PCC Work SWMS, JPMC
PCC Work SWMS, JPMC
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
1 of 12
Safe Work Method Statement
Company Name: Padam Interiors Activity/Trade : PCC work by concrete mixture and concrete pump
Address: Padam Interiors 1101,Lotus Trade Centre Near D.N.Nagar Metro Station, Supervisor Name: Murli Manohar
New Link Road, Andheri (W), Mumbai-400058 INDIA. Contact No: 9571680505
Details: To outline safe methods for mixing, transporting, placing, and Equipment, Tools & tackles Spec:
finishing PCC using an on-site concrete mixer and concrete pump.
Concrete mixer (diesel/electric)
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
2 of 12
Safe Work Method Statement
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
3 of 12
Safe Work Method Statement
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
4 of 12
Safe Work Method Statement
4. Pump Setup and Tipping of pump Place pump on firm, level ground
Inspection
Hose burst or disconnection E Use stabilizers and outrigger pads L EHS
OFFICER
Contact with overhead powerlines Maintain clearance from electrical lines (min 6.4m) &
FLOOR
SUPERVISOR
Check hose connections and clamps
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
6 of 12
Safe Work Method Statement
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
7 of 12
Safe Work Method Statement
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: Page No.
8 of 12
Safe Work Method Statement
Personnel Summary
SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name: Mr.Murli Manohar
Graduate
10+ exp
TICKETS, PERMITS or LICENCES REQUIRED undertaking this work (i.e. Certificates of Competency, Confined Spaces etc.):
All work to comply with the JL requirements and H&S Acts and Regulations and amendments, Workplace Injury Management & Workers Compensation Acts
Serial Plant/Equipment Contractor Government Plant Hazards Maintenance/service records and logbooks sighted
Registration No. identified and by Principal Contractor prior to equipment being
controlled within used on site?
(Where applicable)
WMS?
Yes No Sign\ Date
1
2
3
ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & Signature License Number Test Date Result Test Date Result
Number
____ /____ /____ ____ /____ /____
____ /____ /____ ____ /____ /____
HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if applicable):
MSDS
Date on Purpose Location & Volume Controls
Date Left Site Product Name MSDS Date Attached
Site (i.e. Application on site) Used on Site (& PPE to be worn)
(Y/N)
/ / / / / /
/ / / / / /
/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as
per the waste disposal methods in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.
We agree that we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Work Method Statement
(WMS).
We have been provided with training in all tasks outlined in our WMS and in the Codes of Practice applicable to our work.
2. / / 9. / /
3. / / 10. / /
4. / / 11. / /
5. / / 12. / /
6. / / 13. / /
Any changes, additions or deletions made to this WMS are to be covered with the above personnel and the Principal Contractor’s representative at a Toolbox
meeting (Record date and time of Toolbox meeting below):
Date: Time:
Comments: