Block Work Safe Work Method Statement

The document provides a safe work method statement for block work. It outlines delivering building materials by truck to a storage yard, unloading materials manually using a pallet jack, and transporting them to the work area via a service lift. Potential hazards include vehicle accidents during delivery, ergonomic strains from lifting heavy bags, and chemical exposure. Control measures require permits for vehicle entry, speed limits, barricades during unloading, weight limits for manual lifting, and use of personal protective equipment like gloves and masks. The supervisor is responsible for ensuring all control measures are followed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views16 pages

Block Work Safe Work Method Statement

The document provides a safe work method statement for block work. It outlines delivering building materials by truck to a storage yard, unloading materials manually using a pallet jack, and transporting them to the work area via a service lift. Potential hazards include vehicle accidents during delivery, ergonomic strains from lifting heavy bags, and chemical exposure. Control measures require permits for vehicle entry, speed limits, barricades during unloading, weight limits for manual lifting, and use of personal protective equipment like gloves and masks. The supervisor is responsible for ensuring all control measures are followed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Revised -0 Safe Work Method Statement RAMS No :08

Project Name: GOOGLE CONECT SERVICES INDIA PVT LIMITED

Company Name: NARSI Activity/Trade: Block work

Details : Equipment ,Tools & tackles Spec:

Aerocon block Wheel barrow


Jointing compound Chipping machine
Hoe
Hammer
Hacksaw blade with frame
Steel trowel
Scaffold

Mandatory PPE’s: Safety Helmets, Reflective jacket, , Hand gloves, Safety shoe, Nose mask– Mixing of paint with water

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
1 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Block and jointing compound  Builder permit and ID to be taken from KNIGHT
material (20kg/bag) will FRANK
delivered b truck and parked  The following documents to be enclosed before
at B-2 under monitoring of Vehicle accident E permit the vehicle.
safety marshal along with  Vehicle documents(Registration and Insurance, L EHS
flags man.. (Restricted Height PUC) supervisor /
is Below 2.4M)  Driver License with valid date Site
Vehicle entry at Gate 2 and  Speed limit is 6kmph at inside the campus. supervisor
Exit at Gate 3  logistic plan to be explained to the driver by
Transport the materials to B-2 supervisor and flag man.
storage yard in Cambridge  Supervisor and flags man will walk with TATA truck
Block from entrance to unloading point B2)
 Stop the other tenant vehicle movement by TRIL
security, while entering and reversing the vehicle.
 Proper Barricade the Truck with cone and tape while
unloading
 Baton Light will be used at night and dark locations

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
2 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Unloading of block and Ergonomic hazards  Ensured safe access & no trip hazards
jointing compound material Fall of Materials  MSDS will be submitted before storing EHS
(20kg/bag)) by manually and Chemical hazard. H  Weight limit for male –20kgs L supervisor /
hydraulic pallet jack will be  Provide ratchet rope to tie the material over the Site
used for shifting of from B2 to trolley. supervisor
the floor via service lift.  Workers engaged are trained on materials handling
 Use the job specific PPEs (Helmet, hand gloves,
Weight = 20kg jointing googles, safety shoes and nose mask)
compound and blocks  Materials will not be shifted through stair case
without the permission of JLL and AZE.
 Training should be given on chemical handling, ppe
uses.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
3 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Jointing compound (6bags in Ergonomic hazards  MSDS should submit before unload the
each pallet) will be unloaded Fall of material material.
by Manual stacker and that Chemical hazard  Provide heavy duty ISI MARKED cut resistant EHS
forks will be inserted inside Hydraulic trolley failure. E hand gloves to all the workers. L supervisor /
the pallet (after moving the  Place materials on the hydraulic trolley and Site
truck slowly release the tighten the materials to the trolley with certified supervisor
hydraulic brake to unload) ratchet rope (TPI CAERTIFICATE).
 Ensure hydraulic trolley valid MTC to be
submitted and approved by JLL team.
 Ensure display of SWL on hydraulic trolley.
 Move the trolley from B2 to the service lift and
shift the trolley to the 10th & 11th floor.
 Do not shift the material through stair case.
 Ensure effective training on manual
handling ,mechanical handling and stocking of
materials and MSDS.
 Basic personal protective equipment (safety
helmet, safety shoes,reflective jacket, Hand
gloves,dust mask) to be provided for workers.
 Ensure all PPE s are with valid certificate.
 Ensure there are no trip hazards at floor.
 Ensure floor conditions before planning of work.
 Ensure the floor protection is in the place to
avoid the damage of the granite on the 10th
floor lift lobby
 Do not load more than service lift capacity.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
4 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE

