You are on page 1of 23

ENGINEER'S ESTIMATE (EE)

PEKERJAAN #REF!
LOKASI #REF!
TAHUN ANGGARAN #REF!

PEKERJAAN PLUMBING DAN SANITER


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KODE ANALIS VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6
A PEKERJAAN LANTAI BASEMENT
I PEKERJAAN PLUMBING
1 Pas. Pipa GIP Medium Class, lengkap dengan fitting dan support
Pas. Pipa Air Bersih Ø 1/2" Supl.BMPK.14.a 3.43 M1 307,468.50 1,054,616.96
Pas. Pipa Air Bersih Ø 1" Supl.BMPK.14.a 28.00 M1 312,419.25 8,747,739.00
Pas. Pipa Air Bersih Ø 2" Supl.BMPK.14.b 34.00 M1 346,342.50 11,775,645.00
2 Pas. Pipa Bekas limbah PVC tipe AW Ø 3" A.5.1.1.31 36.60 M1 84,059.25 3,076,568.55
3 Pas. Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.32 9.20 M1 124,553.00 1,145,887.60
4 Pas. Pipa Air Hujan PVC tipe AW Ø 4" spl. A.5.1.1.33 18.40 M1 175,703.00 3,232,935.20
5 Pas. Kloset duduk A.5.1.1.3 2.00 bh 5,254,997.00 10,509,994.00
6 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 2,118,347.00 4,236,694.00
7 Pas. Floor drain A.5.1.1.14 3.00 bh 63,442.50 190,327.50
8 Pas. Kran 1/2'' A.5.1.1.19 5.00 bh 111,663.75 558,318.75
9 Pas. Shower wc Supl. A.5.1.1.20 2.00 bh 265,663.75 531,327.50
10 Pas. Stop Kran 2'' Supl. A.5.1.1.19 2.00 bh 876,163.75 1,752,327.50
JUMLAH 46,812,381.56
B PEKERJAAN LANTAI 1
1 Pas. Pipa GIP Medium Class, lengkap dengan fitting dan support
Pas. Pipa Air Bersih Ø 3/4" Supl.BMPK.14.a 34.00 M1 309,335.50 10,517,407.00
Pas. Pipa Air Bersih Ø 1" Supl.BMPK.14.a 45.00 M1 312,419.25 14,058,866.25
Pas. Pipa Air Bersih Ø 1 1/2" Supl.BMPK.14.a 46.00 M1 334,907.00 15,405,722.00
2 Pas. Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.32 46.00 bh 124,553.00 5,729,438.00
3 Pas. Pipa Air Hujan PVC tipe AW Ø 4" spl. A.5.1.1.33 7.60 M1 175,703.00 1,335,342.80
4 Pas. Kloset duduk A.5.1.1.3 2.00 bh 5,254,997.00 10,509,994.00
5 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 2,118,347.00 4,236,694.00
6 Pas. Floor drain A.5.1.1.14 3.00 bh 63,442.50 190,327.50
7 Pas. Kran 1/2'' A.5.1.1.19 5.00 bh 111,663.75 558,318.75
8 Pas. Shower wc Supl. A.5.1.1.20 2.00 bh 265,663.75 531,327.50
9 Pas. Stop Kran 2'' Supl. A.5.1.1.19 2.00 bh 876,163.75 1,752,327.50
JUMLAH 64,825,765.30
PEKERJAAN PLUMBING DAN SANITER
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN KODE ANALIS VOLUME SAT
(Rp) (Rp)
1 2 3 4 5 6
C PEKERJAAN LANTAI 2
1 Pas. Pipa GIP Medium Class, lengkap dengan fitting dan support
Pas. Pipa Air Bersih Ø 3/4" Supl.BMPK.14.a 3.34 M1 309,335.50 1,033,180.57
Pas. Pipa Air Bersih Ø 1" Supl.BMPK.14.a 33.50 M1 312,419.25 10,466,044.88
