DAILY PAINT INSPECTION REPORT

APPLICATION OF COATINGS

Facility Name/Location: ____________________________________________________________________


Item Name: __________________________________ Purchaser/Location:___________________________
Tag Number:__________________________________ Purchase Order/ Job Number: __________________
Instructions:
This form shall be completed for each work shift to verify compliance with Sharp Iron Group Coating Procedures.
Attach copies of all replica tape and/or readings taken.
Attach additional sheets, notes of meetings, or reports as necessary for backup.
Submit a copy of all forms and back-up documents to the purchaser's inspector(s).
Report Date:
Start of Start of Midpoint of End of
Condition Blasting Painting Painting Painting
Time
Ambient Temperature
Relative Humidity
Dew Temperature
Substrate Temperature
Weather Conditions
Surface Preparation:
Condition of Surface Before Blasting:
Method of Removing Contamination Before Blasting:
Method of Blasting: Abrasive Type: Grade:
Degree of Cleanliness Obtained:
Anchor Profile: Method of Measuring Anchor Profile:
Application Information:
Method of Spraying:
DFT Gage Type and Model: Date Calibrated/Verified:

Actual
Lining Thinner DFT DFT Overcoat
Linings Applied Batch No. Lining Color Used Specified Obtained Interval
Coat 1
Coat 2
Coat 3
Comments:

SIG Form 500.1, Rev B


Supplier's Signature: ________________________________________________
Inspectors Signature: ________________________________________________

SIG Form 500.1, Rev B