AL MAWAKAB NATIONAL TRADING &

Report No: MNT/QC/BP-001


CONSTRUCTION COMPANY LLC
P.O Box No: 2637, P.C. 130, Muscat, Sultanate of Oman Date:

Tel : (+968) 2412 1257, Fax : 2412 7419 , Email : info@mntoman.com AREA/JOB NO: PHASE 1

INSPECTION REPORT FOR SURFACE PREPARATION AND PAINTING


CLIENT NAME: CHINA PETROLEUM PIPELINE PROJECT: LIGHT GAUGE STRUCTURE OF FIRE STATION, WORKSHOP AND STORE BUILDING, OFFICE HALL BUILDING AND
ENGINEERING COMPANY LTD PRAYER HALL BUILDING

PO NO/DATE:

Procedure Ref: Item : Structural

Before Mid
COATING SYSTEM : Before Blasting Before Primer Before Top Coat
Coat

SURFACE PREPARATION : SA 2.5 Dry Bulb Temperature

SURFACE PROFILE : wet Bulp Temperature

ABRASVE SIZE : Depression

ABRASVE TYPE : Dew point Temperature

BLASTING DATE : RH% Max 85%

PAINTING COAT 1 DATE : Steel Temperture

PAINTING COAT 2 DATE :

PAINTING COAT 3 DATE :

DESCRIPTION
DFT REQ ACTUAL DFT
PAINT DETAIL BATCH NO REMARKS
(microns) (microns)

PRIMER COAT

MID COAT

TOP COAT

Total DFT

Prepared By: Approved by: CLIENT/TPIA

MNT QA/QC MNT QA/QC