Pas. Pipa Air Bersih Ø 1 1/2" Supl.BMPK.14.a 41.20 M1 334,907.00 13,798,168.40
2 Pas. Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.32 46.00 bh 124,553.00 5,729,438.00
3 Pas. Pipa Air Hujan PVC tipe AW Ø 4" spl. A.5.1.1.33 7.60 M1 175,703.00 1,335,342.80
4 Pas. Kloset duduk A.5.1.1.3 2.00 bh 5,254,997.00 10,509,994.00
5 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 2,118,347.00 4,236,694.00
6 Pas. Floor drain A.5.1.1.14 3.00 bh 63,442.50 190,327.50
7 Pas. Kran 1/2'' A.5.1.1.19 5.00 bh 111,663.75 558,318.75
8 Pas. Shower wc Supl. A.5.1.1.20 2.00 bh 265,663.75 531,327.50
9 Pas. Stop Kran 2'' Supl. A.5.1.1.19 2.00 bh 876,163.75 1,752,327.50
JUMLAH 50,141,163.90
D PEKERJAAN LANTAI 3
1 Pas. Pipa GIP Medium Class, lengkap dengan fitting dan support
Pas. Pipa Air Bersih Ø 3/4" Supl.BMPK.14.a 4.23 M1 309,335.50 1,308,489.17
Pas. Pipa Air Bersih Ø 1" Supl.BMPK.14.a 23.00 M1 312,419.25 7,185,642.75
Pas. Pipa Air Bersih Ø 1 1/2" Supl.BMPK.14.a 45.10 M1 334,907.00 15,104,305.70
2 Pas. Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.32 46.00 bh 124,553.00 5,729,438.00
3 Pas. Pipa Air Hujan PVC tipe AW Ø 4" spl. A.5.1.1.33 7.60 M1 175,703.00 1,335,342.80
4 Pas. Kloset duduk A.5.1.1.3 2.00 bh 5,254,997.00 10,509,994.00
5 Pas. Wastafel lengkap A.5.1.1.5 2.00 bh 2,118,347.00 4,236,694.00
6 Pas. Floor drain A.5.1.1.14 3.00 bh 63,442.50 190,327.50
7 Pas. Kran 1/2'' A.5.1.1.19 5.00 bh 111,663.75 558,318.75
8 Pas. Shower wc Supl. A.5.1.1.20 2.00 bh 265,663.75 531,327.50
9 Pas. Stop Kran 2'' Supl. A.5.1.1.19 2.00 bh 876,163.75 1,752,327.50
JUMLAH 48,442,207.67
E PEKERJAAN LANTAI 4
I PEKERJAAN PLUMBING
1 Pas. Pipa GIP Medium Class, lengkap dengan fitting dan support
Pas. Pipa Air Bersih Ø 3/4" Supl.BMPK.14.a 4.23 M1 309,335.50 1,308,489.17
Pas. Pipa Air Bersih Ø 1" Supl.BMPK.14.a 23.00 M1 312,419.25 7,185,642.75
Pas. Pipa Air Bersih Ø 1 1/2" Supl.BMPK.14.a 45.10 M1 334,907.00 15,104,305.70
1 Pas. Pipa Air Kotor PVC tipe AW Ø 4" A.5.1.1.5 46.00 bh 124,553.00 5,729,438.00
2 Pas. Pipa Air Hujan PVC tipe AW Ø 4" spl. A.5.1.1.33 7.60 M1 175,703.00 1,335,342.80
3 Pas. Kloset duduk A.5.1.1.3 2.00 bh 5,254,997.00 10,509,994.00
4 Pas. Wastafel lengkap A.5.1.1.5 1.00 bh 2,118,347.00 2,118,347.00
5 Pas. Floor drain A.5.1.1.14 2.00 bh 63,442.50 126,885.00
6 Pas. Kran 1/2'' A.5.1.1.19 2.00 bh 111,663.75 223,327.50
7 Pas. Shower wc Supl. A.5.1.1.20 1.00 bh 265,663.75 265,663.75
8 Pas. Stop Kran 2'' Supl. A.5.1.1.19 2.00 bh 876,163.75 1,752,327.50
JUMLAH 45,659,763.17
TOTAL PEKERJAAN PLUMBING 255,881,281.58
Lampiran A
Koefesien tenaga kerja dan koefesien bahan

