You are on page 1of 4

LARSEN & TOUBRO LIMITED

CONSTRUCTION
HEAVY CIVIL INFRASTRUCTURE IC
FORMAT NO- L&T/MEGA/UG2/F/035
PROJECT TITLE: MEGA AHMEDABAD METRO UG2 PROJECT (EAST-WEST CORRIDOR)

CLIENT: METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) Co. LIMITED

CONSULTANT: MEGA - GEC (A CONSORTIUM OF SYSTRA-RITES-OCG-AECOM)

CONTRACTOR: LARSEN & TOUBRO LIMITED - CONSTRUCTION (HEAVY CIVIL INFRASTRUCTURE IC)

REV NO.: A REV DATE:22-09-2017


BAR BENDING SCHEDULE
SCHEDULE NO: 5 DATE: LOCATION: (Kalupur R.C Techinical) Launching Shaft
DRAWING NO. LNT-LAS-UG2-LSH-0457 REVISION: A DESCRIPTION OF WORK: DIAPHRAGM WALL, PANEL NO = P109

Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

1 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 50.125 38.125 12000 12000 384.000 0.948 12000

12000
2 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 38.925 26.925 12000 12000 384.000 0.948

2887
3 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 27.725 24.838 2887 2887 92.384 0.228

12000
4 Soil Face 01 150 c/c 3 x 1 = 3 #32 50.125 38.125 12000 12000 36.000 0.227

12000
5 Soil Face 01 150 c/c 3 x 1 = 3 #32 39.405 27.405 12000 12000 36.000 0.227

3847
6 Soil Face 01 150 c/c 3 x 1 = 3 #32 28.685 24.838 3847 3847 11.541 0.073

7150
7 Soil Face 02 150 c/c 2 35 x 1 = 35 #16 45.400 38.25 7150 7150 250.250 0.395

2500
8 Soil Face 02 Bundled 150 c/c 2a 35 x 1 = 35 #12 40.95 38.45 2500 2500 87.500 0.078

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

12000
9 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 50.125 38.125 12000 12000 384.000 0.948

12000
10 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 38.925 26.925 12000 12000 384.000 0.948

2887
11 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 27.725 24.838 2887 2887 92.384 0.228

12000
12 Excavated Face 01 150 c/c 3 x 1 = 3 #32 50.125 38.125 12000 12000 36.000 0.227

12000
13 Excavated Face 01 150 c/c 3 x 1 = 3 #32 39.405 27.405 12000 12000 36.000 0.227

3847
14 Excavated Face 01 150 c/c 3 x 1 = 3 #32 28.685 24.838 3847 3847 11.541 0.073

5380

12000
15 Excavated Face 02 150 c/c 14 35 x 1 = 35 #32 38.42 26.42 12000 12000 420.000 2.650

5115
Horizontal Biender 200
16 Excavated Face
150 c/c 6a 170 x 1 = 170 #16 50.125 24.838 5451 (5115+200+200)-(4*16) 926.670 1.464 200

5115
Horizontal Biender Soil 200
17 Face
150 c/c 6 170 x 1 = 170 #16 50.125 24.838 5451 (5115+200+200)-(4*16) 926.670 1.464 200

638
18 Stirrups 150 c/c 7 66 x 1 = 66 #10 50.125 40.4 1756 ((2*638)+(2*190))+(20*10)-(10*10) 115.896 0.072

638
19 Stirrups 150 c/c 8 66 x 6 = 396 #10 50.125 40.4 2056 ((2*638)+(2*340))+(20*10)-(10*10) 814.176 0.502

638
Stirrups Around Tremie
20 Pipe
150 c/c 8a 66 x 2 = 132 #10 50.125 40.4 2356 ((2*638)+(2*490))+(20*10)-(10*10) 310.992 0.192

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

642
21 Stirrups 150 c/c 9 12 x 1 = 12 #12 40.4 38.7 1792 ((2*642)+(2*194))+(20*12)-(10*12) 21.504 0.019

642
22 Stirrups 150 c/c 10 12 x 6 = 72 #12 40.4 38.7 2092 ((2*642)+(2*344))+(20*12)-(10*12) 150.624 0.134

Stirrups Around Tremie 642


23 Pipe
150 c/c 10a 12 x 2 = 24 #12 40.4 38.7 2392 ((2*642)+(2*494))+(20*12)-(10*12) 57.408 0.051

638
24 Stirrups 150 c/c 7 93 x 1 = 93 #10 38.7 24.838 1756 ((2*638)+(2*190))+(20*10)-(10*10) 163.308 0.101

638
25 Stirrups 150 c/c 8 93 x 6 = 558 #10 38.7 24.838 2056 ((2*638)+(2*340))+(20*10)-(10*10) 1147.248 0.708

Stirrups Around Tremie 638


26 Pipe
150 c/c 8a 93 x 2 = 186 #10 38.7 24.838 2356 ((2*638)+(2*490))+(20*10)-(10*10) 438.216 0.270

B 50d
27 Coupler Bar Base Slab 150 c/c 11 35 x 1 = 35 #20 30.128 30.128 1075 50*20+75 37.625 0.093

B 5 50d
28 Coupler Bar Base Slab 150 c/c 12 35 x 1 = 35 #32 29.348 29.348 1675 50*32+75 58.625 0.370

29 Coupler Resting Bars 500 c/c - 4 x 1 = 4 #25 - - 5115 5115 20.460 0.079 5115


590
30 Lifting Eye - 13 3 x 2 = 6 #32 - - 5180 (2*2000)+(2*590) 31.080 0.196 2000
2000

200

970
31 Resting Hooks 1500 c/c - 4 x 2 = 8 #20 50.370 49.62 2140 2140 17.120 0.042

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

32 Spacer Bar Soil Face 2000 c/c - 4 x 1 = 4 #25 - - 5115 5115 20.460 0.079 5115

Spacer Bar Excavated


33 Face
2000 c/c - 7 x 1 = 7 #32 - - 5115 5115 35.805 0.226 5115

600
807
34 Z Bars 2000 c/c - 39 x 2 = 78 #25 - - 1907 600+600+807-4*(25) 148.746 0.573

600

ABSTRACT of WEIGHTS (MT) -


#8 #10 #12 #16 #20 #25 #32 TOTAL
--- 1.845 0.282 3.323 4.383 0.731 4.496 15.060

Note: M.S round bars conforming to IS:432 are denoted by the symbol ' ' followed by the size in millimetres, and HYSD bars conforming to IS:1786 are denoted by the symbol ' # ' followed by the size in millimetres.

Prepared by Checked by Approved by

Approved by
Prepared by Checked by