LV Network

The document outlines the electrical design and specifications for a low voltage network, including details on cable entries, transformers, and distribution panels. It includes general notes for construction, such as obtaining necessary permits and installation guidelines for cables. The document also features a key plan and various electrical components essential for the project.

Uploaded by

engr.asim25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views10 pages

LV Network

The document outlines the electrical design and specifications for a low voltage network, including details on cable entries, transformers, and distribution panels. It includes general notes for construction, such as obtaining necessary permits and installation guidelines for cables. The document also features a key plan and various electrical components essential for the project.

Uploaded by

engr.asim25
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FE

C-
01

04 PR
GE OVI
SW N-SE SION
ITC T D FO
H, ISC R
250 O
TO 0A NNE
CT
PA BUIL MO
(SM NELB DING PR BILE
DB OA OV G
) RD ISI ENS
ELE ON ET
HA CTRI
N D
(60 HO L CA
(PA 0x60 LE
EL RT 0mm 2.6
4

OF
MA ECTR BU x600 D/S S/

0
6.3
(60 NHO ICAL ILD mm
15 S-BT
2.1
4

0x6 LE ING )
SC 00 -
kV 01

LVDB
OPENING
CABLE
ENTRY
00m

2W

1W
2V
1V
2U

TRANSFORM
OP

2N

TRANSFORM
1U

SECTION
ER

ER
LVDB
OPENING
CABLE
EO A

ENTRY
m)

RMU
SECTION

HV

0
OPENINGENTRY
CABLE

5.1
FW 3.6
0

OR
K)
SL
P-1
FP
-SE
C-0
1
2-1 EV
DU 10m EV C-0 9-1
CT m Ø C-0
5 4 DU 10mm
BA CT
NK BA Ø
EV EV NK
2-1 C-0 C-0
2 FE
DU 10m 3 C-
CT mØ 06
BA EV
NK C-0
SL 1
P-2

FE
C-
02
4-1 4-1
D U 10m DU 10m
CT mØ CT mØ
BA BA
NK NK

2- 1
D U 10m
CT mØ
BA
NK
FE
C-
03
DP
-S/
S-B
T-01
2-1
05
DU 10m
CT mØ
BA
NK

4-1 FE
DU 10m C-
CT mØ 04
BA
NK

FE
2- 1 C-
DU 10m 05
CT mØ
BA
NK

FP EL
-SE
C-0 MA ECTR
2 6-1 (60 NHO ICAL
DU 10mm 0x6 LE
00m
CT
BA Ø m)
NK

FEC
-09
07 FE
C-
08

SLP-3
IRR
CO IGAT
NT IO
RO N
LLE
R
CLIENT

STAMP SIGNATURE

LEAD ENGINEERING CONSULTANT

sapl
SAUDI ARABIAN PARSONS LTD

Olaya Main Road, PO Box 1174, Riyadh 11431, KSA


Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
STAMP SIGNATURE

EXECUTIVE ARCHITECT / AOR:

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11002


SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

01

02
04

03
05

PROVISION FOR 06

07

GEN-SET DISCONNECT
SWITCH, 2500A
GENERAL NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. CONTRACTOR SHALL OBTAIN THE NECESSARY WORK PERMITS PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELATED LV NETWORK

MOBILE GENSET 4.
SINGLE LINE DIAGRAM.
THE MV / LV CABLES SHALL BE LAID ON THEIR R.O.W. AS DIRECT BURIED CABLES AND AT
VARIOUS ROAD CROSSINGS, THE MV CABLES SHALL BE INSTALLED IN 160mm DIA. DUCT
BANKS AND LV IN 110mm DIA. DUCT BANKS UNLESS OTHERWISE NOTED.

PROVISION 6.

7.
DUCTS OR ROAD CROSSING WILL BE ENCASED BY CONCRETE AND EXTENDED UP TO
ROAD SERVICE TO AVOID ROAD ASPHALT CUTS IN THE FUTURE
ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES.

