GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
Introduction to Grid Compliance: - 27-01-2025
- Why grid compliance study?
- Various Grid codes and standards
- Studies to be performed in EMT Simulation
- Why the grid integration study needs to be
performed in EMT apart from RMS software’s
(Electromagnetic transient (EMT) vs. RMS
simulations)
PSCAD Introduction: 29-01-2025
- Why PSCAD & When PSCAD?
- PSCAD Environment
- How to create new case/project, creating new
library & loading a existing project, saving a
project & Workspace, library
- How to access the master library, selecting an
item, adding components
- How to model a network, measure the values,
plot the graph
- How to run the simulation, changing PSCAD plot
Step, Project Settings (Duration of run, Solution
time step)
Source Modelling: 31-01-2025
- Source Modelling Thevenin voltage Sources
- AC & DC Source, Single phase & Three phase AC
Source
- Balanced Source & Unbalanced Source
- Source Impedance in pu, Actual, Short Circuit
Current Source impedance in Positive Sequence,
Negative Sequence, Zero Sequence
- Three phase voltage source model 1,2,3
Load Modelling: 03-02-2025
- Load modelling and its type (Voltage dependent
Loads)
- How to model Constant Power Loads, Constant
Impedance Loads, Constant Current Loads
support@powerprojectstraining.com
+91 6369 577 904
GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
- Exponential and Polynomial Loads, Frequency
Dependent Loads
Transmission Line Modelling: 05-02-2025
- Transmission line Interface
- Transmission line Modelling
(i) PI Section
(ii) Bergeron Model
(iii) Frequency Dependent Model
- Validating the transmission line modelling
General Equipment Modelling: 07-02-2025
- How to create a module
- Shunt Reactor Modelling
- Validating Shunt Reactor modelling
- Capacitor Modelling
- How to model a Single phase and three phase
breaker
- How to create a LG, LLG or 3 phase fault at bus,
line, cable
Transformer Modelling: 10-02-2025
- Transformer Modelling
(i) Three Phase two winding transformer
(ii) Three Phase three winding transformer
- Validating transformer modelling
- Transformer modelling with and without
remanent flux
Solar PV Modelling: 12-02-2025 +
- Modelling of Generic Solar Plant
- Simple Solar Farm Model
G T
Inverter Modelling: 14-02-2025
- Generic Solar Inverter model
support@powerprojectstraining.com
+91 6369 577 904
GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
Power Quality Study: 17-02-2025
- Introduction to Harmonic Analysis
- Modelling of Inverter Spectrum
- Detailed Modelling of Solar Plant
Power Quality Study: 19-02-2025 Harmonic
Numbers
- What are the parameters to check in harmonic
analysis Magnitudes
- how to create current spectrum & Voltage
Phase Angles
Spectrum
- Modelling Fast Fourier Transform (FFT)
component
- how to plot THD & IHD
- What are the acceptable limits according to
various country gid codes and standards?
Power Quality Study: 21-02-2025
- Why DC Current Injection study?
- Why Inverter injects DC Current into the AC
network?
- Acceptable limits as per Standards/ Country Grid
Codes
- How to perform DC Current Injection study in
PSCAD?
Power Quality Study: 24-02-2025
- Impact of grid unbalance on the DC component
value
- Impact of SCR on the DC component value
- How to limit the DC current injection?
- Power Quality Case Study 300MW solar plant
Dynamic Study: 26-02-2025
- Overview of Grid Code
- LVRT & HVRT
- Voltage response
- Frequency response
- Active power ramping test
support@powerprojectstraining.com
+91 6369 577 904
GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
96.0
Equipment Modelling for Dynamic study: 28-02-
s
2025 #1 #2
- Cable and line equivalent modelling
- Transformer Scaling
User defined Model (UDM) of Inverter: 03-03-
2025
- OEM Inverter Model (Vendor Model)
- Control Parameters of Inverter
- Protection Settings of Inverter
- Validating OEM Benchmark model
SVG OEM Model: 05-03-2025
- OEM SVG Model (Vendor Model)
- Control Parameters of SVG
Power Plant Controller (PPC) Modelling: 07-03-
2025
- PPC Vendor Model
- Monitoring and Controlling parameters of PPC
- Control Modes for controlling inverter and SVG
by PPC
Fault Ride through capability test: 10-03-2025
- How to create simulation Sequence for LVRT
- LVRT (Balanced and Unbalanced fault)
- Response of Inverter and PPC during FRT test
Fault Ride through capability test: 12-03-2025
- How to create simulation Sequence for HVRT
- HVRT (Balanced and Unbalanced fault)
support@powerprojectstraining.com
+91 6369 577 904
GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
Fault Ride through capability test: 17-03-2025
- What are the parameters to check in FRT test
(Voltage, Real power, Reactive power)
- LVRT & HVRT threshold limit
- LVRT & HVRT K factor
- Parameters tuning during FRT test
Frequency Response test: 19-03-2025
- How to create simulation Sequence for frequency
response
- Response of PPC during frequency response
- With Frequency Flag Support
- Without frequency flag support
- Frequency droop and deadband
Voltage Response test: 21-03-2025
- How to create simulation Sequence for voltage
response
- Response of Plant to change in grid voltage
- Response of PPC during voltage response
- Voltage droop and deadband
Active power ramping test: 24-03-2025
- How to create simulation Sequence for Active
power ramping test
- Rate of change of power output
- Active power ramping up and ramping down
Flicker Analysis: 26-03-2025
- What is Flicker Analysis?
- How to perform flicker analysis with support of
MATLAB
- Assessment of the short-term flicker value (Pst)
and long-term flicker value (Plt)
- Acceptable limits as per Standards/ Country Grid
Codes
support@powerprojectstraining.com
+91 6369 577 904
GRID COMPLAINCE STUDY FOR RENEWABLES USING PSCAD
7.00 pm to 9.00 pm IST
Monday, Wednesday & Friday – 30 Days / 60 hours
Case Study: 28-03-2025 to 09-04-2025
- Power Quality Study for 300 MW Solar Plant
- Dynamic Study for 300 MW Solar Plant
- Dynamic Study for 526 MW Wind Plant
Q&A and Assignment Review:
support@powerprojectstraining.com