Request For Inspection (RFI)
PROJECT : EPCC-03 PACKAGE FOR PETROCHEMICAL AND LUBE INTEGRATION PROJECTS "LUPECH" J18 IOCL GUJARAT
CLIENT : IOCL GUJARAT REFINERY
PMC : TECHNIP ENERGIES Format No. : MEIL/EPCC-03/G-001
LSTK CONTRACTOR: MEGHA ENGINEERING AND INFRASTURCTURE LIMITED Rev-02
To : TECHNIP ENERGIES/IOCL REPORT NO: MEIL/EPCC-03/RFI/STR-2163
Attention: STR DATE : 1-Mar-25
From: MEIL LOCATION: 30 ACRE,PPU
By: MEIL
PO NO: RHQ/PJ/LUPECH(J18)/2021-22/EPCC-3/FOA-6 Contractor Reference :
FOLLOWING ACTIVITIES ARE READY FOR INSPECTION : [ ] Whole order [ ] Part [ ] Balance
REFERENCE ITP Number with S.No / CONTACT
S.No. DESCRIPTION/ITEM/PART NO QTY DATE&TIME REMARKS
Document PERSON
Surface preparation and application of primer coat on 03-03-2025
1
structural steel (Paint system:4 coat and 2 coat system) Time -04:40 PM
DFT and visual inspection of primer coat on structural 03-03-2025
2
steel(Paint system:4coat system and 2 coat system) Time -03:30 PM
DFT and visual inspection of intermediate coat on 077154C-27368587-1807-CON-QCP-017 SURAJ MALL
03-03-2025
3 structural steel
Time -03:00 PM
03-03-2025
4 DFT and visual inspection of Top coat -1 on structural steel
Time -04:00 PM
DFT and visual inspection of Final coat on structural steel 2 03-03-2025
5
coat & 4 coat paint system) Time -04:30 PM
REMARKS
MEIL
TPIA PMC/OWNER
INITIATED BY CHECKED BY
Signature :
Name : MANU PATEL
Date : 1-Mar-25