INDUSTRIAL INSTRUMENTATION AND
CONTROL SYSTEMS
Assoc. Prof. Dr. BUI Dang Thanh
School of Electrical Engineering, Hanoi University of Science and Technology
1 Dai Co Viet road, Hà Nôi, Viêt Nam
10/13/2021 Buidangthanh.3i@gmail.com 1
Chapter 2 : II&CS Structure
10/13/2021 Buidangthanh.3i@gmail.com 2
Presentation Outline
❖ II&CS Structure Diagram
❖ Field Level
❖ Control Level
❖ SCADA level
❖ Management Level
❖ Communication
10/13/2021 Buidangthanh.3i@gmail.com 3
II&CS Structure Diagram
10/13/2021 Buidangthanh.3i@gmail.com 4
II&CS Structure Diagram
Management Level, EPR
PC+ Program
SCADA level
HIS, EWS, HS, …
Control Level
Controller, Industrial Computer,…
Field Level
Sensor, Actuator, …
10/13/2021 Buidangthanh.3i@gmail.com 5
Field Level
10/13/2021 Buidangthanh.3i@gmail.com 6
Field Level
Control Level
Field Level
10/13/2021 Buidangthanh.3i@gmail.com 7
Field Level
❑ Sensor, Transmiter, Transducer
❑ Definition
❑ Communication
10/13/2021 Buidangthanh.3i@gmail.com 8
Field Level
❑ Actuator
❑ Definition
❑ Communication
Diagram of an electric linear actuator
A simplified hydraulic system A basic pneumatic system
10/13/2021 Buidangthanh.3i@gmail.com 9
Control Level
10/13/2021 Buidangthanh.3i@gmail.com 10
Control Level
❑ PLC- Programmable Logic
Controller
❑ PS
❑ Processor
❑ Program Memory
❑ Data Memory
❑ Programming Porrt
❑ I/O
10/13/2021 Buidangthanh.3i@gmail.com 11
Control Level
❑ FCS- Field Control Station Dual CPU Cards
❑ PS Dual Power
Supplies
❑ Processor
❑ Program Memory
Dual V net
❑ Data Memory
❑ Programming Porrt
❑ I/O
Dual RIO Bus Dual Fans
10/13/2021 Buidangthanh.3i@gmail.com 12
Control Level
❑ Redundancy in the Field
Control Station
➢ Pair and spare technology
➢ Active redundancy
➢ No interruption to control
➢ Guarantees no break during CPU
changeover
➢ On-line replacement
10/13/2021 Buidangthanh.3i@gmail.com 13
SCADA Level
10/13/2021 Buidangthanh.3i@gmail.com 14
SCADA Level
❑ Human Interface Station (HIS)
✓ Operator Guide Window
✓ Process Alarm Window
✓ Process Report Window
✓ Tag Report
✓ I/O Report
10/13/2021 Buidangthanh.3i@gmail.com 15
SCADA Level
❑ Human Interface Station (HIS)
10/13/2021 Buidangthanh.3i@gmail.com 16
SCADA Level
❑ Engineering WorkStation (HIS)
10/13/2021 Buidangthanh.3i@gmail.com 17
Management/EPR Level
10/13/2021 Buidangthanh.3i@gmail.com 18
Management/EPR Level
❖ Economic management
❖ Technical management
❖ EPR
10/13/2021 Buidangthanh.3i@gmail.com 19
Communication
10/13/2021 Buidangthanh.3i@gmail.com 20
Symphony System Structure
Plant Network
Information
Composer Process Portal Process Portal Process Portal
Clients Configure Server Management
Historian Server Client
Servers and Clients
Operation Network
Composer Process Portal
Server and Process Portal
Connectivity Server and
Clients Redundant Connectivity Server and Client
Client
Control Network
Process I/O Process I/O
Symphony Symphony
Harmony Control Unit Harmony Control Unit
Communication
10/13/2021 Buidangthanh.3i@gmail.com 22
Communication
Three main reasons for redundant communications (Dual
communication):
✓ In the case of a cable break or short
✓ Constant quality checking
✓ Online configurable (adding nodes)
Thank you for your attention!
10/13/2021 Buidangthanh.3i@gmail.com 24
References
• http://en.wikipedia.org/wiki/Fieldbus
• http://www.isa.org/InTechTemplate.cfm?Section=Article_I
ndex1&template=/ContentManagement/ContentDisplay.cf
m&ContentID=60680
• http://www.us.profibus.com
• http://www.easydeltav.com/video/product/foundation_field
bus.asp
• http://www.fieldbus.org/images/stories/newsroom/newslett
er/200702/
• http://www.beckhoff.com/english.asp?embedded_pc/cx10
00_2.htm
• http://ethernet.industrial-networking.com/articles/
articledisplay.asp?id=79
10/13/2021 Buidangthanh.3i@gmail.com 25