Berikut ini koefesien tenaga kerja, koefesien bahan dan koefesien alat untuk menghitung HSP bidang Cipta Karya, yang terdiri dari
6 kelompok pekerjaan: Pekerjaan persiapan, pekerjaan, Kunci dan Kaca, pengerjaan Pengecatan, pekerjaan penutup
atap, pekerjaan sanitasi, Pekerjaan perpipaan Air Minum di luar Gedung.

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 80,000.00 60,000.000
2 Mandor L.04 OH 0.025 125,000.00 3,125.000
JUMLAH HARGA 63,125.00
B BAHAN
1 -
JUMLAH HARGA -
C PERALATAN
1 -
JUMLAH HARGA -

D Jumlah (A+B+C) 63,125.00


E Overhead & Profit ( 10% ) 10% x D 6,312.50
F Harga Satuan Pekerjaan ( D+E ) 69,437.50

A.2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.050 80,000.00 84,000.00
2 Mandor L.04 OH 0.067 125,000.00 8,375.00
JUMLAH HARGA 92,375.00
B BAHAN
1 -
JUMLAH HARGA -
C PERALATAN
1 -
JUMLAH HARGA -
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 92,375.00


E Overhead & Profit ( 0% ) 10% x D 9,237.50
F Harga Satuan Pekerjaan ( D+E ) 101,612.50

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m 3 galian di hitung dari 1/3 kali dari koefesien pekerja galian
Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.000
Mandor L.04 OH 0.050 125,000.00 6,250.000
JUMLAH HARGA 46,250.00
B BAHAN
-
JUMLAH HARGA -
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 46,250.00


E Overhead & Profit ( 10% ) 10% x D 4,625.00
F Harga Satuan Pekerjaan ( D+E ) 50,875.00

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug


Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 125,000.00 1,250.00
JUMLAH HARGA 25,250.00
B BAHAN
Pasir urugan m3 1.200 239,600.00 287,520.00
JUMLAH HARGA 287,520.00
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 312,770.00


E Overhead & Profit ( 10% ) 10% x D 31,277.00
F Harga Satuan Pekerjaan ( D+E ) 344,047.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f,c = 7,4 Mpa (K 100) = slump (3-6) cm, w/c = 0,87

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang Batu L.02 OH 0.200 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.060 125,000.00 7,500.00
JUMLAH HARGA 126,000.00
B BAHAN
Semen Portland kg 230.000 1,000.00 230,000.00
Pasir Beton M3 0.638 181,050.00 115,484.04
Kerikil (Maks 30mm) M3 0.761 225,000.00 171,166.67
Air Liter 200.000 50.00 10,000.00
JUMLAH HARGA 526,650.70
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 652,650.70


E Overhead & Profit ( 10% ) 10% x D 65,265.07
F Harga Satuan Pekerjaan ( D+E ) 717,915.77

CATATAN :
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil =1.350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.5 Membuat 1m3 beton mutu f, c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 125,000.00 10,375.00
JUMLAH HARGA 173,375.00
B BAHAN
Semen Portland kg 326.000 1,000.00 326,000.00
Pasir Beton kg 760.000 181.05 137,598.00
Kerikil (Maks 30mm) kg 1,029.000 225.00 231,525.00
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA 705,873.00
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 879,248.00


E Overhead & Profit ( 0% ) 10% x D 87,924.80
F Harga Satuan Pekerjaan ( D+E ) 967,172.80

CATATAN :
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil =1.350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.8 Membuat 1m3 beton mutu f, c=21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 125,000.00 10,375.00
JUMLAH HARGA 173,375.00
B BAHAN
Semen Portland kg 384.000 1,000.00 384,000.00
Pasir Beton M3 0.494 181.05 89.49
Kerikil (Maks 30mm) M3 0.770 225.00 173.17
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA 395,012.66
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 568,387.66


E Overhead & Profit ( 0% ) 10% x D 56,838.77
F Harga Satuan Pekerjaan ( D+E ) 625,226.42

CATATAN :
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil =1.350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir


Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Besi L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH HARGA 13,975.00
B BAHAN
Besi beton (polos/ulir) Kg 10.500 12,000.00 126,000.00
Kawat beton Kg 0.150 16,000.00 2,400.00
JUMLAH HARGA 128,400.00
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 142,375.00


E Overhead & Profit ( 10% ) 10% x D 14,237.50
F Harga Satuan Pekerjaan ( D+E ) 156,612.50
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Batu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 125,000.00 3,250.00
JUMLAH HARGA 74,100.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Paku 5 - 10 cm Kg 0.300 14,000.00 4,200.00
Minyak bekisting Liter 0.100 5,175.00 517.50
JUMLAH HARGA 64,717.50
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 138,817.50


E Overhead & Profit ( 0% ) 10% x D 13,881.75
F Harga Satuan Pekerjaan ( D+E ) 152,699.25

