Detail of HPC & Slab Culvert

Name of Work : -- Construction of Sarna to Umariya Road


Length 14.190 KM
Agreement N0. 01/CRF/2019-20
In DPR Existing Proposed

S. No. Chainnage Type of CD CH Type of Exiting Structure Type of Proposed Structure Remarks

1 2+100 1 Row 1000mm 0+110 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

2 2+400 1 Row 1000mm 0+380 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

3 3+400 1 Row 1000mm 1+190 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

4 4+800 1 Row 1000mm 2+345 1Row HPC 1000mm dia 1Row HPC 1000mm dia
R/s U/s width-7.50 m width-12.50 m

5 5+800 1 Row 1000mm 2+807 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

6 6+600 1 Row 1000mm 3+050 2Row VCW 1000mm dia 1 span 6 m Slab culvert
R/s U/s width-7.50 m width - 12.50 m

7 7+800 1 Row 1000mm 4+235 2Row VCW 1000mm dia 1 span 6 m Slab culvert
R/s U/s width-7.50 m width - 12.50 m

8 8+100 1 Row 1000mm 4+800 6Row VCW 1000mm dia 3 span 6 m Slab culvert
L/s U/s width-7.50 m width - 12.50 m

9 8+800 1 Row 1000mm 5+410 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

10 9+100 2 Row 1000mm 7+040 2Row VCW 1000mm dia 3 span 6 m Slab culvert
L/s U/s width-7.50 m width - 12.50 m

11 9+400 1 Row 1000mm 7+540 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

12 10+100 1 Row 1000mm 7+700 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

13 10+200 1 Row 1000mm 8+230 4Row VCW 1000mm dia 2 span 6 m Slab culvert
R/s U/s width-7.50 m width - 12.50 m

14 11+040 1 Row 1000mm 8+832 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

15 11+100 2 Row 1000mm 9+520 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

16 12+400 1 Row 1000mm 10+380 2Row HPC 1000mm dia 2 span 6 m Slab culvert
R/s U/s width-7.50 m width - 12.50 m

17 13+200 1 Row 1000mm 10+570 2Row HPC 600mm dia 1Row HPC 1000mm dia
R/s U/s width-7.50 m width-12.50 m

18 15+200 2 Row 1000mm 10+730 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

19 Repet Chainge 1 Row 1000mm 10+830 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

20 Repet Chainge 1 Row 1000mm 12+010 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

21 4+200 1 Span 6m 13+160 3Row VCW 1000mm dia 4 span 6 m Slab culvert
R/s U/s width-7.50 m width - 12.50 m

22 5+100 1 Span 6m 14+180 1Row HPC 1000mm dia 1Row HPC 1000mm dia
L/s U/s width-7.50 m width-12.50 m

23 5+800 1 Span 6m

24 8+200 1 Span 6m

25 9+400 2 Span 6m

26 10+600 1 Span 6m

27 14+400 4 Span 6m
Detail of HPC & Slab Culvert
Name of Work : -- Construction of Rajegaon-Kirnapur-Lanji-Amgaon Road
Length 57.400KM

Agreement N0. 06/CRF/2019-20 Dated: 25.12.2019

S.No. New Provide(Required) As per D.P.R.

1 21 4
2 3 4
3 2 0
4 0 4
5 6 0
6 1 0
7 1 0
8 2 0
9 4 0

Total 40 12

RajaRam Cons. Sub. Div. Officer Executive Engineer


Balaghat Lanji PWD. Div. Balaghat
Name of Work : -- Construction of Sarna to Umariya Road Length 14.190 KM

Details Chainage of C.C. & B.T. Road


CC Road BT Road
S.No. Total Length Total Length
Start Chainage End Chainage Remarks Start Chainage End Chainage Remarks
(in m) (in m)
1 0+00 0+130 130 Sarna 0+130 1+197 1067 Sarna
Sarna 1+208 1+808 600
Khiri Bhutai 1+946 3+051 1105
2 3+050 3+750 700 Khiri Bhutai 3+750 4+240 490 Khiri Bhutai
3 4+240 4+570 330 Panjara 4+570 5+890 1320 Panjara
4 5+890 6+430 540 Chaniyakalan 6+430 14+190 7760 Chaniyakalan - Bohnakhiri
1700 12342

Total = Bridge Portion + SH-547 + CC Road + BT Road = >138+11+1700+12490 = 14190 m

Bridge Portion = 0.138 Km.


