Guard House Construction Overview

The document outlines the construction process for a guard house, detailing phases such as foundation work, building structure, and internal and external installations. It includes a breakdown of tasks, their duration, and associated costs, totaling $348,108.66. Additionally, it provides a timeline for each phase, starting from site preparation to final interior work.

Uploaded by

Elamparo Monica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views52 pages

Guard House Construction Overview

The document outlines the construction process for a guard house, detailing phases such as foundation work, building structure, and internal and external installations. It includes a breakdown of tasks, their duration, and associated costs, totaling $348,108.66. Additionally, it provides a timeline for each phase, starting from site preparation to final interior work.

Uploaded by

Elamparo Monica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

GUARD H

Foundation Work Building Structure

Clear site Prepare formwork


Site Preparation Place reinforcement
Excavate Column Construction
bars
Pourin formwork
concrete for
Grade and level site
Curingcolumns
and setting of
Prepare formwork
columns
Install reinforcements Prepare formwork
Pour concrete Place reinforcement bars
Foundation Construction
slab/foundation
Curing and setting of Beam Construction in formwork
Pour concrete for beams
foundation Curing and setting of
Foundation Inspection
Erectbeams
walls and
Structural Framing framework
Roof trusses and
supports
Prepare opening
Install
Install the
the frame
door,
Door and Window
windows, and
Installation
hardware
Weatherproof and seal
Add security features
if needed
GUARD HOUSE

Internal External Interior Work


Install roof covering
Power supply line installation Roof Installation Flooring and Finishes
Electrical Wiring (shingles)
Clean and prepare
Lighting and outlets setup Apply primer to exterior
exterior walls
Install waterline walls
Plumbing Setup Apply first coat of
Install drainage systems Exterior Walls Interior Walls
waterproof
Apply secondpaint
coat of
Install bathroom fixtures
waterproof
Drying paintof
and setting
Security Systems Install CCTV Systems
paint
Installation Install Alarm Systems Furniture and Fixtures
Install Intercom /
Communication Systems
Interior Work

Install flooring (concrete)


Clean and prepare interior
walls
Apply primer to interior walls
Apply first coat of acrylic paint
Apply second paint of acrylic
paint
Drying and setting of paint
Install security desk and
seating
Breakdown of Work for Proposed Guard House

Foundation Work Building Structure Internal External Interior Work

Site Preparation Column Construction Electrical Wiring Roof Installation Flooring and Finishes

Power supply line Install flooring


Clear site Prepare formwork Install roof covering
installation (concrete)
Place reinforcement Lighting and outlets
Excavate Exterior Walls Interior Walls
bars in formwork setup

Pour concrete for Clean and prepare Clean and prepare


Grade and level site Plumbing Setup
columns exterior walls interior walls

Curing and setting of Apply primer to Apply primer to


Foundation Construction Install waterline
columns exterior walls interior walls

Install Install drainage Apply first coat of Apply first coat of


Beam Construction
reinforcements systems waterproof paint acrylic paint

Pour concrete Apply second paint of Apply second paint of


Prepare formwork Security Systems Installation
slab/foundation acrylic paint acrylic paint

Curing and setting Place reinforcement Install bathroom Drying and setting of Drying and setting of
of foundation bars in formwork fixtures paint paint

Foundation Pour concrete for


Install CCTV Systems Furniture and Fixtures
Inspection beams

Curing and setting of Install security desk


Install Alarm Systems
beams and seating

Install Intercom /
Structural Framing Communication
Systems

Erect walls and


framework

Roof trusses and


supports

Door and Window Installation

Prepare opening

Install the frame

Install the doors,


windows, and
hardware

Weatherproof and seal

Add security features


if needed
CONCURRENT
Phase Baseline Cost
Site Preparation 131451.54
Column Construction 9120
Beam Construction 15200
Structural Framing 2,366.40
Door and Window Installation 47336.53
Plumbing Setup 13935
Electrical Wiring, Security System Installation 17,115.00
Roof Installation 46525
Exterior Walls/ Interior walls 46,170.44
Flooring, Ceiling, and Finishes 18,888.75
TOTAL 348108.66

IN SUCCESSION
Phase Baseline Cost
Site Preparation 131451.54
Column Construction 9120
Beam Construction 15200
Structural Framing 2,366.40
Door and Window Installation 47336.53
Plumbing Setup 13935
Electrical Wiring, Security System Installation 17,115.00
Roof Installation 46525
Exterior Walls/ Interior walls 46,170.44
Flooring, Ceiling, and Finishes 18,888.75
TOTAL 348108.66