A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok


Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Batu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 125,000.00 4,125.00
JUMLAH HARGA 94,050.00
B BAHAN
Kayu kelas III m3 0.040 1,500,000.00 60,000.00
Paku 5 - 10 cm Kg 0.400 14,000.00 5,600.00
Minyak bekisting Liter 0.200 5,175.00 1,035.00
Balok kayu kelas III m3 0.015 1,200,000.00 18,000.00
Plywood tebal 9mm Lbr 0.350 75,000.00 26,250.00
Dolken kayu ф 8 - Batang 2.000 15,000.00 30,000.00
12 cm - panjang 4 m
JUMLAH HARGA 140,885.00
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 234,935.00


E Overhead & Profit ( 10% ) 10% x D 23,493.50
F Harga Satuan Pekerjaan ( D+E ) 258,428.50

A.4.1.1.24 Pemasangan 1 m2 bekisting lantai

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Batu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 125,000.00 4,125.00
JUMLAH HARGA 94,050.00
B BAHAN
Kayu kelas III Kg 0.040 1,500,000.00 60,000.00
Paku 5 - 12 cm Kg 0.400 14,000.00 5,600.00
Minyak bekisting Liter 0.200 5,175.00 1,035.00
Balok kayu kelas III m3 0.015 1,200,000.00 18,000.00
Plywood tebal 9mm Lbr 0.350 75,000.00 26,250.00
6.000 15,000.00 90,000.00
JUMLAH HARGA 200,885.00
C PERALATAN
-
JUMLAH HARGA -

D Jumlah (A+B+C) 294,935.00


E Overhead & Profit ( 0% ) 10% x D 29,493.50
F Harga Satuan Pekerjaan ( D+E ) 324,428.50

A.4.2.1.1 Pemasangan 1 kg besi profil


Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las konstruksi L.02 OH 0.060 100,000.00 6,000.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH HARGA TENAGA 11,925.00
B BAHAN
Besi profil Kg 1.150 12,000.00 13,800.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 25,725.00


E Overhead & Profit ( 10% ) 10% x D 2,572.50
F Harga Satuan Pekerjaan ( D+E ) 28,297.50

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP
Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH HARGA 37,125.00
B BAHAN
Bata merah m3 70.000 400.00 28,000.00
Semen portland Kg 11.500 1,000.00 11,500.00
Pasir pasang m3 0.043 252,000.00 10,836.00
JUMLAH HARGA 50,336.00
C PERALATAN
-
-
JUMLAH HARGA -

D Jumlah (A+B+C) 87,461.00


E Overhead & Profit ( 10% ) 10% x D 8,746.10
F Harga Satuan Pekerjaan ( D+E ) 96,207.10

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP:4PP tebal 15 mm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 125,000.00 1,875.00
JUMLAH HARGA 42,750.00
B BAHAN
Semen portland Kg 6.240 1,000.00 6,240.00
Pasir pasang m3 0.024 252,000.00 6,048.00
JUMLAH HARGA 12,288.00
C PERALATAN
-
-
JUMLAH HARGA -

D Jumlah (A+B+C) 55,038.00


E Overhead & Profit ( 10% ) 10% x D 5,503.80
F Harga Satuan Pekerjaan ( D+E ) 60,541.80
A.4.4.2.27 Pemasangan 1 m2 acian.
Harga Satuan Jumlah
No Uraian Kode Satuan Koefesien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.010 125,000.00 1,250.00
JUMLAH HARGA 28,500.00
B BAHAN
Semen PC Kg 3.250 1,000.00 3,250.00
JUMLAH HARGA 3,250.00
C PERALATAN
-
-
JUMLAH HARGA -

D Jumlah (A+B+C) 31,750.00


E Overhead & Profit ( 10% ) 10% x D 3,175.00
F Harga Satuan Pekerjaan ( D+E ) 34,925.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.2 Pemasangan 1 buah closet jongkok porsein
Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Batu L.02 OH 1.500 100,000.00 150,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 125,000.00 20,000.00
JUMLAH HARGA TENAGA 268,750.00
B BAHAN
Closet jongkok Unit 1.000 300,000.00 300,000.00
Semen portland Kg 6.000 1,000.00 6,000.00
Pasir pasang m3 0.010 252,000.00 2,520.00
JUMLAH HARGA BAHAN 308,520.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 577,270.00


