Guard House Construction Overview
Guard House Construction Overview
Site Preparation Column Construction Electrical Wiring Roof Installation Flooring and Finishes
Curing and setting Place reinforcement Install bathroom Drying and setting of Drying and setting of
of foundation bars in formwork fixtures paint paint
Install Intercom /
Structural Framing Communication
Systems
Prepare opening
IN SUCCESSION
Phase Baseline Cost
Site Preparation 131451.54
Column Construction 9120
Beam Construction 15200
Structural Framing 2,366.40
Door and Window Installation 47336.53
Plumbing Setup 13935
Electrical Wiring, Security System Installation 17,115.00
Roof Installation 46525
Exterior Walls/ Interior walls 46,170.44
Flooring, Ceiling, and Finishes 18,888.75
TOTAL 348108.66
SITE PREPARATION
Prepare formwork 2/6/25 2/6/25
Install reinforcements 2/7/25 2/7/25
Pour concrete slab/foundation 2/8/25 2/8/25
Curing and setting of foundation 2/9/25 2/11/25
Foundation Inspection 2/12/25 2/12/25
COLUMN CONSTRUCTION
Prepare formwork 2/12/25 2/12/25
Place reinforcement bars in formwork 2/13/25 2/13/25
Pour concrete for columns 2/14/25 2/14/25
Curing and setting of columns 2/15/25 2/17/25
BEAM CONSTRUCTION
Prepare formwork 2/17/25 2/17/25
Place reinforcement bars in formwork 2/18/25 2/18/25
Pour concrete for columns 2/19/25 2/19/25
Curing and setting of columns 2/20/25 2/22/25
STRUCTURAL FRAMING
Erect walls and framework 2/22/25 2/23/25
Roof trusses and supports 2/24/25 2/25/25
ELECTRICAL WIRING
Power supply line installation 2/25/25 2/25/25
Lighting and outlets setup 2/26/25 2/26/25
PLUMBING SETUP
Install waterline 2/27/25 2/27/25
Install drainage systems 2/28/25 2/28/25
ROOF INSTALLATION
Install roof covering (shingles) 2/25/25 2/25/25
EXTERIOR WALLS
Clean and prepare exterior walls 2/24/25 2/24/25
Apply primer to exterior walls 2/24/25 2/24/25
Apply first coat of waterproof paint 2/25/25 2/25/25
Apply second coat of waterproof paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25
INTERIOR WALLS
Clean and prepare interior walls 2/24/25 2/24/25
Apply primer to interior walls 2/24/25 2/24/25
Apply first coat of acrylic paint 2/25/25 2/25/25
Apply second paint of acrylic paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25
Carl Open
Carl Open
Carl Open
2
Monica Open
Monica Open
Monica Open
Monica Open
Monica Open
Saire Open
2 Saire Open
Saire Open
Saire Open
Angeline Open
Angeline Open
Angeline Open
2 Angeline Open
Carl Open
1 Carl Open
Monica Open
Monica Open
Monica Open
Monica Open
1 Monica Open
Saire Open
1
1 Saire Open
Carl Open
Carl Open
Carl Open
1 Carl Open
Angeline Open
1 Angeline Open
1 Monica Open
Saire Open
Saire Open
Saire Open
Saire Open
3 Saire Open
1 Angeline Open
Carl Open
Carl Open
Carl Open
Carl Open
3 Carl Open
1 Saire Open
FEBRAURY 2025
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
MARCH 2025 .
27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
RCH 2025 .
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
APRIL 2025 .
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
Start date End date
SITE PREPARATION
Clear site 1/31/25 2/1/25
Excavate 2/2/25 2/3/25
Grade and level site 2/4/25 2/5/25
SITE PREPARATION
Prepare formwork 2/6/25 2/6/25
Install reinforcements 2/7/25 2/7/25
Pour concrete slab/foundation 2/8/25 2/8/25
Curing and setting of foundation 2/9/25 2/11/25
Foundation Inspection 2/12/25 2/12/25
COLUMN CONSTRUCTION
Prepare formwork 2/12/25 2/12/25
Place reinforcement bars in formwork 2/13/25 2/13/25
Pour concrete for columns 2/14/25 2/14/25
Curing and setting of columns 2/15/25 2/17/25
BEAM CONSTRUCTION
Prepare formwork 2/17/25 2/17/25
Place reinforcement bars in formwork 2/18/25 2/18/25
Pour concrete for columns 2/19/25 2/19/25
Curing and setting of columns 2/20/25 2/22/25
STRUCTURAL FRAMING
Erect walls and framework 2/22/25 2/23/25
