0% found this document useful (0 votes)
51 views10 pages

Mr. Raj Kumar Namdev 3 KWP Solar System

Uploaded by

aryansarkar.mail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views10 pages

Mr. Raj Kumar Namdev 3 KWP Solar System

Uploaded by

aryansarkar.mail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ZunRoof Tech PVT LTD

INDIA’S #1 Home Tech Firm

Proposal for 3 kwp ON Grid Solar System


Dear Mr. Raj Kumar Namdev,

On behalf of the entire ZunRoof staff, I’d like to take this opportunity to welcome you onboard as our
newest customer. We are delighted to have you with us and we look forward to understanding your
electricity requirement so that we can recommend the best Solar Rooftop Solution for you.

We, at ZunRoof, pride ourselves on being able to provide the highest level of customer
satisfaction by proposing a solution that ensures the highest savings in your electricity
bills.

The proposal we are sharing with you contains system details that we think would be best
suited for your energy requirements. Your estimated yearly power output, pricing of the
system, as well as the payment terms & conditions have been mentioned in this proposal
for your benefit.

Providing you with an unforgettable ZunRoof experience is our utmost priority. We want you
to represent our vision and goals as you walk with us and become a shining example of what
we have stepped out to achieve.

Please go through the proposal and provide us with any valuable feedback.

We look forward to a long relationship as you get a ZunRoof and inspire millions around
you.

Regards,

Founder & CEO,


ZunRoof Tech Pvt Ltd.
About Us

We are a Home-Tech Company, powered by a mix of Image Processing, VR, IOT and Data Analytics.
The company solves energy issues of India by using un-utilized rooftops for solar, and provides
sense and control of every appliance in one’s house.
Our design, delivery and diagnostics applications are ensuring all-time high adoption and higher
output per kW of solar in 7 years of starting up, we are already the #1 choice for Residential and
SME clients in India for solar.

● Presence across 12 States & 75+ Cities

● 180+ Employees

● INR 50 Crores Electricity Bill Saved

● 10000+ Rooftop Installations


Our Presence in India- 12 States and 75+ Cities
Why ZunRoof?

Our Methodology

Feasibility Study Financial Modelling Engineering and Design

Project Realization & Delivery Monitoring 24/7 after Sales Support


Project Details
Subject: 3 KWp ON Grid Solar Rooftop System.
Location: Bhopal
Introduction
ZunRoof has proposed an order of supply and installation of a 3 KWp ON Grid System.

Engineering and Supervision


Post acceptance of work order:
ZunRoof will ensure the Solar Rooftop System is designed to maximize the output from the sun.
ZunRoof will optimize the design of the panel's layout, height and strength of structure.
ZunRoof will supervise installation of the system to ensure execution meets the design.
System Details
Grid Type: ON Grid
Rooftop Area required ~ 360 sq ft
System Size: 3 kWp
Bill of Material (3 kWp)

Bill of Quantities Project Capacity: 3 KWp ON Grid


Sr. No Item Make Specification Quantity UoM
Solar Mono Bi Facial As per site
1 Adani/Jakson 530-540 Wp Nos
Panels requirement

2 Solar Inverter Havells/K-solar 3 Kw 01 Nos

3 Zero Export Standard As per site requirement 00 Nos


Module Mounting As per site
3 Standard GI NA
Structure requirement
As per site
4 DC Cable Polycab/Havells As per site requirement Meter
requirement
As per site
5 AC Cable Polycab/Havells As per site requirement Meter
requirement
MCCB-
Havells/ CSS
6 ACDB Zunoof 1 Nos
SPD
Type-II Phoenix/Havells
SPD- DC SPD
7 DCDB ZunRoof Type-II Phoenix 1 Nos
Contact/Havells
ZunRoof Remote
8 Remote Monitoring 1 No
Monitoring Device
Pedestal for MMS
300 X 300 X 300 (in As per
9 fixing and water Standard M -15 Ratio
mm) requirement
proofing chemical
10 Lightning arrestor Truepower or equivalent Copper 1 Nos
Havells/Schnider 32 Amps
11 4P MCCB 1 Nos
4 Pole
As per
12 Earthing Strip/Wire Polycab/Havells 6 sq mm + 6 Sqmm CU Meter
requirement
Elmex / Tyco multicontact/ As per
13 MC4 Connector IP65 Pairs
Equivalent requirement
Finolex/ Precision/
As per
14 Conduit for Cable Astral (Reputed or Meter
requirement
equivalent)
Project Costing for 3 Kwp ON Grid Solar System

Solar Project Cost INR 1,86,000

Subsidy INR 54000

Total effective Cost INR 1,86,000

● GST (13.8%) is Included over above cost.


● Structure cost is included in the above final cost.
● AC and DC Cable above 50 m are Chargeable.
● ZunRMS worth Rs 10,000 with 1 year of access to ZunRMS feature in ZunRoof app is
included in the above price.
● Net Metering Charges are excluded in the above price as per Actual.
● Feasibility Application charges (and any charges in Sanctioned Load or Name
Change charges, Name Correction Charges etc ) are not included in the above price
and will be charged in actuals.
● Any entry charges to the complex will be extra and paid as actuals.
● 5 Years of AMC is included in the above cost.

Payment Terms
1. INR 10000 at the time of order confirmation.

2. 50% after Layout approval and will deliver inverter and structure at site.

3. Remaining payment after inverter delivery and will deliver remaining materials and
will complete the site.

We will start the procurement process as soon as you confirm the order. From the time of
confirmation, till 7 days of order confirmation, there will be a nominal cancellation charge of INR
25,000 or 5% of system cost, whichever is higher. Any cancellation after that will be subject to our
liabilities. We will commission the system within 90 working days of receiving 100 percent of the
total system cost, subject to adherence of payment terms.
Installation Steps:
● Installation of Structure on Roof with Panels.
● Inverter will be installed on the roof.
● Earthing will be installed in the ground inside (or outside) the premises. Client will help in
determine an appropriate location for the same.
● Earthing strip/wire will connect to the panels on roof top through conduit.
● A lightning arrestor will also be installed on the roof.

Documents Required
● Electricity Bills
● PAN Card
● Aadhaar Card
● Photographs-2
● Property Documents (To show proof of roof rights)
Payment Options
You can choose to make your payment via the following payment methods:

*If the project is canceled then nominal cancellation charges will be applicable based on the liabilities incurred by ZunRoof

You might also like