LEGEND:
S/S-BT-01

S/S-BT-01
1500 kVA, 3 PHASE, 33/0.4 kV PACKAGE SUBSTATION
TRANSFORMER
SECTION
HV CABLE ENTRY
OPENING
TRANSFORMER

1W 1V 1U

2W 2V 2U 2N

RMU SECTION

LVDB CABLE ENTRY LVDB CABLE ENTRY


OPENING OPENING

DP-S/S-01
2.64 DISTRIBUTION PANEL, 3 PHASE 400 VOLTS

D/S 1500 kVA


SLP-1
STREET LIGHTING PANEL, 3 PHASE 400 VOLTS
FP-SEC-02
FEEDER PILLAR, 3 PHASE 400 VOLTS FOR SECURITY CCTV
FEC
2.14 FIELD EQUIPMENT CABINET, 400/230 VOLTS FOR SECURITY CCTV

D/S 2500A, 3P, 3-PHASE, 400V, DISCONNECT SWITCH / ENCLOSED

6.30

1W
MAIN CIRCUIT BREAKER

2W

TRANSFORMER

TRANSFORMER
LVDB CABLE ENTRY

2V

SECTION
OPENING

1V
2U
2N

1U
TO BUILDING 0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE

5.10
4C-300mm² CU/XLPE/SWA/PVC + 150mm² PVC (E)

LVDB CABLE ENTRY


LV LV LV LV LV LV LV LV LV LV

RMU SECTION

HV CABLE ENTRY
4C-95mm² CU/XLPE/SWA/PVC + 50mm² PVC (E)

OPENING

OPENING
4C-70mm² CU/XLPE/SWA/PVC + 35mm² PVC (E)

PANELBOARD 3.60
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-25mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)
4C-16mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)

FEC-01 (SMDB) 0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


4C-10mm² CU/XLPE/SWA/PVC + 10mm² PVC (E)
4C-6mm² CU/XLPE/SWA/PVC + 6mm² PVC (E)
2-110mm Ø
2 - WAY CONCRETE DUCT BANK

ELECTRICAL
HANDHOLE N1
N0
ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
22/12/2024
28/11/2024

(600x600mmx600mm) REV.
PROJECT
REASON FOR ISSUE DATE

(PART OF BUILDING SCOPE OF WORK) AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL
SLP-1
BUILDING NAME N/A

PLOT NUMBER N/A

9-110mmØ DRAWING TITLE

DUCT BANK LOW VOLTAGE NETWORK


SHEET 01 OF 07

MODEL FILE REFERENCE


1RI12078-078D08-SAP-00-ZZ-MOD-LV-00001
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 1:250


DRAWING NUMBER REVISION

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11004 1RI12078-078D08-SAP-00-XX-DWG-LV-11001 N1


CLIENT

STAMP SIGNATURE

LEAD ENGINEERING CONSULTANT

sapl
SAUDI ARABIAN PARSONS LTD

Olaya Main Road, PO Box 1174, Riyadh 11431, KSA


Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
STAMP SIGNATURE

EXECUTIVE ARCHITECT / AOR:

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE
FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11001

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11003


SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

01

02
04

03
05
06

07

GENERAL NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. CONTRACTOR SHALL OBTAIN THE NECESSARY WORK PERMITS PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELATED LV NETWORK
SINGLE LINE DIAGRAM.
4. THE MV / LV CABLES SHALL BE LAID ON THEIR R.O.W. AS DIRECT BURIED CABLES AND AT
VARIOUS ROAD CROSSINGS, THE MV CABLES SHALL BE INSTALLED IN 160mm DIA. DUCT
BANKS AND LV IN 110mm DIA. DUCT BANKS UNLESS OTHERWISE NOTED.
6. DUCTS OR ROAD CROSSING WILL BE ENCASED BY CONCRETE AND EXTENDED UP TO
ROAD SERVICE TO AVOID ROAD ASPHALT CUTS IN THE FUTURE
7. ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES.

LEGEND:
S/S-BT-01
1500 kVA, 3 PHASE, 33/0.4 kV PACKAGE SUBSTATION
TRANSFORMER
SECTION
HV CABLE ENTRY
OPENING
TRANSFORMER

1W 1V 1U

2W 2V 2U 2N

RMU SECTION

LVDB CABLE ENTRY LVDB CABLE ENTRY


OPENING OPENING

DP-S/S-01
DISTRIBUTION PANEL, 3 PHASE 400 VOLTS
SLP-1
STREET LIGHTING PANEL, 3 PHASE 400 VOLTS
FP-SEC-02
FEEDER PILLAR, 3 PHASE 400 VOLTS FOR SECURITY CCTV
FEC
FIELD EQUIPMENT CABINET, 400/230 VOLTS FOR SECURITY CCTV

