TIME (in weeks)
S
ACTIVITY
no. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1. Introduction of SRM ▼▲ A,B,C,D
2. Components of SRM ▼▲ A,B,C,D
3. Working Principle ▼ ▲ A,B,C,D
4. Block Diagram ▼▲ A,B,C,D
5. Components Rating ▼ ▲ A
6. Approximate Costing ▼▲ A
7. Design of SRM on page ▼ ▲ A,B
8. ▼ ▲ A
Identifying the motor
9. Meeting with project ▼▲ A,B
guide
10. Cancellation of idea ▼▲ A,B
11. Conveyor belt principle ▼ ▲ A
12. Dimension of plates ▼▲ A,B,C,D
13. Meeting for Conveyor ▼ ▲ A,B,C,D
final belt
14. Application for ▼▲ A,B,C
Mechanical department
15. Cutting of L shaped rods ▼▲ A,B,C
16. Welding of L shaped rods ▼ ▲ A,B,C,D
17. Setting ceramic fibres on ▼▲ A,B,C
stand
18. Registering Project for ▼▲ A,B,C,D
MSME
19. Iron plates Searching ▼ ▲ A,B
20. Conveyor belt searching ▼ ▲ A
(structure)
21. Dimensions of gears and ▼ ▲ A,C
shafts
22. Getting shafts and ▼ ▲ A,B,C
bearings fixed
23. Chain length increment ▼▲ A,B,C
24. Microcontroller coding ▼▲ A
25. Problems in structure ▼▲ A
(shaft bending)
26. Comparison between belt ▼ ▲ A,B,C
and chain
27. Testing every element ▼▲ A,B,C,D
individually
28. Rough connection layout ▼▲ A
29. Designing PCB ▼▲ A
30. PCB design error and ▼ ▲ A,B,C,D
refabrication
31. Drilling and soldering ▼ ▲ A,B,C,D
components
32. Troubleshooting IC7805 ▼ ▲ A,B,C
overheating
33. PCB testing of LCD ▼ ▲ A,B,C
display for temp
34. Motor change (DC ▼ A,B,C
stepper)
Symbols to be used for marking beginning and completion of activities
Scheduled beginning of the activity ∆ Scheduled completion of the activity
Re-scheduled beginning of the activity □ Re-scheduled completion of the activity
▼or ■ Actual beginning of the activity ▲or ■ Actual completion of the activity
A Deepanshu Khandelwal B Diya Sharma
C Abhishek Kumar D Dishika Sharma
Name & Signature of team leader Name & Signature of Guide
Deepanshu Khandelwal Dr. Pallav Rawal