E Overhead & Profit ( 10% ) 10% x D 57,727.00
F Harga Satuan Pekerjaan ( D+E ) 634,997.00

A.5.1.1.3 Pemasangan 1 buah closet duduk


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang Batu L.02 OH 1.500 100,000.00 150,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 125,000.00 20,000.00
JUMLAH HARGA TENAGA 268,750.00
B BAHAN
Closet duduk Unit 1.000 4,500,000.00 4,500,000.00
Semen portland Kg 6.000 1,000.00 6,000.00
Pasir pasang m3 0.010 252,000.00 2,520.00
JUMLAH HARGA BAHAN 4,508,520.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 4,777,270.00


E Overhead & Profit ( 10% ) 10% x D 477,727.00
F Harga Satuan Pekerjaan ( D+E ) 5,254,997.00

A.5.1.1.5 Pemasangan 1 buah wastafel


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang Batu L.02 OH 1.450 100,000.00 145,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.060 125,000.00 7,500.00
JUMLAH HARGA TENAGA 267,250.00
B BAHAN
Wastefel Unit 1.100 1,500,000.00 1,650,000.00
Semen portland Kg 6.000 1,000.00 6,000.00
Pasir pasang m3 0.010 252,000.00 2,520.00
Kran 1/2 Unit 1.100 175,000.00 192,500.00
JUMLAH HARGA BAHAN 1,658,520.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,925,770.00


E Overhead & Profit ( 10% ) 10% x D 192,577.00
F Harga Satuan Pekerjaan ( D+E ) 2,118,347.00
A.5.1.1.14 Pemasangan 1 buah floor drain
Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 12,675.00
B BAHAN
Floor drain Unit 1.000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,675.00


E Overhead & Profit ( 10% ) 10% x D 5,767.50
F Harga Satuan Pekerjaan ( D+E ) 63,442.50

SPL A.5.1.1.14 Pemasangan 1 buah roof drain


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 12,675.00
B BAHAN
roof drain Unit 1.000 185,000.00 185,000.00
JUMLAH HARGA BAHAN 185,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 197,675.00


E Overhead & Profit ( 10% ) 10% x D 19,767.50
F Harga Satuan Pekerjaan ( D+E ) 217,442.50
A.5.1.1.19 Pemasangan 1 buah kran diameter ½" atau ¾"
Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.400 100,000.00 40,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 46,425.00
B BAHAN
Kran air m 1.000 55,000.00 55,000.00
Sealtape Buah 0.025 3,500.00 87.50
JUMLAH HARGA BAHAN 55,087.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,512.50


E Overhead & Profit ( 10% ) 10% x D 10,151.25
F Harga Satuan Pekerjaan ( D+E ) 111,663.75

Supl. A.5.1.1.19 Pemasangan 1 buah stop kran dia.2"


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.400 100,000.00 40,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 46,425.00
B BAHAN
Stop Kran dia. 2" Buah 1.000 750,000.00 750,000.00
Sealtape Buah 0.025 3,500.00 87.50
JUMLAH HARGA BAHAN 750,087.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 796,512.50


E Overhead & Profit ( 10% ) 10% x D 79,651.25
F Harga Satuan Pekerjaan ( D+E ) 876,163.75
Supl. A.5.1.1.20 Pemasangan 1 buah Shower
Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.400 100,000.00 40,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 46,425.00
B BAHAN
Shower Buah 1.000 195,000.00 195,000.00
Sealtape Buah 0.025 3,500.00 87.50
JUMLAH HARGA BAHAN 195,087.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 241,512.50


E Overhead & Profit ( 10% ) 10% x D 24,151.25
F Harga Satuan Pekerjaan ( D+E ) 265,663.75

Supl. A.5.1.1.21 Pemasangan 1 buah Tirai Shower


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang Batu L.02 OH 0.400 100,000.00 40,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH HARGA TENAGA 46,425.00
B BAHAN
Shower Buah 1.000 150,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 196,425.00


E Overhead & Profit ( 10% ) 10% x D 19,642.50
F Harga Satuan Pekerjaan ( D+E ) 216,067.50
spl. A.5.1.1.26 Pemasangan 1 m, pipa PVC tipe AW diameter 1/2"
Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang Batu L.02 OH 0.060 100,000.00 6,000.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 125,000.00 250.00
JUMLAH HARGA TENAGA 9,880.00
B BAHAN
Pipa PVC ¾" m 1.200 4,500.00 5,400.00
Perlengkapan % 0.350 3,500.00 1,225.00
JUMLAH HARGA BAHAN 6,625.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,505.00