D/S 2500A, 3P, 3-PHASE, 400V, DISCONNECT SWITCH / ENCLOSED


MAIN CIRCUIT BREAKER

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


4C-300mm² CU/XLPE/SWA/PVC + 150mm² PVC (E)
LV LV LV LV LV LV LV LV LV LV

4C-95mm² CU/XLPE/SWA/PVC + 50mm² PVC (E)


4C-70mm² CU/XLPE/SWA/PVC + 35mm² PVC (E)

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV

4C-25mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)


4C-16mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)
0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-10mm² CU/XLPE/SWA/PVC + 10mm² PVC (E)
4C-6mm² CU/XLPE/SWA/PVC + 6mm² PVC (E)
2-110mm Ø
2 - WAY CONCRETE DUCT BANK

N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
FEC-06 REV. REASON FOR ISSUE DATE
PROJECT

AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL

BUILDING NAME N/A

PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


SHEET 02 OF 07

MODEL FILE REFERENCE


1RI12078-078D08-SAP-00-ZZ-MOD-LV-00001
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 1:250


DRAWING NUMBER REVISION

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11005 1RI12078-078D08-SAP-00-XX-DWG-LV-11002 N1


2500A
D/S
3x400mm2AL/XLPE/LLDPE/PVC
33kV COPPER CABLE
CBL-A2-01600 / LOOP-7
3x400mm2AL/XLPE/LLDPE/PVC
33kV COPPER CABLE
CBL-A2-01601 / LOOP-7
G PROVISION FOR STANDBY
MOBILE GENERATOR
4 SETS (4x1C-630mm2 CU/XLPE/SWA/PVC+
300mm² CU/PVC), L=10m, VD=0.001%
CONTROL SECTION S/S-BT-01 RTU
TCL = 1,351.00 kVA
TDL = 1,339.46 kVA NO SMART RMU CLIENT
TCDL = 975.82 kVA 400A 400A SF6 INSULATED
MDL20% = 1,170.99 kVA 400A, 33KV
200A 25KA FOR 1 SEC.
ACB
3x1C-50mm2 (36KV)
TRANSFORMER COPPER CABLE
1500 kVA STAMP SIGNATURE
33 kV/400V
DyN 11, 6.0%
LVDB 2500A
0-500V LEAD ENGINEERING CONSULTANT
BUSBAR

BMS
COPPER LINK
V

kWh
sapl
SAUDI ARABIAN PARSONS LTD
kWh 3CTS 3CTS
INTERFACE VSS
A ASS 2500/5A 2500/5A ASS A
0-2500A 0-2500A Olaya Main Road, PO Box 1174, Riyadh 11431, KSA
2500AT 2500AT
E&M Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
MAIN BUS 2500A, 400V/231V, 60Hz, 2500AF 2500AF STAMP SIGNATURE
CU, 3P+N+G, 40kA FOR 3 SECS. 4P ACB 4P ACB
1 2 3 4 5 6 7 8 9 10

EXECUTIVE ARCHITECT / AOR:

200AT 100AT 630AT 630AT 630AT 630AT 630AT 200AT 200AT


250AF 200AF 630AF 630AF 630AF 630AF 630AF 250AF 200AF
Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE
SPACE FOR 70mm2 GROUNDING
HARMONIC FILTER CABLE (E)
PROVISION
SIGNATURE / DESIGN ARCHITECT
4C-95mm2 CU/XLPE/SWA/PVC+
50mm² CU/PVC, L=65m, VD=0.82%

4C-70mm2 CU/XLPE/SWA/PVC+ Address______________________________


35mm² CU/PVC, L=115m, VD=1.31% Tel: _____________, Fax: ______________ www.anycompany.com