Cost Distribution (Concurrent)


100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
WEEK 1 WEEK 2 WEEK 3 WEEK 4
30.00%
20.00%
10.00%
0.00%
WEEK 1 WEEK 2 WEEK 3 WEEK 4
% Weight Start End Duration WEEK 1
37.76% WEEK 1 WEEK 2 2 18.88%
2.62% WEEK 2 WEEK 2 1
4.37% WEEK 2 WEEK 3 2
0.68% WEEK 3 WEEK 3 1
13.60% WEEK 3 WEEK 3 1
4.00% WEEK 3 WEEK 3 1
4.92% WEEK 4 WEEK 4 1
13.37% WEEK 3 WEEK 3 1
13.26% WEEK 3 WEEK 5 3
5.43% WEEK 4 WEEK 4 1
%COMPLETE 18.88%
CUMULATIVE% 18.88%

% Weight Start End Duration WEEK 1


37.76% WEEK 1 WEEK 2 2 18.88%
2.62% WEEK 2 WEEK 2 1
4.37% WEEK 2 WEEK 3 2
0.68% WEEK 3 WEEK 3 1
13.60% WEEK 3 WEEK 3 1
4.00% WEEK 3 WEEK 3 1
4.92% WEEK 4 WEEK 4 1
13.37% WEEK 3 WEEK 3 1
13.26% WEEK 3 WEEK 5 3
5.43% WEEK 4 WEEK 4 1
%COMPLETE 18.88%
CUMULATIVE% 18.88%

tion (Concurrent) Cost Distribution (Without C


100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
WEEK 3 WEEK 4 WEEK 5 WEEK 1 WEEK 2 WEEK 3
30.00%
20.00%
10.00%
0.00%
WEEK 3 WEEK 4 WEEK 5 WEEK 1 WEEK 2 WEEK 3
WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6
18.88%
2.62%
2.18% 2.18%
0.68%
13.60%
4.00%
4.92%
13.37%
4.42% 4.42% 4.42%
5.43%
23.68% 38.25% 14.76% 4.42% 100.00%
42.56% 80.82% 95.58% 100.00%

WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6


18.88%
2.62%
2.18% 2.18%
0.68%
13.60%
4.00%
4.92%
13.37%
4.42% 4.42% 4.42%
5.43%
23.68% 38.25% 14.76% 4.42% 100.00%
42.56% 80.82% 95.58% 100.00%

Distribution (Without Concurrent)

WEEK 2 WEEK 3 WEEK 4 WEEK 5


WEEK 2 WEEK 3 WEEK 4 WEEK 5
Start date End date
SITE PREPARATION

Clear site 1/31/25 2/1/25


Excavate 2/2/25 2/3/25
Grade and level site 2/4/25 2/5/25

SITE PREPARATION
Prepare formwork 2/6/25 2/6/25
Install reinforcements 2/7/25 2/7/25
Pour concrete slab/foundation 2/8/25 2/8/25
Curing and setting of foundation 2/9/25 2/11/25
Foundation Inspection 2/12/25 2/12/25

COLUMN CONSTRUCTION
Prepare formwork 2/12/25 2/12/25
Place reinforcement bars in formwork 2/13/25 2/13/25
Pour concrete for columns 2/14/25 2/14/25
Curing and setting of columns 2/15/25 2/17/25

BEAM CONSTRUCTION
Prepare formwork 2/17/25 2/17/25
Place reinforcement bars in formwork 2/18/25 2/18/25
Pour concrete for columns 2/19/25 2/19/25
Curing and setting of columns 2/20/25 2/22/25

STRUCTURAL FRAMING
Erect walls and framework 2/22/25 2/23/25
Roof trusses and supports 2/24/25 2/25/25

DOOR AND WINDOW INSTALLATION


Prepare opening 2/26/25 2/26/25
Install the frame 2/26/25 2/26/25
Install the door, windows, and hardware 2/26/25 2/26/25
Weatherproof and seal 2/26/25 2/26/25
Add security features if needed 2/26/25 2/26/25

ELECTRICAL WIRING
Power supply line installation 2/25/25 2/25/25
Lighting and outlets setup 2/26/25 2/26/25

