0% found this document useful (0 votes)
21 views4 pages

Structure

The document outlines consultancy services for the construction of a two-lane road with paved shoulders under the Hybrid Annuity Model in Wardha, Maharashtra. It includes detailed strip charts showing the progress of various construction activities such as excavation, pipe laying, and granular fill at specific chainages. The document also indicates the status of completed and in-progress works along the road segments.

Uploaded by

acmeinfracon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • Documentation,
  • Karanja,
  • Construction Techniques,
  • Progress Tracking,
  • Performance Metrics,
  • Consultancy Services,
  • Lift,
  • Completion Status,
  • Construction,
  • Granular Fill
0% found this document useful (0 votes)
21 views4 pages

Structure

The document outlines consultancy services for the construction of a two-lane road with paved shoulders under the Hybrid Annuity Model in Wardha, Maharashtra. It includes detailed strip charts showing the progress of various construction activities such as excavation, pipe laying, and granular fill at specific chainages. The document also indicates the status of completed and in-progress works along the road segments.

Uploaded by

acmeinfracon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • Documentation,
  • Karanja,
  • Construction Techniques,
  • Progress Tracking,
  • Performance Metrics,
  • Consultancy Services,
  • Lift,
  • Completion Status,
  • Construction,
  • Granular Fill

CONSULTANCY SERVICES FOR CONSTRUCTION OF TWO LANNING WITH PAVED SHOULDERS ROAD UNDER PACKAGE HAM

HYBRID ANNUITY NAG149 DIST WARDHA IN THE STATE OF MAHARASHTRA UNDER MAP ON HYBRID ANNUITY MODE
Structure (HP Culvert) Strip Chart (Kharangna - Kondhali)
RHS LEGEND : COMPLETED: LHS LEGEND : INPROGRESS:

Chainage
HW final Lift

HW final Lift
Granular Fill

Granular Fill
HW 2nd Lift

HW 2nd Lift
HW 1st Lift

HW 1st Lift
Excavation

Excavation
Pipe laying

Pipe laying
Size
Cradle

Cradle
PCC

PCC
Sl.No

C.A Working

1 00+307 00+307 2x1.2

2 00+735 00+735 1x1.2

3 01+050 01+050 1x1.2

4 01+410 01+410 1x1.2

5 01+960 01+960 1x1.2

6 02+150 02+150 1x1.2

7 02+417 02+417 1x1.2

8 02+550 02+550 1x1.2

9 02+940 02+940 1x1.2

10 03+330 03+330 1x1.2

11 03+650 03+650 1x1.2

12 06+250 06+250 1x1.2

13 06+750 06+750 1x1.2

14 07+710 07+710 1x1.2

15 07+870 07+870 1x1.2

16 08+313 08+313 1x1.2

17 08+780 08+780 1x1.2

18 10+100 10+100 2x1.2

19 11+060 11+060 1x1.2

20 11+437 11+437 1x1.2

21 12+160 12+160 1x1.2

22 12+590 12+590 1x1.2

23 12+850 12+850 1x1.2

24 13+200 13+200 1x1.2

25 14+090 14+090 1x1.2

26 16+365 16+350 1x1.2

27 16+860 16+853 1x1.2

28 17+235 17+223 1x1.2

29 17+800 17+795 1x1.2

30 18+035 18+035 2x1.2

31 18+160 18+160 1x1.2

32 18+835 18+835 1x1.2

33 19+170 19+170 1x1.2

34 19+500 19+500 1x1.2


CONSULTANCY SERVICES FOR CONSTRUCTION OF TWO LANNING WITH PAVED SHOULDERS ROAD UNDER PACKAGE HAM
HYBRID ANNUITY NAG149 DIST WARDHA IN THE STATE OF MAHARASHTRA UNDER MAP ON HYBRID ANNUITY MODE
Structure (HP Culvert) Strip Chart (Kharangna - Kondhali)
RHS LEGEND : COMPLETED: LHS LEGEND : INPROGRESS:

