Professional Documents
Culture Documents
STANDARD
Part 13.01.06
STANDARD
Part 13.01.06
TABLE OF CONTENTS
Page
1 General ............................................................................................................... 3
2 Stainless steel pipes ......................................................................................... 3
3 Carbon steel pipes ............................................................................................ 4
4 GRP pipes .......................................................................................................... 4
1 General
The maximum allowable pressures for a branch connection with reinforcement are
listed in standard 13.02.08.
A factory-made tee is designed for the nominal pressure of the pipe class (see
standard 13.02.07).
The dimensions of reinforcement plates are presented in Standard 13.02.09. The wall
thickness of the reinforcement plate must not exceed s in the calculations.
The maximum pressure in the line at the location of the tee connection shall be used
as the design pressure of the tee connection.
The maximum design pressure at the pressure side of the pump can be defined by
adding the head of the pump to the hydrostatic head.
The maximum design pressure of the tee connection at the suction side of a pump is
maximum hydrostatic head.
A reinforced branch with thick wall pipe or plate reinforcement shall be used if
pressure strength can be achieved with reinforcement, otherwise a factory-made tee
shall be selected.
External loads such as vibrations and big bending moments shall be considered
when necessary.
For high pressure piping tee-piece shall be selected. Tee pieces with DN2/ DN1 > 0.8
are not permissible for a design within the creep range of the material.
4 GRP pipes
Tee-piece shall be specified for tee connections where the size of the branch pipe is
equal or up to two DN sizes smaller than the main pipe. Otherwise reinforced
branches shall be used.