4C-300mm2 CU/XLPE/SWA/PVC+ CONSTRUCTION PROCUREMENT


150mm² CU/PVC, L=95m, VD=1.35% KEY PLAN
2
4C-300mm CU/XLPE/SWA/PVC+
150mm² CU/PVC, L=100m, VD=1.42%

4C-300mm2 CU/XLPE/SWA/PVC+
150mm² CU/PVC,L=105m, VD=1.49%

4C-300mm2 CU/XLPE/SWA/PVC+
150mm² CU/PVC,L=110m, VD=1.56%

4C-300mm2 CU/XLPE/SWA/PVC+
150mm² CU/PVC,L=115m, VD=1.63%

4C-95mm2 CU/XLPE/SWA/PVC+
GENERAL NOTES
50mm² CU/PVC, L=30m, VD=0.001%
LOAD 1. THE CONTRACTOR SHALL SUBMIT THE TECHNICAL DATA OF ALL THE EQUIPMENT TO SEC
FOR REVIEW AND APPROVAL.
MANAGEMENT 2. FOR THE MEDUIM VOLTAGE DISTRIBUTION FEEDER LAYOUTS, REFER TO DWG. NO.
1RI12078-078D08-SAP-00-XX-DWG-LV-10001
SYSTEM AT 3. ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES
0.70 D.F.
LEGEND:

METER INSIDE PANEL SPARE


SMDB-TOB-01 EVC-01 EVC-02 EVC-03 EVC-04 EVC-05 PFC-BT-01 TO DP-S/S-BT-01 TO DP-S/S-BT-01 AIR CIRCUIT BREAKER (ACB)

TCL:80.85 kVA TDL=242.42 kVA TDL=242.42 kVA TDL=242.42 kVA TDL=242.42 kVA TDL=242.42 kVA 100 kVAR PFC 2
4C-16mm CU/XLPE/SWA/PVC+ 2
4C-16mm CU/XLPE/SWA/PVC+ 1500 kVA, 33/0.4kV, TRANSFORMER, PACKAGE
MDL=76.30 kVA TCDL=169.70 kVA TCDL=169.70 kVA TCDL=169.70 kVA TCDL=169.70 kVA TCDL=169.70 kVA 16mm²CU/PVC, L=105m, VD=2.49% 16mm²CU/PVC, L=110m, VD=2.36%
SUBSTATION

BUS BAR COPPER


DP-S/S-BT-01 6A MCB FP-SEC-01 6A MCB FP-SEC-02 6A MCB
TCL= 58.03 kVA 100AT TCL= 11.44 kVA 40AT TCL= 7.68 kVA 40AT MOULDED CASE CIRCUIT BREAKER (MCCB)
200AF, 20kA 100AF, 10kA 100AF, 10kA
MFM

MFM

MFM
MDL=51.04 kVA TDL= 11.44 kVA TDL= 7.68 kVA
BMS 400A, 4W+E BMS BMS
(3P) MCCB (3P) MCCB 100A, 4W+E (3P) MCCB 100A, 4W+E
INTERFACE 16kA FOR 3 SECS. INTERFACE 10kA FOR 3 SECS. INTERFACE 10kA FOR 3 SECS.
KILOWATT- HOUR METERING

63AT 40AT 40AT 40AT 40AT 40AT 40AT 40AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 20AT 30AT 20AT 30AT
100AF 100AF 100AF 100AF 100AF 100AF 100AF 100AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF 63AF
3P 3P 3P 3P 3P 3P 3P 3P 1P 1P 1P 1P 1P 1P 1P 1P 1P 1P 1P 1P

35mm2 E 4C-25mm2 CU/XLPE/SWA/PVC+ 10mm2 E 10mm2 E


16mm²CU/PVC, L=125m, VD=2.93%
2C-10mm2 CU/XLPE/SWA/PVC+ 2C-10mm2 CU/XLPE/SWA/PVC+
2 10mm²CU/PVC, L=110m, VD=3.06% 10mm²CU/PVC, L=172m, VD=3.12%
4C-25mm CU/XLPE/SWA/PVC+
16mm²CU/PVC, L=90m, VD=1.50% N2 ISSUED FOR CONSTRUCTION 01/01/2025
2C-10mm2 CU/XLPE/SWA/PVC+ 2C-10mm2 CU/XLPE/SWA/PVC+ N1 ISSUED FOR CONSTRUCTION 22/12/2024
4C-25mm2 CU/XLPE/SWA/PVC+ 10mm²CU/PVC, L=80m, VD=2.91% 10mm²CU/PVC, L=115m, VD=2.87% N0 ISSUED FOR CONSTRUCTION 28/11/2024
16mm²CU/PVC, L=80m, VD=1.48% REV. REASON FOR ISSUE DATE
2C-10mm2 CU/XLPE/SWA/PVC+ 2C-10mm2 CU/XLPE/SWA/PVC+
2 PROJECT
4C-25mm CU/XLPE/SWA/PVC+ 10mm²CU/PVC, L=70m, VD=2.87% 10mm²CU/PVC, L=205m, VD=3.35%
16mm²CU/PVC, L=225m, VD=1.60%
2C-10mm2 CU/XLPE/SWA/PVC+ 2C-6mm2 CU/XLPE/SWA/PVC+ AMAALA STAFF VILLAGE
2
4C-16mm CU/XLPE/SWA/PVC+ 10mm²CU/PVC, L=110m, VD=3.16% 6mm²CU/PVC, L=60m, VD=2.38% STAFF PASSENGER
16mm²CU/PVC, L=105m, VD=2.40% INTERCHANGE TERMINAL
METER INSIDE PANEL 2C-10mm2 CU/XLPE/SWA/PVC+
2
4C-16mm CU/XLPE/SWA/PVC+ 10mm²CU/PVC, L=150m, VD=3.42%
16mm²CU/PVC, L=110m, VD=2.07% BUILDING NAME N/A

