Fukushima Daiichi Status Summary - 2300 EDT 0312412011 - (1200JDT 3/2512011) Update
Core__ Containment SF Pool 400 fuel assemblies - damaged; RPV, DW, RCS pressure 58 psicq (NISA); RPV level -1/2 TAF (JAIF); pumping 48a~m seawater to feedwater line _) Vessel temp: Btm Head 172C, FW nozzle 218C (NISA) Primary functional-drywell press 51 Dsia, TEPCO considering venting (NISA); Secondary lost, H 2 explosion 292 bundles (GEH); water level unknown; area temp <100 C (NRC team) 548 fuel assemblies - damaged; RCS pressure 9.4 psia (NISA): RPV level -1/3 TAF (JAIF); fire truck providing seawater to recirc line; offsite pwr restored to load-side pwr panel (NISA); condition of pump motors and instrumentation being evaluated (IAEA); Vessel temp: Btm Head 105C, FW nozzle 100C (NISA) Primary - damaged (atmospheric pressure) (JAIF); Secondary - blowout panel opened in side of reactor building to reduce H2 buildup; smoke (steam?) coming from hole 587 bundles (GEH); water temp 104 F (JAIF) 548 fuel assemblies - damaged; RCS press. -5 psiq (NISA); RPV level -1/2 TAF (JAIF); fire truck providing seawater to recirc line. Vessel temp: Btm Head 156C, FW nozzle 66C (instrument problem?) (NISA)

Priority

(Y)

Core

Containment

SF Pool

3 4

Containment

Primary - damaged, -atmospheric press. (JAIF);Secondary - lost during H2 explosion; white smoke (IAEA) 514 bundles (GEH); water sprayed from ground several times(NISA); Sea water injection to SFP via Cooling and Purification Line started at 0535 JDT 3/24. SFP Temp unknown 1331 bundles in SFP (GEH & NISA); pool likely dry at one point causing significant fuel damage; water sprayed into pool to refill; area temp <100 C; completed connecting external electric cable to power center. SFP temp unknown Video of SFP to be avail, later on 3/24 548 fuel assemblies - no damage; Shutdown since 1/3/11; Cold shutdown at 1430 JDT 3/20 (NISA); RPV intact; RPV level +1723mm>TAF temp 83 C (NISA); offsite electrical power restored (NISA); RHR pump stopped at 1724 946 bundles (JAIF); pool temp 120 F (NISA); RHR pump being repaired (TEPCO) 764 fuel assemblies - no damage; Shutdown since 8/14/10; Cold shutdown at 1927 JDT 3/20. (NISA) RPV press 15.8 psia (NISA); RPV level +2758mm>TAF (NISA); temp 76 F (NISA) Cooling with RHR 876 bundles (GEH); pool temp 28.5 F (JAIF); 2 EDGs available. Injection to SFP via normal makeup; Cooling RPV and SFP with RHR(NISA)

SF Pool

4
5

Core SF Pool

6:

Core
SPolPool SF

6 7

Common SF Pool

6,000 bundles (GEH) maintained at 73 C (NISA); normal cooling started 1805 JDT 3/24/2011(NISA)