SH - 547 Crossing = 0.011 km
CC Portion = 1.700 Km.
BT Portion = 12.490 Km.

Total Length Road = 14042 Km


Detail of Tree Across the Road Site
Name of Work : - Construction of Sarna to Umariya Road
Length 14.190 KM
Agreement No. :- 01/CRF/2019-20
Starting point of Road From SH-547 Road Chhindwara to Narsingpur - Sarna
Distance From B/T
S. No. Chainage L/R Side Girth of Tree Name of Tree
Center
1 0+110 LHS 4.30 0.40 Babool
2 0+280 RHS 3.70 0.30 Babool
3 0+300 LHS 4.70 0.30 Babool
4 0+470 LHS 5.00 0.70 Imli
5 0+490 RHS 3.80 1.50 Imli
6 0+562 RHS 5.00 1.10 Imli
7 0+635 LHS 3.70 2.00 Imli
8 0+650 LHS 2.80 1.00 Imli
9 0+665 RHS 4.80 1.00 Mahua
10 0+690 LHS 3.00 0.70 Imli
11 0+780 RHS 2.40 1.20 Imli
12 0+850 LHS 4.20 0.30 Babool
13 0+860 LHS 5.20 0.20 Babool
14 0+960 LHS 4.30 0.30 Babool
15 0+995 RHS 4.50 0.30 Babool
16 1+002 RHS 4.70 0.25 Chhind
17 1+270 LHS 4.70 1.00 Mango
18 1+278 RHS 4.90 0.20 Babool
19 1+285 LHS 5.00 2.00 Mango
20 1+295 LHS 4.50 1.50 Mango
21 1+300 LHS 5.00 1.50 Mango
22 1+580 LHS 4.30 0.30 Babool
23 1+590 LHS 4.80 0.30 Babool
24 RHS 5.20 0.30 Babool
25 1+600 LHS 5.00 0.30 Chhind
26 1+620 RHS 4.60 0.30 Babool
27 1+950 RHS 5.00 0.40 Babool
28 2+008 RHS 4.40 0.20 Ber
29 2+142 LHS 4.70 0.35 Gultarra
30 2+150 LHS 4.00 0.30 Babool
31 2+675 RHS 3.40 0.50 Babool
32 2+700 RHS 3.90 0.30 Babool
33 2+735 LHS 5.40 0.20 Babool
34 2+870 LHS 5.40 0.50 Babool
35 2+980 LHS 4.90 0.40 Babool
36 3+330 RHS 5.20 0.40 Mango
37 3+362 LHS 4.60 0.30 Babool
38 3+380 RHS 4.20 0.30 Neem
39 3+390 RHS 4.60 0.30 Babool
40 3+770 LHS 4.30 0.50 Mango
41 3+950 LHS 3.30 1.00 Mango
42 3+965 LHS 5.20 0.40 Mango
43 4+060 LHS 4.90 0.40 Babool
44 4+065 LHS 4.50 0.30 Babool
45 4+160 LHS 3.50 0.20 Babool
46 4+180 RHS 4.10 0.80 Babool
47 4+120 LHS 3.50 0.30 Babool
48 LHS 4.50 0.30 Litmus
49 4+600 RHS 3.70 0.40 Babool
50 4+625 RHS 4.90 0.30 Babool
51 4+635 LHS 3.90 0.30 Babool
52 4+670 RHS 2.30 0.70 Mango
53 LHS 2.90 0.80 Mango
54 4+675 LHS 3.00 0.60 Mango
55 4+680 LHS 3.20 0.60 Mango
56 4+690 LHS 4.60 0.50 Mango
57 4+700 LHS 3.40 0.80 Mango
58 4+720 RHS 2.90 1.00 Mango
59 4+740 LHS 3.60 1.20 Mango
60 4+750 LHS 3.60 0.60 Mango
61 RHS 3.30 0.40 Mango
62 4+875 LHS 4.70 0.80 Mango
63 4+820 RHS 4.90 0.80 Mango
64 4+960 LHS 3.90 1.00 Mahua
65 5+000 LHS 4.00 1.00 Babool
66 5+010 LHS 3.80 0.80 Babool
67 5+060 LHS 5.00 0.80 Mahua
68 5+120 LHS 5.00 0.70 Babool
69 5+150 LHS 4.80 0.60 Babool
70 5+170 LHS 4.00 0.30 Babool
71 5+440 RHS 4.30 0.40 Babool