SECURITY SYSTEM INSTALLATION


Install bathroom fixtures 3/1/25 3/1/25
Install CCTV Systems 3/1/25 3/1/25
Install Alarm Systems 3/1/25 3/1/25
Install Intercom / Communication Systems 3/1/25 3/1/25

PLUMBING SETUP
Install waterline 2/27/25 2/27/25
Install drainage systems 2/28/25 2/28/25

ROOF INSTALLATION
Install roof covering (shingles) 2/25/25 2/25/25

EXTERIOR WALLS
Clean and prepare exterior walls 2/24/25 2/24/25
Apply primer to exterior walls 2/24/25 2/24/25
Apply first coat of waterproof paint 2/25/25 2/25/25
Apply second coat of waterproof paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25

FLOORING AND FINISHES


Install flooring (concrete) 2/23/25 2/23/25

INTERIOR WALLS
Clean and prepare interior walls 2/24/25 2/24/25
Apply primer to interior walls 2/24/25 2/24/25
Apply first coat of acrylic paint 2/25/25 2/25/25
Apply second paint of acrylic paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25

FURNITURE AND FIXTURES


Install security desk and seating 3/1/25 3/1/25
No. weeks Assigned Status
DATE 1 2 3 4 5 6 7 8
DAYS 1 2 3 4 5 6 7 8

Carl Open
Carl Open
Carl Open
2
Monica Open
Monica Open
Monica Open
Monica Open
Monica Open

Saire Open
2 Saire Open
Saire Open
Saire Open

Angeline Open
Angeline Open
Angeline Open
2 Angeline Open

Carl Open
1 Carl Open

Monica Open
Monica Open
Monica Open
Monica Open
1 Monica Open

Saire Open
1
1 Saire Open

Carl Open
Carl Open
Carl Open
1 Carl Open

Angeline Open
1 Angeline Open

1 Monica Open

Saire Open
Saire Open
Saire Open
Saire Open
3 Saire Open

1 Angeline Open

Carl Open
Carl Open
Carl Open
Carl Open
3 Carl Open

1 Saire Open
FEBRAURY 2025

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
MARCH 2025 .

27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
RCH 2025 .

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
APRIL 2025 .

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
Start date End date

SITE PREPARATION
Clear site 1/31/25 2/1/25
Excavate 2/2/25 2/3/25
Grade and level site 2/4/25 2/5/25

SITE PREPARATION
Prepare formwork 2/6/25 2/6/25
Install reinforcements 2/7/25 2/7/25
Pour concrete slab/foundation 2/8/25 2/8/25
Curing and setting of foundation 2/9/25 2/11/25
Foundation Inspection 2/12/25 2/12/25

COLUMN CONSTRUCTION
Prepare formwork 2/12/25 2/12/25
Place reinforcement bars in formwork 2/13/25 2/13/25
Pour concrete for columns 2/14/25 2/14/25
Curing and setting of columns 2/15/25 2/17/25

BEAM CONSTRUCTION
Prepare formwork 2/17/25 2/17/25
Place reinforcement bars in formwork 2/18/25 2/18/25
Pour concrete for columns 2/19/25 2/19/25
Curing and setting of columns 2/20/25 2/22/25

STRUCTURAL FRAMING
Erect walls and framework 2/22/25 2/23/25
Roof trusses and supports 2/24/25 2/25/25

FLOORING AND FINISHES


Install flooring (concrete) 2/23/25 2/23/25

EXTERIOR WALLS
Clean and prepare exterior walls 2/24/25 2/24/25
Apply primer to exterior walls 2/24/25 2/24/25
Apply first coat of waterproof paint 2/25/25 2/25/25
Apply second coat of waterproof paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25

INTERIOR WALLS
Clean and prepare interior walls 2/24/25 2/24/25
Apply primer to interior walls 2/24/25 2/24/25
Apply first coat of acrylic paint 2/25/25 2/25/25
Apply second paint of acrylic paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25

ROOF INSTALLATION
Install roof covering (shingles) 2/25/25 2/25/25

ELECTRICAL WIRING
Power supply line installation 2/25/25 2/25/25
Lighting and outlets setup 2/26/25 2/26/25

DOOR AND WINDOW INSTALLATION


Prepare opening 2/26/25 2/26/25
Install the frame 2/26/25 2/26/25
Install the door, windows, and hardware 2/26/25 2/26/25
Weatherproof and seal 2/26/25 2/26/25
Add security features if needed 2/26/25 2/26/25