E Overhead & Profit ( 10% ) 10% x D 1,650.50
F Harga Satuan Pekerjaan ( D+E ) 18,155.50

A.5.1.1.27 Pemasangan 1 m, pipa PVC tipe AW diameter 1"


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang Batu L.02 OH 0.060 100,000.00 6,000.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 125,000.00 250.00
JUMLAH HARGA TENAGA 9,880.00
B BAHAN
Pipa PVC 1" m 1.200 8,250.00 9,900.00
Perlengkapan % 0.350 8,250.00 2,887.50
JUMLAH HARGA BAHAN 12,787.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,667.50


E Overhead & Profit ( 10% ) 10% x D 2,266.75
F Harga Satuan Pekerjaan ( D+E ) 24,934.25

A.5.1.1.29 Pemasangan 1 m, pipa PVC tipe AW diameter 2"


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH HARGA TENAGA 14,820.00
B BAHAN
Pipa PVC 2" M 1.200 18,750.00 22,500.00
Perlengkapan % 0.350 18,750.00 6,562.50
JUMLAH HARGA BAHAN 29,062.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,882.50


E Overhead & Profit ( 10% ) 10% x D 4,388.25
F Harga Satuan Pekerjaan ( D+E ) 48,270.75
A.5.1.1.31 Pemasangan 1 m, pipa PVC tipe AW diameter 3"

Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH HARGA TENAGA 22,167.50
B BAHAN
Pipa PVC 3" M 1.200 35,000.00 42,000.00
Perlengkapan % 0.350 35,000.00 12,250.00
JUMLAH HARGA BAHAN 54,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,417.50


E Overhead & Profit ( 10% ) 10% x D 7,641.75
F Harga Satuan Pekerjaan ( D+E ) 84,059.25

A.5.1.1.32 Pemasangan 1 m, pipa PVC tipe AW diameter 4"


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH HARGA TENAGA 22,167.50
B BAHAN
Pipa PVC 4" M 1.200 58,750.00 70,500.00
Perlengkapan % 0.350 58,750.00 20,562.50
JUMLAH HARGA BAHAN 91,062.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 113,230.00


E Overhead & Profit ( 10% ) 10% x D 11,323.00
F Harga Satuan Pekerjaan ( D+E ) 124,553.00

spl. A.5.1.1.33 Pemasangan 1 m, pipa PVC tipe AW diameter 5"


Harga Jumlah
No Uraian Kode Satuan Koefesien Satuan Harga
( Rp ) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.014 125,000.00 1,687.50
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH HARGA TENAGA 22,167.50
B BAHAN
Pipa PVC 5" M 1.200 88,750.00 106,500.00
Perlengkapan % 0.350 88,750.00 31,062.50
JUMLAH HARGA BAHAN 137,562.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,730.00


E Overhead & Profit ( 10% ) 10% x D 15,973.00
F Harga Satuan Pekerjaan ( D+E ) 175,703.00

HARGA SATUAN JUMLAH


ANALISYS URAIAN PEKERJAAN
(Rp) (Rp)
Supl.BMPK.14.a 1 M' PENGADAAN DAN PEMASANGAN
PIPA GALVANIS Dia. 1/2"
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 1/2" Bh 0.4000 4,500.00 1,800.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 1/2" btg 0.1667 55,000.00 9,168.50
Alat Bantu dan aksesoris 10,000.00 10,000.00
503,000.00 307,468.50

Supl.BMPK.14.a 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS Dia. 3/4"
Pekerja 1.455 80,000.00 116,400.00
Mandor 1.182 125,000.00 147,750.00
Tukang Pipa 0.073 100,000.00 7,300.00
Kepala Tukang 0.119 125,000.00 14,875.00
Knee "L" Diameter 3/4" Bh 0.4 5,000.00 2,000.00
Sealtape Roll 0.05 3,500.00 175.00
Pipa Galvanis Diameter 3/4" btg 0.1667 65,000.00 10,835.50
Alat Bantu dan aksesoris 10,000.00 10,000.00
513,500.00 309,335.50

Supl.BMPK.14.a 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS Dia. 1"
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 1" Bh 0.4000 7,500.00 3,000.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 1" btg 0.1667 77,500.00 12,919.25
Alat Bantu dan aksesoris 10,000.00 10,000.00
528,500.00 312,419.25