72 5+480 RHS 3.70 0.20 Babool
73 5+560 RHS 3.70 0.40 Babool
74 5+565 LHS 3.70 0.60 Babool
75 5+570 RHS 3.70 0.60 Babool
76 5+610 LHS 3.80 0.40 Babool
77 5+640 LHS 4.30 0.20 Babool
78 5+641 LHS 4.10 0.20 Babool
79 5+642 LHS 4.10 0.30 Babool
80 5+643 LHS 4.20 0.25 Babool
81 5+644 LHS 4.00 0.30 Babool
82 5+645 RHS 4.90 0.20 Babool
83 5+840 LHS 4.80 0.40 Tree
84 6+010 RHS 3.70 0.30 Tree
85 6+380 LHS 3.10 0.80 Tree
86 6+381 RHS 3.70 0.80 Tree
87 6+420 LHS 3.80 0.30 Tree
88 6+500 LHS 4.90 0.30 Mango
89 6+501 RHS 3.30 0.30 Mango
90 6+560 LHS 4.10 0.30 Mango
91 6+615 LHS 2.50 0.50 Mango
92 6+616 RHS 2.50 0.40 Mango
93 6+625 RHS 2.20 0.30 Mango
94 6+630 LHS 2.20 0.30 Mango
95 6+660 LHS 4.30 0.30 Mango
96 6+690 RHS 4.00 0.30 Mango
97 6+750 RHS 3.90 0.30 Mango
98 6+790 LHS 3.40 1.00 Mango
99 6+800 LHS 3.70 1.20 Mango
100 6+801 LHS 3.60 0.80 Mango
101 6+840 LHS 5.30 0.70 Mango
102 6+920 LHS 4.00 0.40 Neem
103 6+980 LHS 3.50 0.70 Mango
104 6+985 LHS 4.40 0.60 Mango
105 7+020 LHS 4.30 0.60 Mango
106 7+450 LHS 3.90 0.20 Mango
107 7+470 LHS 4.50 0.30 Mango
108 7+500 RHS 5.00 0.40 Mango
109 7+501 LHS 5.00 0.50 Mango
110 8+130 RHS 4.90 0.30 Chhind
111 8+140 LHS 4.10 0.30 Mango
112 8+330 LHS 3.50 0.40 Mango
113 8+340 LHS 5.20 0.40 Mango
114 8+460 LHS 4.40 0.30 Mango
115 8+480 LHS 4.40 0.20 Mango
116 8+770 LHS 4.10 0.40 Mango
117 8+790 LHS 4.00 0.40 Mango
118 8+820 LHS 3.60 0.50 Mango
119 8+830 LHS 3.80 0.30 Mango
120 8+831 RHS 3.80 0.60 Mango
121 8+680 LHS 3.90 0.30 Babool
122 8+690 LHS 4.00 0.30 Babool
123 8+750 LHS 4.80 0.30 Babool
124 8+760 LHS 4.30 0.30 Babool
125 8+780 LHS 3.90 0.30 Babool
126 8+800 LHS 3.00 0.30 Babool
127 8+860 LHS 4.00 0.30 Babool
128 8+980 LHS 5.00 0.30 Babool
129 9+120 RHS 5.20 0.30 Babool
130 9+640 LHS 4.20 0.30 Babool
131 9+680 LHS 4.50 0.30 Babool
132 9+681 RHS 4.20 0.30 Babool
133 9+685 LHS 5.10 0.30 Babool
134 9+800 LHS 4.70 0.40 Babool
135 9+860 LHS 4.40 0.50 Babool
136 10+130 RHS 4.30 0.60 Babool
137 10+400 RHS 4.70 0.40 Babool
138 10+420 RHS 3.70 0.30 Babool
139 10+430 RHS 4.20 0.30 Babool
140 10+440 LHS 4.80 0.40 Babool
141 10+445 LHS 4.70 0.30 Babool
142 10+450 LHS 4.70 0.60 Babool
143 10+455 LHS 3.80 0.50 Babool
144 10+480 LHS 3.80 0.20 Babool
145 12+180 RHS 4.80 0.30 Mango
146 12+760 RHS 3.90 0.40 Babool
147 12+920 LHS 3.90 0.40 Babool
148 12+950 LHS 3.90 0.30 Babool
Detail of Electric pole along the Road Site
Name of Work : - Construction of Sarna to Umariya Road
Length 14.190 KM
Agreement No. :- 01/CRF/2019-20