PLUMBING SETUP
Install waterline 2/27/25 2/27/25
Install drainage systems 2/28/25 2/28/25

SECURITY SYSTEM INSTALLATION


Install bathroom fixtures 3/1/25 3/1/25
Install CCTV Systems 3/1/25 3/1/25
Install Alarm Systems 3/1/25 3/1/25
Install Intercom / Communication Systems 3/1/25 3/1/25

FURNITURE AND FIXTURES


Install security desk and seating 3/1/25 3/1/25
DATE 1 2 3 4 5 6 7 8
DAYS 1 2 3 4 5 6 7 8

2/1/25

2/2/25

2/3/25

2/4/25

2/5/25

2/6/25

2/7/25

2/8/25
Assigned Status

Carl Open
Carl Open
Carl Open

Monica Open
Monica Open
Monica Open
Monica Open
Monica Open

Saire Open
Saire Open
Saire Open
Saire Open

Angeline Open
Angeline Open
Angeline Open
Angeline Open

Carl Open
Carl Open

Angeline Open

Saire Open
Saire Open
Saire Open
Saire Open
Saire Open

Carl Open
Carl Open
Carl Open
Carl Open
Carl Open

Monica Open

Saire Open
Saire Open

Monica Open
Monica Open
Monica Open
Monica Open
Monica Open

Angeline Open
Angeline Open

Carl Open
Carl Open
Carl Open
Carl Open

Saire Open
9
9
2/9/25

10
10
2/10/25

11
11
2/11/25

12
12
2/12/25

13
13
2/13/25

14
14
2/14/25
FEBRAURY 2025

15
15

2/15/25
16
16

2/16/25
17
17

2/17/25
18
18

2/18/25
19
19

2/19/25
20
20

2/20/25
21
21

2/21/25
22
22

2/22/25
23
23

2/23/25
24
24

2/24/25
25
25

2/25/25
26
26

2/26/25
27
27
2/27/25

28
28
2/28/25

1
29
3/1/25

2
30
3/2/25

3
31
3/3/25
4
3/4/25 32
5
33

3/5/25
6
34

3/6/25
7
35

3/7/25
8
36

3/8/25
9
37

3/9/25
38
10

3/10/25
39
11

3/11/25
40
12

3/12/25
41
13

3/13/25
42
14

3/14/25
43
15

3/15/25
44
16

3/16/25
MARCH 2025 .
RCH 2025 .

45
17
3/17/25

46
18
3/18/25

47
19
3/19/25

48
20
3/20/25

49
21
3/21/25

50
22
3/22/25 51
23

3/23/25
52
24

3/24/25
53
25

3/25/25
54
26

3/26/25
55
27

3/27/25
56
28

3/28/25
57
29

3/29/25
58
30

3/30/25

3/31/25

4/1/25

4/2/25

4/3/25
4/4/25

4/5/25

4/6/25

4/7/25
MEMBERS:
Elamparo, Monica
Lasola, Maria Saire
Quitan, Carl John
Tulod, Angeline

PROJECT : PROPOSED GUARD HOUSE

Date : June 28, 2024

SUBJECT : BREAKDOWN OF COST ESTIMATES

FLOOR.AREAS : Ground Floor


Total Lot Area

ITEM ITEM PARTICULARS


NO.
III EARTHWORKS
Manual excavation
Manual Backfill/Compaction
Gravel bedding G-1
Soil poisoning
Dampproofing (3 mil.thk.)
Soil Field Density Testing
Others
SUB-TOTAL
IV CONCRETE WORKS
Column footing
C1-F1
Cement
Sand
Gravel
TOTAL COLUMN FOOTING
Beams
Cement
Sand
Gravel
TOTAL OF BEAMS
SUB-TOTAL
V REBARS
10mm. dia. grade 33
Vertical Reinforcement
Horizontal Reinforcement
12mm. dia. grade 33
Vertical Reinforcement
Horizontal Reinforcement
#16 g.i. tie wires
Testing of Samples
Others
SUB-TOTAL
VI FORMWORKS and SCAFFOLDINGS
Form oil plywood
Form lumber
Scaffoldings
Assorted C.W.Nails
Others

SUB-TOTAL

VII MASONRY WORKS


6" Thick CHB (Non-load bearing) w/ Cement mortars @ cells & join
4" Thick CHB (Non-load bearing) w/ Cement mortars @ cells & join
10 mm dia. rebars grade 33
Vertical Reinforcement
Horizontal Reinforcement
12 mm dia. rebars grade 33
Vertical Reinforcement
Horizontal Reinforcement
#16 g.i. tie wire