Chainage
HW final Lift

HW final Lift
Granular Fill

Granular Fill
HW 2nd Lift

HW 2nd Lift
HW 1st Lift

HW 1st Lift
Excavation

Excavation
Pipe laying

Pipe laying
Size
Cradle

Cradle
PCC

PCC
Sl.No

C.A Working

35 19+670 19+670 1x1.2

36 19+855 19+847 1x1.2

37 20+260 20+260 1x1.2

38 20+355 20+355 1x1.2

39 20+615 20+605 1x1.2

40 21+520 21+520 1x1.2

41 21+760 21+760 1x1.2

42 22+105 22+105 1x1.2

43 22+380 22+380 1x1.2

44 23+245 23+232 1x1.2

45 23+490 23+472 1x1.2

46 24+355 24+340 1x1.2

47 24+545 24+528 2x1.2

48 24+670 24+670 1x1.2

49 24+765 24+765 1x1.2

50 25+015 24+997 1x1.2

51 25+195 25+182 1x1.2

52 25+870 25+870 1x1.2

53 27+880 27+880 1x1.2

54 28+320 28+320 1x1.2

55 28+725 28+725 1x1.2


CONSULTANCY SERVICES FOR CONSTRUCTION OF TWO LANNING WITH PAVED SHOULDERS ROAD UNDER PACKAGE HAM HYBRID ANNUITY NAG149 DIST
WARDHA IN THE STATE OF MAHARASHTRA UNDER MAP ON HYBRID ANNUITY MODE

NAG-149 (Wardha)-Khrangana to Kondhali Road


Structure (HP Culvert) Strip Chart (Rohna - Pimpalkhuta - Wadhona - Karanja)
RHS LEGEND : COMPLETED: LHS LEGEND : INPROGRESS:

Chainage
HW final Lift

HW final Lift
HW 2nd Lift

HW 2nd Lift
Granular Fill

Granular Fill
HW 1st Lift

HW 1st Lift
Pipe laying

Pipe laying
Excavation

Excavation
Size
Cradle

Cradle
PCC

PCC
Sl.No

C.A Working

1 00+420 00+420 2x1.2

2 00+710 00+710 1x1.2

3 01+967 01+967 1x1.2

4 02+320 02+320 1x1.2

5 02+875 02+875 1x1.2

6 03+285 03+285 1x1.2

7 03+452 03+452 1x1.2

8 04+160 04+160 1x1.2

9 04+410 04+410 1x1.2

10 04+580 04+580 1x1.2

11 04+705 04+705 1x1.2

12 05+730 05+730 1x1.2

13 06+610 06+610 1x1.2

14 06+945 06+945 1x1.2

15 07+272 07+272 1x1.2

16 07+935 07+935 1x1.2

17 08+270 08+270 1x1.2

18 08+570 08+570 2x1.2

19 10+820 10+820 1x1.2

20 12+045 12+045 1x1.2

21 13+790 13+790 1x1.2

22 15+440 15+440 1x1.2

23 15+905 15+905 1x1.2

24 19+170 19+170 1x1.2

25 21+920 21+920 1x1.2

26 22+485 22+485 1x1.2

27 22+652 22+652 1x1.2

28 23+412 23+430 1x1.2

29 23+518 23+518 1x1.2

30 24+775 24+775 2x1.2

31 25+350 25+350 1x1.2

32 25+790 25+801 1x1.2

33 27+380 27+384 1x1.2

34 28+150 28+145 1x1.2

35 28+945 28+948 1x1.2

36 30+920 30+920 1x1.2

37 32+570 32+570 1x1.2

38 33+040 33+052 1x1.2

39 34+220 34+220 1x1.2

40 34+710 34+710 1x1.2

41 36+000 36+000 1x1.2


CONSULTANCY SERVICES FOR CONSTRUCTION OF TWO LANNING WITH PAVED SHOULDERS ROAD UNDER PACKAGE HAM HYBRID ANNUITY NAG149 DIST
WARDHA IN THE STATE OF MAHARASHTRA UNDER MAP ON HYBRID ANNUITY MODE

NAG-149 (Wardha)-Khrangana to Kondhali Road


Structure (HP Culvert) Strip Chart (Rohna - Pimpalkhuta - Wadhona - Karanja)
RHS LEGEND : COMPLETED: LHS LEGEND : INPROGRESS:

Chainage
HW final Lift

HW final Lift
HW 2nd Lift

HW 2nd Lift
Granular Fill

Granular Fill
HW 1st Lift

HW 1st Lift
Pipe laying

Pipe laying
Excavation

Excavation
Size
Cradle

Cradle
PCC

PCC
Sl.No

C.A Working

42 36+818 36+818 1x1.2

43 38+610 38+610 1x1.2

44 39+100 39+100 1x1.2