Starting point of Road From SH-547 Road Chhindwara to Narsingpur - Sarna


Distance From Center of
S. No. Chainage L/R Side Type of pole (Eleven, LT,Village)
Road
1 0+080 RHS 3.00 Electric Pole
2 0+130 RHS 5.00 Electric Pole
3 0+170 RHS 3.80 Electric Pole (Transformar)
4 0+186 RHS 3.80 Electric Pole (2 Nos.)
5 0+300 RHS 4.00 Electric Pole
6 LHS 4.00 Electric Pole
7 0+380 LHS 4.00 Electric Pole
8 RHS 5.00 Electric Pole
9 0+400 LHS 5.30 Electric Pole (Transformar)
10 1+980 RHS 4.40 Electric Pole
11 2+400 LHS 5.40 Electric Pole
12 2+450 RHS 4.70 Electric Pole
13 2+500 RHS 4.30 Electric Pole
14 2+580 RHS 3.40 Electric Pole
15 3+160 LHS 3.70 Electric Pole
16 RHS 2.40 Electric Pole
17 3+188 RHS 3.90 Electric Pole
18 3+225 LHS 5.00 Electric Pole
19 3+230 RHS 4.70 Solar Energy Light Pole
20 3+239 LHS 4.10 Electric Pole
21 3+270 LHS 3.90 Electric Pole
22 3+280 LHS 4.10 Electric Pole
23 3+350 LHS 4.10 Electric Pole
24 3+370 RHS 4.90 Solar Energy Light Pole
25 3+395 LHS 4.00 Electric Pole
26 3+420 LHS 3.50 Electric Pole
27 3+430 RHS 3.30 Electric Pole
28 3+450 RHS 3.90 Electric Pole
29 3+455 LHS 4.00 Solar Energy Light Pole
30 3+510 LHS 4.20 Telephone Pole
31 3+530 LHS 4.70 Electric Pole (Transformar)
32 3+550 LHS 3.60 Electric Pole
33 3+570 RHS 3.70 Electric Pole
34 3+590 LHS 3.80 Electric Pole
35 3+610 RHS 3.40 Electric Pole
36 3+615 RHS 3.80 Electric Pole
37 3+620 LHS 4.40 Electric Pole (Transformar)
38 3+650 RHS 3.30 Electric Pole
39 3+670 RHS 3.10 Electric Pole
40 3+680 RHS 5.20 Electric Pole
41 3+685 LHS 4.40 Electric Pole
42 3+730 LHS 3.80 Electric Pole
43 3+740 LHS 2.50 Electric Pole
44 RHS 4.20 Electric Pole
45 3+890 RHS 3.70 Electric Pole
46 3+935 RHS 3.40 Electric Pole
47 3+955 RHS 3.00 Electric Pole
48 3+980 RHS 4.50 Electric Pole
49 4+060 LHS 4.90 Electric Pole
50 4+070 RHS 3.70 Electric Pole
51 4+075 RHS 3.20 Electric Pole
52 4+085 RHS 4.10 Electric Pole
53 4+230 LHS 2.80 Electric Pole
54 4+245 LHS 4.70 Electric Pole
55 LHS 4.10 Electric Pole
56 4+350 LHS 2.90 Electric Pole
57 RHS 2.90 Electric Pole
58 4+380 RHS 2.80 Electric Pole
59 4+420 RHS 3.40 Electric Pole
60 4+425 LHS 2.80 Electric Pole
61 RHS 3.00 Electric Pole
62 4+550 LHS 3.50 Electric Pole
63 4+570 LHS 4.70 Electric Pole