Cement
Sand
Testing of CHB Samples
Others
SUB-TOTAL
VIII PLASTER WORKS
Cement Plaster 16mm.thk. (class B) 2 Face
Cement
Sand
Others
SUB-TOTAL

X CARPENTRY WORKS
9mm thk Marine -grade Plywood Ceiling (at T&Bs)
Fascia 305mmx12 mm thk HardieFlex Senepa
2 in x 2in 14 ft Coco Lumber (for ceiling joists)
Others
SUB-TOTAL

XII SASH WORK/ MILLWORK


DOORS (complete with finishing and hardwares)
Door D-1 Solid Wood Swing
Door D-2 Solid Wood Swing
Door D-3 PVC Accordion
DOOR JAMBS (2x4)
Door DJ-1
Door DJ-2
Door DJ-3
WINDOWS (complete with finishing and hardwares)
6mm.thick Clear Tempered Glass on Powder Coated Aluminum Frame
a. W-1 (1.2 x 0.75) Fixed window
b. W-2 (1.2 x 0.7) Sliding window
6mm.thick Clear Tempered Glass on Powder Coated Aluminum Frame
a. W-3 (0.3 x 0.6)) Sliding window
Others
SUB-TOTAL
XIII FLOOR / WALL / CEILING FINISHES
600x600mm/ Glazed Ceramic White Tiles w/ grout
ABC Tile Grout Joint Filler
Tile Cement Adhesives "ABC"
Others
SUB-TOTAL

XIV TINSMITHRY
Grey Stone Roof Tiles
Roof Insulation (Heat Insulation Blanket)
Silicon sealant
Gutter
Others
SUB-TOTAL
XV WATERPROOFING
A-Plus® Concrete Bond Cementitious Waterproofing @ 2/F Toilets (5 coats)
A-Plus All Weather® 2081 Topcoat Clear Elastomeric Paint
Others
SUB-TOTAL
XVI PAINTING WORKS
Davies Megacryl Concrete Primer & Sealer
Exterior Davies Megacryl Flat 500 White acrylic latex paint - semi gloss finish
Interior Davies Megacryl Flat 500 White acrylic latex paint - semi gloss finish
Others
SUB-TOTAL
XVII SANITARY AND PLUMBING WORKS
Roughing-in Sewer & Vent System (PVC - Neltex/ FD - Eurobrass)
PLUMBING FIXTURES & FITTINGS (complete with accessories)
Water Closet 'Karat' Elongated Front (for Common Toilet)
Lavatory-"Karat" K-1230 Wall Hung
Lav.Faucet OFM
Bidet spray w/ S/S valve & acc.
Others
SUB-TOTAL
XVIII ELECTRICAL WORKS
SERVICE ENTRANCE (including energization)
ROUGHING-IN
ELECTRICAL WIRES / CABLES (Phelp Dodge)
WIRING DEVICES (National Wide Series)
Single Switch complete with plate and cover
Weatherproof Security light with motion detector ner Supplied Material
Others
SUB-TOTAL
SUB-TOTAL

TOTAL MATERIAL COST


TOTAL LABOR COST (VAT inclusive)
DIRECT COST (VAT Inclusive)

CONTINGENCIES
PROFIT
SUB TOTAL

PERFORMANCE BOND
SUB TOTAL

GRAND TOTAL

COST PER SQ.M.


CONSTRUCTION TIMETABLE
32.92 s.m
32.92 s.m.

QTY UNIT MATERIALCOST

33.52 c.m. 0
69.81 c.m. 0
30 c.m. 437
41.92 s.m. 69
32.92 s.m.
1 lot

176.69 40 kg/bags 254


9.82 cu.m. 700
19.63 cu.m. 500
24 cu.m.

46 40 kg/bags 254
0.38 cu.m. 700
0.57 cu.m. 500
40 cu.m.

