,268.29 76,413,362.01 0.361 1,098.87 0.28 76.60
5 Pek. Benangan m' 2,040.00 31,331.98 63,917,239.20 0.302 900.00 0.13 44.12
613,385,256.52
G.II.3 PEKERJAAN BETON
1 Pekerjaan Sloof 15x10 cm (S1) 0.91 0.76
- Pek. Beton K-225 (Mollen Mix) m³ 5.10 1,319,405.84 6,728,969.78 0.032 4.26 0.03 83.53
- Pek. Besi Polos 4 Ø 12 kg 1,208.75 17,234.15 20,831,778.81 0.098 1,009.98 0.08 83.56
- Pek. Besi Polos Ø 8 - 150 kg 504.48 17,234.15 8,694,283.99 0.041 435.72 0.04 86.37
- Pek. Bekisting untuk sloof 3x pakai m² 102.16 191,266.07 19,539,741.71 0.092 85.36 0.08 83.56
2 Pekerjaan Kolom 20x20 (K1)
- Pek. Beton K-225 (Mollen Mix) m³ 10.88 1,319,405.84 14,355,135.54 0.068 9.14 0.06 84.01
- Pek. Besi Polos 4 Ø 12 kg 1,228.05 17,234.15 21,164,397.91 0.100 1,031.20 0.08 83.97
- Pek. Besi Polos Ø 8 - 150 kg 648.78 17,234.15 11,181,171.84 0.053 544.79 0.04 83.97
- Pek. Bekisting untuk kolom 3x pakai m² 136.00 244,825.77 33,296,304.72 0.157 114.52 0.13 84.21
3 Pek. Beton Bertulang Balok 10 x 15 cm m' 340.00 168,190.20 57,184,668.00 0.270 284.00 0.23 83.53
192,976,452.30
G.II.4 PEKERJAAN PENGECATAN 0.41 -
1 Pek. Pengecatan Dinding Exterior m² 1,434.50 61,104.17 87,653,931.87 0.414 - - -
87,653,931.87
G.II.5 PEKERJAAN PIPA 0.01 0.01
1 Pek. Pasang Pipa Suling-Suling PVC tipe AW dia. 2" m' 82.71 23,080.55 1,908,992.29 0.009 52.96 0.01 64.03
1,908,992.29
G.III PEKERJAAN PAGAR DEPAN
G.III.1 PEKERJAAN TANAH 0.00 0.00
1 Pek. Galian Tanah Pondasi m³ 10.90 32,865.11 358,229.70 0.002 10.90 0.00 100.00
2 Pek. Urugan Kembali m³ 3.60 75,013.16 270,047.38 0.001 - - -
628,277.08
G.III.2 PEKERJAAN PASANGAN 0.38 0.20
1 Pek. Pasang Pondasi Batu Belah 1SP : 5PP m³ 22.85 1,244,888.33 28,445,698.34 0.134 22.85 0.13 100.00
2 Pek. Pasang Dinding Bata Ringan Tebal 10 cm m³ 87.05 192,566.83 16,762,942.55 0.079 73.98 0.07 84.98
3 Pek. Plesteran Mortar Siap Pakai ( MSP ) m³ 215.13 85,569.87 18,408,646.13 0.087 - - -
4 Pek. Acian Mortar Siap Pakai ( MSP ) m³ 238.00 53,268.29 12,677,853.02 0.060 - - -
5 Pek. Benangan m' 160.10 31,331.98 5,016,250.00 0.024 - - -
81,311,390.04
G.III.3 PEKERJAAN BETON
1 Pekerjaan Sloof 15x10 cm (S1) 0.14 0.06
- Pek. Beton K-225 (Mollen Mix) m³ 1.74 1,319,405.84 2,295,766.16 0.011 1.74 0.01 100.00
- Pek. Besi Polos 4 Ø 12 kg 207.80 17,234.15 3,581,256.37 0.017 207.80 0.02 100.00
- Pek. Besi Polos Ø 8 - 150 kg 87.98 17,234.15 1,516,260.52 0.007 87.98 0.01 100.00