DB-Q1-GF SLP-1 SLP-2 SLP-3 FP-SEC-01 FP-SEC-02 FEC - 1 FEC - 2 FEC - 3 FEC - 4 FEC - 5 SPARE FEC - 6 FEC - 8 FEC - 9 IRRIGATION SPARE SPARE
SPARE SPARE PLOT NUMBER N/A
CL=29.41 kVA CL=3.65 kVA CL=3.64 kVA CL=2.21 kVA CL=11.44 kVA CL=7.68 kVA CL=2.10 kVA CL=2.22 kVA CL=2.35 kVA CL=2.42 kVA CL=2.35 kVA CL=2.10 kVA CL=2.42 kVA CL=2.16 kVA CONTROL PANEL
DL=22.42 kVA DL=3.65 kVA DL=3.64 kVA DL=2.21 kVA DL=11.44 kVA DL=7.68 kVA DL=2.10 kVA DL=2.22 kVA DL=2.35 kVA DL=2.42 kVA DL=2.35 kVA DL=2.10 kVA DL=2.42 kVA DL=2.16 kVA CL=1.00 kVA DRAWING TITLE
DL=1.00 kVA
LOW VOLTAGE NETWORK
SINGLE LINE DIAGRAM

MODEL FILE REFERENCE


N/A
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 01/01/2025 N.T.S


DRAWING NUMBER REVISION
1RI12078-078D08-SAP-00-XX-DWG-LV-60001 N2
FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11002

CLIENT

2-110mmØ STAMP SIGNATURE

DUCT BANK LEAD ENGINEERING CONSULTANT

sapl
SAUDI ARABIAN PARSONS LTD

Olaya Main Road, PO Box 1174, Riyadh 11431, KSA


Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
STAMP SIGNATURE

EXECUTIVE ARCHITECT / AOR:

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE
FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11004

SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

01

02
04

03
05
06

07

GENERAL NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. CONTRACTOR SHALL OBTAIN THE NECESSARY WORK PERMITS PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELATED LV NETWORK
SINGLE LINE DIAGRAM.
4. THE MV / LV CABLES SHALL BE LAID ON THEIR R.O.W. AS DIRECT BURIED CABLES AND AT
VARIOUS ROAD CROSSINGS, THE MV CABLES SHALL BE INSTALLED IN 160mm DIA. DUCT
BANKS AND LV IN 110mm DIA. DUCT BANKS UNLESS OTHERWISE NOTED.
6. DUCTS OR ROAD CROSSING WILL BE ENCASED BY CONCRETE AND EXTENDED UP TO
ROAD SERVICE TO AVOID ROAD ASPHALT CUTS IN THE FUTURE
7. ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES.