Roof trusses and supports 2/24/25 2/25/25
EXTERIOR WALLS
Clean and prepare exterior walls 2/24/25 2/24/25
Apply primer to exterior walls 2/24/25 2/24/25
Apply first coat of waterproof paint 2/25/25 2/25/25
Apply second coat of waterproof paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25
INTERIOR WALLS
Clean and prepare interior walls 2/24/25 2/24/25
Apply primer to interior walls 2/24/25 2/24/25
Apply first coat of acrylic paint 2/25/25 2/25/25
Apply second paint of acrylic paint 2/25/25 2/25/25
Drying and setting of paint 2/25/25 3/12/25
ROOF INSTALLATION
Install roof covering (shingles) 2/25/25 2/25/25
ELECTRICAL WIRING
Power supply line installation 2/25/25 2/25/25
Lighting and outlets setup 2/26/25 2/26/25
PLUMBING SETUP
Install waterline 2/27/25 2/27/25
Install drainage systems 2/28/25 2/28/25
2/1/25
2/2/25
2/3/25
2/4/25
2/5/25
2/6/25
2/7/25
2/8/25
Assigned Status
Carl Open
Carl Open
Carl Open
Monica Open
Monica Open
Monica Open
Monica Open
Monica Open
Saire Open
Saire Open
Saire Open
Saire Open
Angeline Open
Angeline Open
Angeline Open
Angeline Open
Carl Open
Carl Open
Angeline Open
Saire Open
Saire Open
Saire Open
Saire Open
Saire Open
Carl Open
Carl Open
Carl Open
Carl Open
Carl Open
Monica Open
Saire Open
Saire Open
Monica Open
Monica Open
Monica Open
Monica Open
Monica Open
Angeline Open
Angeline Open
Carl Open
Carl Open
Carl Open
Carl Open
Saire Open
9
9
2/9/25
10
10
2/10/25
11
11
2/11/25
12
12
2/12/25
13
13
2/13/25
14
14
2/14/25
FEBRAURY 2025
15
15
2/15/25
16
16
2/16/25
17
17
2/17/25
18
18
2/18/25
19
19
2/19/25
20
20
2/20/25
21
21
2/21/25
22
22
2/22/25
23
23
2/23/25
24
24
2/24/25
25
25
2/25/25
26
26
2/26/25
27
27
2/27/25
28
28
2/28/25
1
29
3/1/25
2
30
3/2/25
3
31
3/3/25
4
3/4/25 32
5
33
3/5/25
6
34
3/6/25
7
35
3/7/25
8
36
3/8/25
9
37
3/9/25
38
10
3/10/25
39
11
3/11/25
40
12
3/12/25
41
13
3/13/25
42
14
3/14/25
43
15
3/15/25
44
16
3/16/25
MARCH 2025 .
RCH 2025 .
45
17
3/17/25
46
18
3/18/25
47
19
3/19/25
48
20
3/20/25
49
21
3/21/25
50
22
3/22/25 51
23
3/23/25
52
24
3/24/25
53
25
3/25/25
54
26
3/26/25
55
27
3/27/25
56
28
3/28/25
57
29
3/29/25
58
30
3/30/25
3/31/25
4/1/25
4/2/25
4/3/25
4/4/25
4/5/25
4/6/25
4/7/25
MEMBERS:
Elamparo, Monica
Lasola, Maria Saire
Quitan, Carl John
Tulod, Angeline
SUB-TOTAL
Cement
Sand
Testing of CHB Samples
Others
SUB-TOTAL
VIII PLASTER WORKS
Cement Plaster 16mm.thk. (class B) 2 Face
Cement
Sand
Others
SUB-TOTAL
X CARPENTRY WORKS
9mm thk Marine -grade Plywood Ceiling (at T&Bs)
Fascia 305mmx12 mm thk HardieFlex Senepa
2 in x 2in 14 ft Coco Lumber (for ceiling joists)
Others
SUB-TOTAL
XIV TINSMITHRY
Grey Stone Roof Tiles
Roof Insulation (Heat Insulation Blanket)
Silicon sealant
Gutter
Others
SUB-TOTAL
XV WATERPROOFING
A-Plus® Concrete Bond Cementitious Waterproofing @ 2/F Toilets (5 coats)
A-Plus All Weather® 2081 Topcoat Clear Elastomeric Paint
Others
SUB-TOTAL
XVI PAINTING WORKS
Davies Megacryl Concrete Primer & Sealer
Exterior Davies Megacryl Flat 500 White acrylic latex paint - semi gloss finish
Interior Davies Megacryl Flat 500 White acrylic latex paint - semi gloss finish
Others
SUB-TOTAL
XVII SANITARY AND PLUMBING WORKS
Roughing-in Sewer & Vent System (PVC - Neltex/ FD - Eurobrass)
PLUMBING FIXTURES & FITTINGS (complete with accessories)
Water Closet 'Karat' Elongated Front (for Common Toilet)
Lavatory-"Karat" K-1230 Wall Hung
Lav.Faucet OFM
Bidet spray w/ S/S valve & acc.
Others
SUB-TOTAL
XVIII ELECTRICAL WORKS
SERVICE ENTRANCE (including energization)
ROUGHING-IN
ELECTRICAL WIRES / CABLES (Phelp Dodge)
WIRING DEVICES (National Wide Series)
Single Switch complete with plate and cover
Weatherproof Security light with motion detector ner Supplied Material
Others
SUB-TOTAL
SUB-TOTAL
CONTINGENCIES
PROFIT
SUB TOTAL
PERFORMANCE BOND
SUB TOTAL
GRAND TOTAL
33.52 c.m. 0
69.81 c.m. 0
30 c.m. 437
41.92 s.m. 69
32.92 s.m.