- Pek. Bekisting untuk sloof 3x pakai m² 23.42 191,266.07 4,479,451.36 0.021 23.42 0.02 100.00
2 Pekerjaan Kolom 20x20 (K1)
- Pek. Beton K-225 (Mollen Mix) m³ 1.55 1,319,405.84 2,045,079.05 0.010 - - -
- Pek. Besi Polos 4 Ø 12 kg 23.17 17,234.15 399,315.26 0.002 6.95 0.00 30.00
- Pek. Besi Polos Ø 8 - 150 kg 50.35 17,234.15 867,739.45 0.004 15.11 0.00 30.00
- Pek. Bekisting untuk kolom 3x pakai m² 4.30 244,825.77 1,052,750.81 0.005 - - -
3 Pek. Beton Bertulang Balok 10 x 15 cm m' 58.00 168,190.20 9,755,031.60 0.046 - - -
4 Pek. Beton Bertulang Kolom Praktis 11 x 11 cm m' 32.25 132,347.31 4,268,200.75 0.020 - - -
30,260,851.33
G.III.4 PEKERJAAN PENGECATAN 0.06 -
1 Pek. Pengecatan Dinding Exterior m² 210.77 61,104.17 12,878,925.91 0.061 - - -
12,878,925.91
G.III.5 PEKERJAAN BESI 0.22 -
1 Pek. Railing Pipa Galvanis dia. 2" m' 194.80 220,751.10 43,002,314.28 0.203 - - -
2 Pintu Besi Darurat unit 1.00 3,327,579.91 3,327,579.91 0.016 - - -
46,329,894.19
G.III.6 PEKERJAAN PENGECATAN BESI 0.03 -
1 Pekerjaan Pengecatan Dengan Meni Besi "Warna Biru" m² 22.80 234,728.98 5,351,820.74 0.025 - - -
5,351,820.74
G.III.7 PEKERJAAN PIPA 0.00 -
1 Pek. Pasang Pipa Suling-Suling PVC tipe AW dia. 2" m' 36.53 23,080.55 843,132.49 0.004 - - -
843,132.49
G.III.8 PEKERJAAN ORNAMENT 0.09 -
1 Tulisan Dari Acrilic " SATPAS POLRES METRO BEKASI KOTA'' bh 27.00 736,433.65 19,883,708.55 0.094 - - -
19,883,708.55
G.III.9 PEKERJAAN PEMASANGAN BATU ALAM 0.02 -
1 Pek. Pemasangan Batu Alam m² 8.36 566,799.14 4,738,440.81 0.022 - - -
4,738,440.81
G.III.10 PEKERJAAN GERBANG UTAMA 0.27 -
1 Pek. Pintu Gerbang unit 2.00 28,401,142.41 56,802,284.82 0.268 - - -
56,802,284.82
H PEMBANGUNAN LANDSCAPE AREA
H.I PEKERJAAN LANDSCAPE
H.I.1 PEKERJAAN TANAH 0.40 -
1 Pek. Timbunan m³ 166.32 269,097.09 44,756,228.01 0.211 - - -
2 Pek. Urugan Tanah Subur m³ 69.53 562,001.59 39,075,970.55 0.185 - - -
83,832,198.56
H.I.2 PEKERJAAN PASANGAN 0.39 - -
1 Pek. Pasang Kanstin uk. 15x30x60 cm m' 380.00 218,213.49 82,921,126.20 0.392 - - -
82,921,126.20
H.I.3 PEKERJAAN TANAMAN DAN RUMPUT 0.26 - -
1 Pek. Pasang Rumput Gajah m² 693.00 67,104.60 46,503,487.80 0.220 - - -
2 Pek. Pasang Pohon Asoka bh 15.00 191,876.45 2,878,146.75 0.014 - - -
3 Pek. Pasang Pohon Pucuk Merah bh 27.00 236,415.12 6,383,208.24 0.030 - - -
55,764,842.79
H.II PLUMBING - -
H.II.1 PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI AIR BERSIH - -