64 5+620 RHS 5.10 Electric Pole
65 5+640 RHS 4.00 Electric Pole
66 5+790 RHS 4.80 Electric Pole
67 5+810 RHS 3.80 Electric Pole
68 6+040 LHS 2.70 Electric Pole
69 6+052 LHS 3.30 Electric Pole
70 6+080 LHS 3.00 Electric Pole
71 6+100 LHS 2.80 Electric Pole
72 6+120 LHS 4.00 Electric Pole
73 6+140 LHS 3.70 Electric Pole
74 6+160 RHS 2.70 Electric Pole
75 6+280 LHS 2.80 Electric Pole
76 6+340 RHS 4.30 Electric Pole
77 6+345 LHS 4.10 Electric Pole
78 6+400 RHS 4.00 Electric Pole
79 6+440 LHS 4.20 Electric Pole
80 6+460 RHS 4.90 Electric Pole
81 6+470 RHS 4.80 Electric Pole
82 6+490 RHS 3.70 Electric Pole
83 LHS 2.90 Electric Pole
84 6+560 RHS 5.10 Electric Pole
85 6+670 RHS 4.20 Electric Pole
86 6+700 LHS 3.90 Electric Pole
87 6+740 RHS 3.80 Electric Pole
88 6+850 RHS 4.70 Electric Pole
89 6+900 RHS 3.80 Electric Pole
90 6+940 RHS 4.10 Electric Pole
91 7+460 RHS 4.50 Electric Pole
92 7+940 LHS 3.40 Electric Pole
93 8+110 RHS 3.70 Electric Pole
94 8+130 LHS 3.40 Electric Pole
95 10+140 LHS 4.00 Electric Pole
96 10+340 LHS 4.50 Electric Pole
97 10+420 LHS 5.10 Electric Pole
98 10+580 LHS 3.50 Telephone Pole
99 10+700 LHS 3.50 Telephone Pole
100 10+820 RHS 3.30 Electric Pole
101 12+100 LHS 5.00 Electric Pole
102 12+180 RHS 4.80 Electric Pole
103 12+360 RHS 3.10 Electric Pole
104 12+420 RHS 3.60 Electric Pole
105 12+460 RHS 4.00 Electric Pole
106 12+950 RHS 3.80 Electric Pole
Detail of other Structure the Road Site
Name of Work : -- Construction of Sarna to Umariya Road
Length 14.190 KM
Starting point of Road From SH-547 Road Chhindwara to Narsingpur - Sarna
Distance From Center of
S. No. Chainage L/R Side Name of Structure
Road
1 0+00 LHS 5.00 Pan Shop
2 0+05 LHS 5.00 Garage shop
3 RHS 4.30 School Baundry wall
4 0+020 LHS 5.40 House
5 RHS 3.50 School Baundry wall
6 0+025 LHS 4.60 Hair Saloon
7 0+060 LHS 4.00 House
8 0+080 LHS 3.80 House
9 0+100 LHS 3.90 Hair Saloon
10 0+140 LHS 4.00 House
11 0+230 LHS 3.10 House
12 0+260 LHS 4.90 House
13 0+270 LHS 4.60 House
14 0+280 LHS 2.40 House
15 0+340 LHS 4.80 House
16 0+350 RHS 3.80 House
17 0+370 LHS 4.60 House
18 LHS 4.40 House
19 0+380 LHS 4.00 House
20 0+505 LHS 3.40 open well
21 0+820 to 0+850 RHS 4.70 House
22 0+854 RHS 3.40 PHE Pipe line Steel Piller