 Instruct worker not to panic, Call emergency


number displayed in the service lift
 Follow the instructions given by the lift operator.
Instruct them to communicate through the
telephone inside.
 Provide floor protection lay on the floor.
 Covering sheet should be used to avoid dust on
floor
 Putty Bags will be tied with pallet by ratchet
rope.
 Access will be kept free from obstacle while
shifting.
 Effective supervision will be maintained for this
particular activity and all individual activities.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
5 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Blocks and jointing Failure of service lift  Instruct worker not to panic
compound material shifting  Call emergency number displayed in the service lift
from B2 to Work station via Break down of service lift  Do not load more than 1.5 ton
service lift by using of trolley H  Follow the instructions given by the lift operator L EHS
Collapse of material while shifting.  Instruct them to communicate through the telephone supervisor /
Damage of granite floor(Lift lobby) inside Site
 Stop the other tenant vehicle to avoid accidents supervisor
 Paint materials, Putty Bags will be tied with pallet by
ratchet rope along with trolley during shifting
 Provide floor protection lay on the floor.
 Access will be cleaned while shifting.
 Basic ppes (safety shoes, goggles , safety helmets,
high vis jacket, hand gloves)

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
6 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Area preparation  Unauthorized entry  Ensure worker should attend the TBT before Site
start the work. supervisor
 Hazardous substances  Ensure working area should be properly and EHS
barricaded. officer
 Falling Material  Ensure workers are working right tool for the
right task. L
 Dust M  Ensure the area should free from all UG
services.
 Ensure the area should free from hazardous
materials.
 Ensure wearing hard hat a site and following
color code.
 Ensure having adequate drinking water
facilities.
 Ensure workers wearing appropriate nose
mask.
 Ensure man moment at designated walkways.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
7 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Preparation of mortar of ratio  Falling materials  Ensure training should conduct for all workers. Site supervisor
1:4 in Machine for placing of 1st  Ensure working area should be properly and EHS
layer of blocks.  Unauthorized entry barricade. officer
M L
 Ensure working area should be safe to access.
 Slip, Trip hazard  Ensure using compulsory gumboot, hand
gloves, nose mask, goggles, and helmet while
 Dust exposure mixing.
 Ensure working areas are clean and tidy after
 Noise exposure finishing work.
 Ensure materials are kept away from working
 Electrocution area.
 Ensure using floor protection sheet while mortar
 Chemical spillages mixing.
 Ensure working areas are free from overhead
lines, UG lines, and distribution line.
 Ensure working areas having adequate
illumination.
 Ensure working areas are free from spillages
and Hazardous substances.
 Ensure working areas are free from noise and
dust.
 Ensure that power tools are inspected and it
should be in green tagged
 Follow the cable management system at work
place
 Once finishes the work must be unplugged the
electrical tools from DB box.
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
8 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Construction of cooping / lintel  Slip, Trip Hazard  Ensure worker should attend the training before Site supervisor
reinforcement of 12mm dia of start the work. and EHS
4nos main bars and  Falling Materials  Ensure working area should be properly officer
12mm dia stirrups at 300mm at barricaded.
every 1m height.  Collapse  Ensure placing area should be in safe zone.
M
H  Ensure placing area should be in free from dust.
 Electrical Hazard  Ensure whenever possible, avoid working under
moving loads.
 Temperature  Ensure replace damaged or frayed electrical
wires are passing through in working area.
 Dust Exposure  Ensure minimize the potential for water or
chemical spills on or near electrical equipment.
 Ensure to use safe work practices every time
electrical equipment is used.
 Ensure having adequate level of drinking water
facilities at site.
 Ensure always wear hard hats when work is
being performed overhead.
 Ensure workers using right tool for the right
task.
 Ensure whenever possible, avoid working under
moving loads and overhead lines.

Mobile Scaffold Erection and  Height work permit should obtain after comply
dismantling and work on  Erection and Dismantle by permit requirements.
scaffold un trained workers Fall  Deploy trained person to erect the scaffold and
E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
9 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Hazard the scaffolding erection should supervised and
 Struck Hazard to be certified by the site certified scaffolder in
 Scaffolding Collapse charge or authorized personnel only M EHS
 Electrocution H  Scaffolding checklist to be done and display the supervisor /
 Collapse of scaffold SWL & tag. Site
 Hitting to the structure  Do not move the scaffold while person on supervisor
platform.
 Provide Rails (Hand & Mid), toe boards & open
door platform before use.
 Provide the wheels in good condition.
 Only two persons are allowed on the platform
 Ensure that working area have the sufficient
lighting
 Do not use the mobile phones on working at
height
 Ensure workers are safe to access and wheel
bars are locked properly, free from power lines.
 For height work all the labours are to be trained
 Provide PPE’s (safety helmet, safety shoes,
hand glove and nose mask and safety harness).