Supl.BMPK.14.a 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS Dia. 11/4"
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 11/4" Bh 0.4000 8,500.00 3,400.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 11/4" btg 0.1667 175,000.00 29,172.50
Alat Bantu dan aksesoris 10,000.00 10,000.00
627,000.00 329,072.50

Supl.BMPK.14.a 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS Dia. 1,5"
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 1,5" Bh 0.4000 8,500.00 3,400.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 1,5" btg 0.1667 210,000.00 35,007.00
Alat Bantu dan aksesoris 10,000.00 10,000.00
662,000.00 334,907.00

Supl.BMPK.14.b 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS Dia. 2"
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 2" Bh 0.4000 10,000.00 4,000.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 2" btg 0.1667 275,000.00 45,842.50
Alat Bantu dan aksesoris 10,000.00 10,000.00
728,500.00 346,342.50

Supl.BMPK.14.c 1 M' PENGADAAN DAN PEMASANGAN 1 M' PENG


PIPA GALVANIS. ( 2,5" ) PIPA GALVAN
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 2,5" Bh 0.4000 12,500.00 5,000.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 2.5" btg 0.1667 335,000.00 55,844.50
Alat Bantu dan aksesoris 10,000.00 10,000.00
791,000.00 357,344.50
Supl.BMPK.14.c 1 M' PENGADAAN DAN PEMASANGAN
PIPA GALVANIS. ( 3" )
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 3" Bh 0.4000 15,000.00 6,000.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 3" btg 0.1667 607,500.00 101,270.25
Alat Bantu dan aksesoris 10,000.00 10,000.00
1,066,000.00 403,770.25

Supl.BMPK.14.c 1 M' PENGADAAN DAN PEMASANGAN


PIPA GALVANIS. ( 4" )
Pekerja 1.4550 80,000.00 116,400.00
Mandor 1.1820 125,000.00 147,750.00
Tukang Pipa 0.0730 100,000.00 7,300.00
Kepala Tukang 0.1190 125,000.00 14,875.00
Knee "L" Diameter 4" Bh 0.4000 17,500.00 7,000.00
Sealtape Roll 0.0500 3,500.00 175.00
Pipa Galvanis Diameter 4" btg 0.1667 810,000.00 135,027.00
Alat Bantu dan aksesoris 10,000.00 10,000.00
1,271,000.00 438,527.00
HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN #REF!
LOKASI #REF!
TAHUN ANGGARAN #REF!

HARGA UPAH SATUAN Keterangan


NO JENIS UPAH
Rp. Rp.
18 Paku 5 cm - 10 cm 14,000.00 Kg
Knee "L" PVC Diameter 1/2" 4,500.00 Bh
Knee "L" PVC Diameter 3/4" 5,000.00 Bh
Knee "L" PVC Diameter 1" 7,500.00 Bh
Knee "L" PVC Diameter 11/2" 8,500.00 Bh
Knee "L" PVC Diameter 2" 10,000.00 Bh
Knee "L" PVC Diameter 2.5" 12,500.00 Bh
Knee "L" PVC Diameter 3" 15,000.00 Bh
Knee "L" PVC Diameter 4" 17,500.00 Bh
Knee "L" PVC Diameter 6" 35,000.00 Bh
19 Pipa Galvanis Diameter 1/2" 55,000.00 Bh
20 Pipa Galvanis Diameter 3/4" 65,000.00 Btg
21 Pipa Galvanis Diameter 1" 77,500.00 Btg
22 Pipa Galvanis Diameter 11/4" 175,000.00 Btg
23 Pipa Galvanis Diameter 11/2" 210,000.00 Btg
24 Pipa Galvanis Diameter 2" 275,000.00 Btg
25 Pipa Galvanis Diameter 21/2" 335,000.00 Btg
26 Pipa Galvanis Diameter 3" 607,500.00 Btg
27 Pipa Galvanis Diameter 4" 810,000.00 Btg
28 Pipa PVC tipe AW Ø 1/2" 4,500.00 C Setara Wavin
29 Pipa PVC tipe AW Ø ¾" 6,250.00 M1 Setara Wavin
30 Pipa PVC tipe AW Ø 1" 8,250.00 M1 Setara Wavin
31 Pipa PVC tipe AW Ø 2" 18,750.00 M1 Setara Wavin
32 Pipa PVC tipe AW Ø 3" 35,000.00 M1 Setara Wavin
33 Pipa PVC tipe AW Ø 4" 58,750.00 M1 Setara Wavin
34 Pipa PVC tipe AW Ø 5" 88,750.00 M1 Setara Wavin
35 Tangki Air Kap 1M3 1,450,000.00 Unit
36 Floor Drain dia. 4" stainlees steel 45,000.00 Bh
37 Kloset Jongkok 300,000.00 Bh Setara TOTO
38 Kloset Duduk 4,500,000.00 Bh Setara TOTO
39 Wastafel 1,500,000.00 Bh Lengkap
40 Urinoir 1,500,000.00 Bh Setara TOTO
41 Kran 1/2 " stailess steel 55,000.00 Bh
42 Kran 1/2 " stailess steel untuk wastafel 175,000.00 Bh
43 Stop Kran 2 " Kuningan 750,000.00 Bh
44 Shower AIR 1,950,000.00 Bh
45 Roof drain dia. 4" 185,000.00 Bh
46 Shower 195,000.00 Bh
47 Tirai Shower dan penggantung 150,000.00 Bh
48 Besi grill penutup Rangka siku 50x50x5 dan 40x40x4 450,000.00 M1
49 Pas. Tangga Besi siku 50x50x5 1,000,000.00 Unit
50 Pas. Pintu Besi t. 2.3 mm Lengkap 450,000.00 Unit
51 Minyak Bekisting 5,175.00 Ltr
52 Seal tape 3,500.00 Bh
53 Pas. IPAL limbah 65,000,000.00 Unit
NO URAIAN PANJANG
A PEKERJAAN LANTAI 1
I PEKERJAAN PLUMBING