23 2+390 RHS 5.00 open well
24 2+526 RHS 4.30 House
25 3+080 LHS 2.90 House
26 3+090 LHS 3.80 House
27 3+180 RHS 4.00 House
28 3+195 RHS 4.40 House
29 3+220 LHS 5.00 House
30 3+225 RHS 4.90 House
31 3+239 LHS 4.10 House
32 3+245 RHS 4.00 House
33 3+250 LHS 4.80 House
34 3+270 LHS 3.00 House
35 RHS 3.40 House(Temple)
36 3+280 LHS 4.10 House
37 3+300 LHS 3.90 House Baundry wall
38 RHS 4.30 House Baundry wall
39 3+535 LHS 4.00 House
40 3+340 RHS 4.50 Bore well
41 3+385 LHS 4.70 H/P & House
42 3+390 RHS 4.60 House
43 3+395 RHS 3.20 House
44 3+400 LHS 3.90 House
45 3+430 LHS 4.30 House
46 3+455 LHS 4.00 House
47 3+470 LHS 4.70 House
48 3+535 LHS 5.40 Shops
49 3+580 RHS 4.00 House
50 3+620 RHS 3.80 Temple
51 3+760 RHS 4.30 PHE Pipe line Steel Piller
52 4+300 RHS 3.00 House
53 4+310 LHS 5.10 House
54 4+330 LHS 4.70 House
55 4+345 LHS 3.20 House
56 4+350 LHS 2.90 House
57 4+360 LHS 2.70 Temple
58 4+410 LHS 3.70 House Baundry wall
59 LHS 4.60 House Baundry wall
60 4+420 RHS 4.30 House
61 4+460 RHS 3.40 House
62 4+480 LHS 4.30 House
63 4+500 LHS 3.10 House
64 4+520 RHS 4.00 House
65 4+540 LHS 3.30 House
66 4+545 RHS 4.00 House
67 5+520 RHS 3.40 PHE Pipe line Steel Piller
68 5+600 RHS 3.90 H/P
69 5+900 RHS 2.50 PHE Pipe line Steel Piller
70 5+940 LHS 2.80 House
71 5+960 Both side 2.80 House
72 5+980 Both side 2.80 House
73 6+000 Both side 2.40 House
74 6+040 LHS 3.10 House
75 RHS 2.90 House
76 6+050 RHS 2.90 Temple
77 6+060 LHS 2.60 House
78 6+090 RHS 3.90 House
79 6+100 RHS 3.00 House
80 6+140 RHS 3.80 House
81 6+160 LHS 3.90 House
82 6+200 LHS 2.90 House
83 RHS 3.30 House
84 6+220 LHS 2.80 House
85 6+240 LHS 3.90 House
86 6+250 LHS 2.60 House
87 RHS 3.80 House
88 6+260 LHS 2.90 House
89 6+280 LHS 2.70 House
90 6+295 LHS 3.80 House
91 RHS 3.00 House
92 6+320 LHS 3.70 House
93 6+340 LHS 3.70 House
94 RHS 4.30 House
95 6+610 RHS 4.10 Tube well
96 7+025 LHS 3.60 PHE Pipe line Steel Piller
97 8+740 RHS 2.90 PHE Pipe line Steel Piller
98 10+540 LHS 3.70 House
99 10+640 LHS 2.90 House
100 RHS 3.30 House
101 10+660 RHS 4.70 House
102 LHS 3.30 House
103 10+670 RHS 3.10 House
104 10+680 RHS 3.30 House
105 10+690 RHS 3.60 House
106 10+700 RHS 2.70 House
107 10+730 RHS 4.50 House