1 AREA EKSTERNAL (SIRAM TAMAN) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem, mengacu pada spektek dan gambar detail) 0.10 - -
- Pipa PVC Class AW dia 40 mm (1-1/2") m 37.00 57,378.44 2,123,002.28 0.010 - - -
- Pipa PVC Class AW dia 25 mm (1") m 323.00 35,094.64 11,335,568.72 0.054 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
- Pipa PVC Class AW dia 20 mm (3/4") m 10.00 34,180.95 341,809.50 0.002 - - -
- Gate Valve 40 mm (1 1/2") no 1.00 1,256,914.61 1,256,914.61 0.006 - - -
- Tap Point Eksternal unit 13.00 496,822.69 6,458,694.97 0.031 - - -
21,515,990.08
I PEMBANGUNAN PJU - -
I.I PEKERJAAN DUDUKAN LAMPU PJU - -
I.I.1 PEKERJAAN TANAH 0.00 - -
1 Pek. Galian Tanah m³ 2.64 32,865.11 86,763.89 0.000 - - -
86,763.89
I.I.2 PEKERJAAN BETON 0.10 - -
1 Pek. Lantai Kerja (bedding) m³ 0.38 1,112,770.99 422,852.98 0.002 - - -
2 Pek. Kolom Pedestal 40x40 cm - -
- Beton K-225 ( Mollen mix ) m³ 2.88 1,319,405.84 3,799,888.82 0.018 - - -
- Pek. Besi Ulir 4 D 13 kg 109.72 18,373.38 2,015,927.25 0.010 - - -
- Pek. Besi Polos Ø 8 - 150 kg 78.75 17,234.15 1,357,189.31 0.006 - - -
- Pek. Bekisting untuk kolom 3x pakai m² 28.80 244,825.77 7,050,982.18 0.033 - - -
3 Pek. Acian m² 4.80 54,169.33 260,012.78 0.001 - - -
4 Pek. Angkur 4 Ø 19 L= 675mm kg 54.06 115,274.05 6,231,715.14 0.029 - - -
21,138,568.46
I.I.3 PEKERJAAN ELEKTRIKAL - -
1 PEKERJAAN PENGADAAN DAN PEMASANGAN PENERANGAN JALAN UMUM (PJU) - -
(Meliputi material pendukung, alat bantu serta segala aksessoris pendukung terkait berjalannya sistem) 0.48 - -
- Lampu Penerangan Jalan Umum (PJU) Single LED 50 Watt dengan Panel Surya unit 15.00 5,068,136.16 76,022,042.40 0.359 - - -
- Lampu Sorot LED 50 watt unit 2.00 1,223,324.12 2,446,648.24 0.012 - - -
- Instalasi Penerangan PJU dengan Kabel NYYHY 3 x 2,5 mm2 + HIC 20 mm (Underground) m 474.00 46,810.03 22,187,954.22 0.105 - - -
100,656,644.86
J PEKERJAAN KANOPI LAPANGAN UJI PRAKTIK DAN PARKIR R2 - -
J.I PEKERJAAN KANOPI LAPANGAN UJI PRAKTIK - -
J.I.1 PEKERJAAN TANAH 0.00 - -
1 Pek. Galian Tanah m³ 0.64 32,865.11 21,033.67 0.000 - - -
2 Pek. Urugan Kembali m³ 0.21 75,013.16 15,752.76 0.000 - - -
36,786.43
J.I.2 PEKERJAAN BETON 0.02 - -
1 Pek. Lantai Kerja (bedding) m³ 0.06 1,112,770.99 66,766.26 0.000 - - -
2 Pekerjaan Kolom Pedestail 25x30 cm - -
- Beton K-225 ( Mollen mix ) m³ 0.64 1,319,405.84 844,419.74 0.004 - - -
- Pek. Besi Ulir 4 D 13 kg 51.85 18,373.38 952,659.75 0.004 - - -
- Pek. Besi Polos Ø 10 - 150 kg 17.09 17,234.15 294,531.62 0.001 - - -