Pas. Pipa Air Bersih PVC tipe AW Ø 3/4" 0.09


0.7

Pas. Pipa Air Bersih PVC tipe AW Ø 1" 28

Pas. Pipa Tegak PVC tipe AW Ø 2" 4.6

Pas. Pipa Bekas limbah PVC tipe AW Ø 3" 9


4.6

Pas. Pipa Bekas PVC tipe AW Ø 3" 4.5

Pas. Pipa Air Kotor PVC tipe AW Ø 4" 4.6

Pas. Pipa Air Hujan PVC tipe AW Ø 4" 4.6

Pas. Kloset jongkok


Pas. Wastafel lengkap
Pas. Floor drain
Pas. Shower
Pas. Shower Tray
Pas. Kran 1/2''
Pas. Stop Kran 2''

b PEKERJAAN LANTAI 2
I PEKERJAAN PLUMBING

Pas. Pipa Air Bersih PVC tipe AW Ø 3/4" 0.09


0.7

Pas. Pipa Air Bersih PVC tipe AW Ø 1" 38

Pas. Pipa Tegak PVC tipe AW Ø 2" 4.6

Pas. Pipa Bekas limbah PVC tipe AW Ø 3" 9

Pas. Pipa Bekas PVC tipe AW Ø 3" 1.5

Pas. Pipa Air Kotor PVC tipe AW Ø 4" 4.5


3

Pas. Pipa Air Hujan PVC tipe AW Ø 4" 4.6


20
8

Pas. Kloset jongkok


Pas. Wastafel lengkap
Pas. Floor drain
Pas. Shower
Pas. Shower Tray
Pas. Kran 1/2''
Pas. Stop Kran 2''

c PEKERJAAN LANTAI 3
I PEKERJAAN PLUMBING
Pas. Pipa Air Bersih PVC tipe AW Ø 1" 3

Pas. Pipa Tegak PVC tipe AW Ø 2" 3

Pas. Pipa Air Hujan PVC tipe AW Ø 4" 4.6


20
8
3

Pas. Kran 1/2''


Pas. Stop Kran 2''
Pas. Roof drain 4''
jumlah volume

9 0.81
2 1.4
2.21

1 28
0
0
0
28

2 9.2

1 9
6 27.6
36.6

3 13.5

1 4.6
0
4.6

4 18.4
0
0
18.4

2
2
11
1
1
8
1

15 1.35
3 2.1
3.45

1 38
0
0
0
38

0 0

3 27

6 9

6 27
2 6
33

0 0
0 0
0 0
0

2
2
11
1
1
8
1
1 3

1 3

8 36.8
2 40
1 8
2 6
90.8

4
1
12