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
10 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
11 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Control Measures Person who


Procedure (in steps) Possible Hazards Risk (Describe what action or procedure will be taken to Risk will ensure
Rating eliminate or minimise the risk of injury or damage. Use controlled this happens
(Break the job down into (Identify the hazards associated with (See the Hierarchy of Controls below as a guide level
steps. Each step should each step. Examine each to find below) 1. Eliminate the Hazard2. Substitute the material or
accomplish some major task possibilities that could lead to an equipment
and be in logical sequence.) accident or potential harm arising.) 3. Isolate the hazard4. Implement Engineering control
5. Implement Administrative control 6.PPE
Using Of Step Ladders Collapse of Step ladder M  Use Certified Step ladders L EHS
 Step ladders with hand rails will be used supervisor /
 Height work permit will be taken if working Site
height is 1.8m supervisor
 Damaged and defective ladders will not be
allowed in site
 One person should hold the ladder while
accessing & working in ladder
 Materials will not be stacked in ladder.
 Work area will be barricaded under work
supervision.
 Ladder checklist will be maintained .
 Tag system will be followed for using the ladder
in site. Green tagged ladders will be used in
site.

 Remove the unwanted materials from the floor


Floors cleaning and final Foreign particle entry into eyes.  Ensure full time supervision EHS
Housekeeping in the location Skin irritation.  Use allocated dustbins properly supervisor /
Slip and trip M  Provide certified PPE’s (safety helmet, safety L Site
Dust inhalation shoes, cut resistant hand glove, nose mask, supervisor
Muscle contraction and safety glasses)
 Using certified vacuum cleaner for floor
cleaning
 Fallow the cable management

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
12 of 16
Revised -0 Safe Work Method Statement RAMS No :08

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (i.e.: Nil LTI)
Document Name: BLOCK WORK SWSMS Page No.
13 of 16
Safe Work Method Statement

Personnel Summary

SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name: Vasanth
Experience: 13

Qualifications: Diploma
Supervisor’s Responsibilities: 1) Implementation of all control measures effectively.
2) Effective supervision.
3) Ensure effective control on health & environmental hazard.
4) Daily inspection and requesting to work permit
5) Communicating to the site in charge in case of any emergencies.
DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK

H&S GENERAL INDUCTION: -

WORK ACTIVITY TRAINING: Height Work

SITE INDUCTION:AZ HSE induction

OTHER:(List other training undertaken by workers):

TICKETS, PERMITS or LICENCES REQUIRED undertaking this work (i.e. Certificates of Competency, Confined Spaces etc):

N.B. -
LEGISLATION, CODES OF PRACTICE and GUIDELINES applicable to this work

All work to comply with the KNIGHT FRANK requirements and H&S Acts and Regulationsand amendments, Workplace Injury Management & Workers
Compensation Acts

Additional Codes and Standards applicable to this trade:

Document Name: Version Correct as at: Page No.


BLOCK WORK SWMAS 03 10 Jun 12 14 of 16
Revised -0 Safe Work Method Statement RAMS No :08

Equipment & Material Summary

PLANT and EQUIPMENT usedand MAINTENANCE FREQUENCY:

Serial Plant/Equipment Contractor Government Plant Hazards Maintenance/service records and log books sighted
Registration No. identified and by Principle Contractor prior to equipment being
controlled within used on site?
(Where applicable)
WMS?
Yes No Signp\ Date

1
2
3

ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & Signature License Number Test Date Result Test Date Result
Number
____ /____ /____ ____ /____ /____
____ /____ /____ ____ /____ /____
HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if applicable):
MSDS
Date on Purpose Location & Volume Controls
Date Left Site Product Name MSDS Date Attached
Site (ie. Application on site) Used on Site (& PPE to be worn)
(Y/N)
/ / / / / /

/ / / / / /

/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as
per the waste disposal methods in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.

Document Name: Version Correct as at: Page No.


03 10 Jun 12 15 of 16
Revised -0 Safe Work Method Statement RAMS No :08

We agreethat we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Work Method Statement
(WMS).
We have been provided with training in all tasks outlined in our WMS and in the Codes of Practice applicable to our work.

Employee / Worker Signature Date Employee / Worker Signature Date


1. / / 8. / /
2. / / 9. / /
3. / / 10. / /
4. / / 11. / /
5. / / 12. / /
6. / / 13. / /

Reviewed by: Signature: Date:


(Principal Contractor’s Representative)

Any changes, additions or deletions made to this WMS are to be covered with the above personnel and the Principal Contractor’s representative at a Toolbox
meeting (Record date and time of Toolbox meeting below):

Date: Time:
Comments:

A copy of the Toolbox Meeting must be attached to this SWMS.