- Pek. Bekisting untuk kolom 3x pakai m² 6.40 244,825.77 1,566,884.93 0.007 - - -
3,725,262.30
J.I.3 PEKERJAAN STRUKTUR RANGKA DAN ATAP 0.45 - -
1 Pek. Rangka Pipa Galvanis dia. 6" m' 21.00 478,337.23 10,045,081.83 0.047 - - -
2 Pek. Rangka Pipa Galvanis dia. 4" m' 62.00 424,517.80 26,320,103.60 0.124 - - -
3 Pek. Rangka Pipa Galvanis dia. 2" m' 88.00 220,751.10 19,426,096.80 0.092 - - -
4 Plat Besi Plandes Kolom t = 10 mm kg 42.88 35,599.47 1,526,505.27 0.007 - - -
5 Stiffener PL t = 8 mm (Plat Strip Badan) kg 36.00 32,235.85 1,160,490.60 0.005 - - -
6 Pek. Angkur 4 Ø 19 L= 675mm kg 24.03 115,274.05 2,770,035.42 0.013 - - -
7 Penutup Atap Galvalume t. 0,30 mm m² 107.10 309,202.37 33,115,573.83 0.156 - - -
94,363,887.35
J.I.4 PEKERJAAN PASANGAN 0.00 - -
1 Pek. Acian m² 1.60 54,169.33 86,670.93 0.000 - - -
86,670.93
J.I.5 PEKERJAAN PENGECATAN BESI 0.04 - -
1 Pekerjaan Pengecatan Dengan Meni Besi m² 37.54 234,728.98 8,811,725.91 0.042 - - -
8,811,725.91
J.II PEKERJAAN KANOPI PARKIR R2 - -
J.II.1 PEKERJAAN TANAH 0.00 - -
1 Pek. Galian Tanah m³ 0.58 32,865.11 19,061.76 0.000 - - -
2 Pek. Urugan Kembali m³ 0.19 75,013.16 14,252.50 0.000 - - -
33,314.26
J.II.2 PEKERJAAN BETON 0.01 - -
1 Pek. Lantai Kerja (bedding) m³ 0.13 1,112,770.99 144,660.23 0.001 - - -
2 Pek. Kolom Pedestal 25x25 cm - -
- Beton K-225 ( Mollen mix ) m³ 0.30 1,319,405.84 395,821.75 0.002 - - -
- Pek. Besi Ulir 4 D 13 kg 35.19 18,373.38 646,559.24 0.003 - - -
- Pek. Besi Polos Ø 10 - 150 kg 8.87 17,234.15 152,866.91 0.001 - - -
- Pek. Bekisting untuk kolom 3x pakai m² 4.40 244,825.77 1,077,233.39 0.005 - - -
2,417,141.52
J.II.3 PEKERJAAN STRUKTUR RANGKA DAN ATAP 0.21 - -
1 Pek. Rangka Pipa Galvanis dia. 3" m' 16.80 220,994.93 3,712,714.82 0.018 - - -
2 Pek. Rangka Pipa Galvanis dia. 2" m' 97.83 220,751.10 21,596,080.11 0.102 - - -
3 Plat Besi Plandes Kolom t = 10 mm kg 31.15 35,599.47 1,108,923.49 0.005 - - -
4 Stiffener PL t = 8 mm (Plat Strip Badan) kg 3.51 32,235.85 113,147.83 0.001 - - -
5 Pek. Angkur 4 Ø 19 L= 675mm kg 48.05 115,274.05 5,538,918.10 0.026 - - -
6 Penutup Atap Galvalume t. 0,30 mm m² 41.25 309,202.37 12,754,597.76 0.060 - - -
44,824,382.13
J.II.4 PEKERJAAN PASANGAN 0.00 - -
1 Pek. Acian m² 1.92 54,169.33 104,005.11 0.000 - - -
104,005.11
J.II.5 PEKERJAAN PENGECATAN BESI 0.02 - -
1 Pekerjaan Pengecatan Dengan Meni Besi "Warna Hitam" m² 15.76 234,728.98 3,699,328.72 0.017 - - -
3,699,328.72

K GAPURA SELAMAT DATANG - -


K.I PEKERJAAN STRUKTUR - -
K.I.1 PEKERJAAN TANAH 0.00 - -
1 Galian Tanah Pondasi m3 2.25 32,865.11 73,946.50 0.000 - - -
73,946.50
K.I.2 PEKERJAAN BETON - -
K.I.2.1 PEKERJAAN PONDASI 0.02 - -
1 - Pek. Beton K-225 (Mollen Mix) m3 1.13 1,319,405.84 1,490,928.60 0.007 - - -
2 Pek. Besi Ulir kg 50.01 18,373.38 918,852.73 0.004 - - -
3 Pek. Bekisting m² 6.00 185,027.69 1,110,166.14 0.005 - - -
3,519,947.47
K.I.3 PEKERJAAN KOLOM - -
K.I.3.1 Pekerjaan Kolom K1 0.02 - -
1 - Pek. Beton K-225 (Mollen Mix) m3 0.64 1,319,405.84 844,419.74 0.004 - - -
2 Pek. Besi Ulir 8 D 13 kg 33.34 18,373.38 612,568.49 0.003 - - -
3 Pek. Besi Polos kg 27.62 17,234.15 476,007.22 0.002 - - -
4 Pek. Bekisting Kolom m² 6.40 244,825.77 1,566,884.93 0.007 - - -
3,499,880.38
K.I.4 PEKERJAAN BAJA - -
K.I.4.1 Pekerjaan Kolom K1 0.20 - -
1 Kolom Baja WF 250 kg 592.00 37,857.30 22,411,521.60 0.106 - - -
2 Baja WF 200 kg 384.00 37,857.30 14,537,203.20 0.069 - - -
3 Vute kg 35.52 37,857.30 1,344,691.30 0.006 - - -
4 Baut M16 kg 4.54 61,568.58 279,521.35 0.001 - - -
5 Base plat 15 mm kg 31.50 32,444.64 1,022,006.16 0.005 - - -
6 Angkur kg 32.05 115,274.05 3,694,533.30 0.017 - - -
REALISASI PEKERJAAN
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA BOBOT PEK. (%) PRESTASI (%) CHECK LIST 30%
VOLUME BOBOT %
1 2 3 4 5 6 11 12 13 14
43,289,476.91
K.II PEKERJAAN ARSITEKTUR - -
K.II.1 PEKERJAAN PENUTUP 0.42 - -
1 Pek. Pasang Kanopi Allumunium Composite Panel ( ACP ) PVDF Type Glossy Allumunium Thickness 0,3 m² 75.60 923,792.62 69,838,722.07 0.330 - - -
2 Tulisan " SATPAS METRO BEKASI KOTA" bh 21.00 903,873.20 18,981,337.20 0.090 - - -
88,820,059.27

L PEKERJAAN TEST COMMISIONING KESELURUHAN PEKERJAAN MEEP 0.08 - -


1 Test Commisioning Keseluruhan Fungsi Sistem MEEP meliputi : MVAC, Elektrikal, Elektonik dan Plumbin ls 1.00 16,713,292.50 16,713,292.50 0.079 - - -
16,713,292.50

M PEKERJAAN JALUR E-DRIVE - -


M.1 PEKERJAAN TANAH 0.01 - -
1. Galian Tanah m³ 37.18 32,865.11 1,221,924.79 0.006 - - -
2. Urugan Kembali m³ 12.38 75,013.16 928,662.92 0.004 - - -
2,150,587.71
M.2 PEKERJAAN BETON 0.03 - -
1 Pekerjaan Bak Kontrol Mutu K-175 m³ 1.13 1,172,988.93 1,325,477.49 0.006 - - -
2 Cover Beton K-175 (Mollen Mix) m³ 0.11 1,172,988.93 129,028.78 0.001 - - -
3 Pek. Tulangan Wiremesh M8 m³ 42.57 14,950.24 636,431.72 0.003 - - -
4 - Pek. Bekisting untuk kolom 3x pakai m³ 16.50 244,825.77 4,039,625.20 0.019 - - -
6,130,563.19
M.3 PEKERJAAN INSTALASI PIPA CASING 0.21 - -
1. Pipa PVC 3" m 325.00 135,629.09 44,079,454.25 0.208 - - -
44,079,454.25

N PENYAMBUNGAN DAYA LISTRIK 0.02 - -


2 SLO 197.000 VA ls 1.00 3,302,671.26 3,302,671.26 0.016 - - -
3,302,671.26
A TOTAL 21,172,347,702.23 100.00 30.664

Bekasi, …..... …............. 2024


Dibuat oleh :
KONSULTAN PENGAWAS
PT. DEMENSI RONAKON

Ir. I MADE WARDANA


Team Leader