1 lot
46 40 kg/bags 254
0.38 cu.m. 700
0.57 cu.m. 500
40 cu.m.
8 0.616 kg/m 20
12 pcs. 20
8 0.888 kg/m 20
12 pcs. 20
10 kgs. 50
1 l.s. 0
4 sheets 1,200.00
12 pcs. 14
8 frames 1,734.33
2 packs 50
10 s.m. 305
1 s.m. 187.45
10 s.m. 27.6
10 s.m. 27.6
10 s.m. 27.6
10 s.m. 27.6
10 kgs. 50
10 s.m. 192
10 s.m. 192
1 lot
10 m 95
10 m 95
6 s.m. 600
46 boards 424
8 pcs. 30
1 set 4,990.00
1 set 4,990.00
1 set 5,619.00
1 set 1,400.00
1 set 1,400.00
1 set 1,400.00
2 sets 1,015.20
2 sets 4,899.00
1 set 1,400.00
30 pcs 236
2.5 kg. 33.5
2 bags 450
10 s.m. 2,500.00
10 s.m. 1,600.00
1 tube 200
5 l.m. 435
2 tubes 450
4 li. 750
10 s.m. 183.5
10 s.m. 162.5
10 s.m. 162.5
10 s.m. 106
1 set 6,300.00
1 set 3,300.00
1 sets 1,000.00
1 sets 600
7 l.m. 400
10 s.m. 506
10 s.m. 287.5
P 0P 450 P
0 442
13,110.00 30
2,892.48 20
0
0
P 16,002.48 P
44,878.75
6,871.20
9,816.00
P 61,565.95 380
11,684.00
266
285
12,235.00 380
P
P P P
11
246.4 11
11
355.2 11
500 18
0 1,000.00
P 746.4 P
P 4,800.00 P 480 P
168 6
13,874.64 5,850.00
100 18
P 18,942.64 P
P 38,125.00 P 106.5 P
2,343.13 65
11
515.78 11
11
515.78 11
500 17.5
1,002.24 67
83.52 67
P 43,085.44 P
182.4 67
15.2 67
P 197.6 P
3,600.00 625
19,504.00 200
240 40
P 23,344.00 P
4,990.00 2,200.00
4,990.00 2,200.00
5,619.00 2,300.00
1,400.00 1,050.00
1,400.00 1,050.00
1,400.00 1,050.00
2,030.40 1,308.42
9,798.00 1,032.96
1,400.00 826.37
P 33,027.40 P
P 7,080.00 P 350 P
83.75 50
900 100
P 8,063.75 P
P 25,000.00 P 153 P
16,000.00 80
T 20
2,175.00 200
P 43,175.00 P
P 900 P 120 P
3,000.00 84
P 3,900.00 P
P 45.88 P 150 P
40.63 120
40.63 95
P 127.13 P
P 1,060.00 P 42 P
6,300.00 500
3,300.00 500
1,000.00 120
600 135
P 12,260.00 P
P 2,800.00 P 500 P
5,060.00 132
2,875.00 81
90 50
490 120
P 11,315.00 P
P 214,186.83 49%
226,692.50 51%
P 440,879.33
P 13,226.38 3%
44,087.93 10%
P 57,314.31
3,306.59
P 3,306.59
P 501,500.24
P 15,233.91
365 Calendar Days
LABOR AND
AMOUNT MATERIALS
P 63,680.90
15,084.00
30,856.02
900
838.4
0
0
47,678.42
P 70,685.95
9,120.00
15,200.00
70,685.95
P 2,366.40
88
132
88
132
180
1,000.00
1,620.00
P 67,770.64
1,920.00
72
46,800.00
36
48,828.00
P 46,170.44
1,065.00
65
110
110
110
110
175
670
670
3,085.00
P 1,537.60
670
670
1,340.00
P 36,614.00
3,750.00
9,200.00
320
13,270.00
P 47,336.53
2,200.00
2,200.00
2,300.00
1,050.00
1,050.00
2,616.84
2,065.92
826.37
14,309.13
P 18,888.75
10,500.00
125
200
10,825.00
P 46,525.00
1,530.00
800
20
1,000.00
3,350.00
P 4,476.00
240
336
576
P 3,777.13
1,500.00
1,200.00
950
3,650.00
P 13,935.00
420
500
500
120
135
1,675.00
P 17,115.00
3,500.00
1,320.00
810
50
120
5,800.00
440,879.33
https://testbook.com/question-answer/after-how-much-time-the-formwork-is-usually-remove--61f8d6c
https://stevensec.com/blog/excavate-a-construction-site#how-long-does-it-take
https://nile-institute.be/preparation-and-pouring-columns/
https://coatings.specialchem.com/coatings-properties/drying-and-curing
ork-is-usually-remove--61f8d6cd9f5951ea5519f032