8 0.616 kg/m 20
12 pcs. 20
8 0.888 kg/m 20
12 pcs. 20
10 kgs. 50
1 l.s. 0

4 sheets 1,200.00
12 pcs. 14
8 frames 1,734.33
2 packs 50

10 s.m. 305
1 s.m. 187.45

10 s.m. 27.6
10 s.m. 27.6

10 s.m. 27.6
10 s.m. 27.6
10 kgs. 50

10 s.m. 192
10 s.m. 192
1 lot

10 m 95
10 m 95

6 s.m. 600
46 boards 424
8 pcs. 30
1 set 4,990.00
1 set 4,990.00
1 set 5,619.00

1 set 1,400.00
1 set 1,400.00
1 set 1,400.00

2 sets 1,015.20
2 sets 4,899.00

1 set 1,400.00

30 pcs 236
2.5 kg. 33.5
2 bags 450

10 s.m. 2,500.00
10 s.m. 1,600.00
1 tube 200
5 l.m. 435

2 tubes 450
4 li. 750

10 s.m. 183.5
10 s.m. 162.5
10 s.m. 162.5
10 s.m. 106

1 set 6,300.00
1 set 3,300.00
1 sets 1,000.00
1 sets 600

7 l.m. 400
10 s.m. 506
10 s.m. 287.5

ate and cover 1 sets 90


1 units 490
RIALCOST LABOR COST w/ VAT
AMOUNT UNIT COST

P 0P 450 P
0 442
13,110.00 30
2,892.48 20
0
0

P 16,002.48 P

44,878.75
6,871.20
9,816.00
P 61,565.95 380

11,684.00
266
285
12,235.00 380
P

P P P
11
246.4 11
11
355.2 11
500 18
0 1,000.00

P 746.4 P

P 4,800.00 P 480 P
168 6
13,874.64 5,850.00
100 18

P 18,942.64 P

P 38,125.00 P 106.5 P
2,343.13 65

11
515.78 11

11
515.78 11
500 17.5

1,002.24 67
83.52 67

P 43,085.44 P

182.4 67
15.2 67

P 197.6 P

3,600.00 625
19,504.00 200
240 40
P 23,344.00 P

4,990.00 2,200.00
4,990.00 2,200.00
5,619.00 2,300.00

1,400.00 1,050.00
1,400.00 1,050.00
1,400.00 1,050.00

2,030.40 1,308.42
9,798.00 1,032.96

1,400.00 826.37

P 33,027.40 P

P 7,080.00 P 350 P
83.75 50
900 100

P 8,063.75 P

P 25,000.00 P 153 P
16,000.00 80
T 20
2,175.00 200

P 43,175.00 P

P 900 P 120 P
3,000.00 84

P 3,900.00 P

P 45.88 P 150 P
40.63 120
40.63 95
P 127.13 P

P 1,060.00 P 42 P

6,300.00 500
3,300.00 500
1,000.00 120
600 135

P 12,260.00 P

P 2,800.00 P 500 P
5,060.00 132
2,875.00 81

90 50
490 120

P 11,315.00 P

P 214,186.83 49%
226,692.50 51%
P 440,879.33

P 13,226.38 3%
44,087.93 10%
P 57,314.31

3,306.59
P 3,306.59

P 501,500.24

P 15,233.91
365 Calendar Days
LABOR AND
AMOUNT MATERIALS
P 63,680.90
15,084.00
30,856.02
900
838.4
0
0

47,678.42
P 70,685.95

9,120.00

15,200.00
70,685.95
P 2,366.40

88
132
88
132
180
1,000.00

1,620.00
P 67,770.64
1,920.00
72
46,800.00
36

48,828.00

P 46,170.44
1,065.00
65

110
110

110
110
175

670
670

3,085.00
P 1,537.60

670
670

1,340.00

P 36,614.00
3,750.00
9,200.00
320
13,270.00

P 47,336.53

2,200.00
2,200.00
2,300.00

1,050.00

1,050.00

2,616.84
2,065.92

826.37

14,309.13
P 18,888.75
10,500.00
125
200

10,825.00

P 46,525.00
1,530.00
800
20
1,000.00

3,350.00
P 4,476.00
240
336

576
P 3,777.13
1,500.00
1,200.00
950
3,650.00
P 13,935.00
420

500
500
120
135

1,675.00
P 17,115.00
3,500.00
1,320.00
810

50
120

5,800.00
440,879.33
https://testbook.com/question-answer/after-how-much-time-the-formwork-is-usually-remove--61f8d6c
https://stevensec.com/blog/excavate-a-construction-site#how-long-does-it-take
https://nile-institute.be/preparation-and-pouring-columns/
https://coatings.specialchem.com/coatings-properties/drying-and-curing
ork-is-usually-remove--61f8d6cd9f5951ea5519f032

You might also like