LEGEND:
S/S-BT-01
1500 kVA, 3 PHASE, 33/0.4 kV PACKAGE SUBSTATION
TRANSFORMER
SECTION
HV CABLE ENTRY
OPENING
TRANSFORMER

1W 1V 1U

2W 2V 2U 2N

RMU SECTION

LVDB CABLE ENTRY LVDB CABLE ENTRY


OPENING OPENING

DP-S/S-01
DISTRIBUTION PANEL, 3 PHASE 400 VOLTS
SLP-1
STREET LIGHTING PANEL, 3 PHASE 400 VOLTS
FP-SEC-02
FEEDER PILLAR, 3 PHASE 400 VOLTS FOR SECURITY CCTV
FEC
FIELD EQUIPMENT CABINET, 400/230 VOLTS FOR SECURITY CCTV

D/S 2500A, 3P, 3-PHASE, 400V, DISCONNECT SWITCH / ENCLOSED


MAIN CIRCUIT BREAKER

ELECTRICAL LV LV LV LV LV LV LV LV LV LV
0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-300mm² CU/XLPE/SWA/PVC + 150mm² PVC (E)
4C-95mm² CU/XLPE/SWA/PVC + 50mm² PVC (E)

MANHOLE LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
4C-70mm² CU/XLPE/SWA/PVC + 35mm² PVC (E)

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


4C-25mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)

(600x600mm) 4C-16mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)


0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-10mm² CU/XLPE/SWA/PVC + 10mm² PVC (E)
4C-6mm² CU/XLPE/SWA/PVC + 6mm² PVC (E)
2-110mm Ø
2 - WAY CONCRETE DUCT BANK

N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
REV. REASON FOR ISSUE DATE
PROJECT

AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL

BUILDING NAME N/A

6-110mmØ
DUCT BANK PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


SHEET 05 OF 07

MODEL FILE REFERENCE


1RI12078-078D08-SAP-00-ZZ-MOD-LV-00001
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 1:250


DRAWING NUMBER REVISION

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11007 1RI12078-078D08-SAP-00-XX-DWG-LV-11005 N1


FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11005

FEC-08

CLIENT

IRRIGATION STAMP SIGNATURE

CONTROLLER
LEAD ENGINEERING CONSULTANT

sapl
SAUDI ARABIAN PARSONS LTD

Olaya Main Road, PO Box 1174, Riyadh 11431, KSA


Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
STAMP SIGNATURE

EXECUTIVE ARCHITECT / AOR:

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE
FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11006

SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

01

02
04

03
05
06

07

GENERAL NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. CONTRACTOR SHALL OBTAIN THE NECESSARY WORK PERMITS PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELATED LV NETWORK
SINGLE LINE DIAGRAM.
4. THE MV / LV CABLES SHALL BE LAID ON THEIR R.O.W. AS DIRECT BURIED CABLES AND AT
VARIOUS ROAD CROSSINGS, THE MV CABLES SHALL BE INSTALLED IN 160mm DIA. DUCT
BANKS AND LV IN 110mm DIA. DUCT BANKS UNLESS OTHERWISE NOTED.
6. DUCTS OR ROAD CROSSING WILL BE ENCASED BY CONCRETE AND EXTENDED UP TO
ROAD SERVICE TO AVOID ROAD ASPHALT CUTS IN THE FUTURE
7. ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES.

LEGEND:
S/S-BT-01
1500 kVA, 3 PHASE, 33/0.4 kV PACKAGE SUBSTATION
TRANSFORMER
SECTION
HV CABLE ENTRY
OPENING
TRANSFORMER

1W 1V 1U

2W 2V 2U 2N

RMU SECTION

LVDB CABLE ENTRY LVDB CABLE ENTRY


OPENING OPENING

DP-S/S-01
DISTRIBUTION PANEL, 3 PHASE 400 VOLTS
SLP-1
STREET LIGHTING PANEL, 3 PHASE 400 VOLTS
FP-SEC-02
FEEDER PILLAR, 3 PHASE 400 VOLTS FOR SECURITY CCTV
FEC
FIELD EQUIPMENT CABINET, 400/230 VOLTS FOR SECURITY CCTV

D/S 2500A, 3P, 3-PHASE, 400V, DISCONNECT SWITCH / ENCLOSED


MAIN CIRCUIT BREAKER

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


4C-300mm² CU/XLPE/SWA/PVC + 150mm² PVC (E)
LV LV LV LV LV LV LV LV LV LV

4C-95mm² CU/XLPE/SWA/PVC + 50mm² PVC (E)


4C-70mm² CU/XLPE/SWA/PVC + 35mm² PVC (E)

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV

4C-25mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)


4C-16mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)
0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-10mm² CU/XLPE/SWA/PVC + 10mm² PVC (E)
4C-6mm² CU/XLPE/SWA/PVC + 6mm² PVC (E)
2-110mm Ø
2 - WAY CONCRETE DUCT BANK

N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
REV. REASON FOR ISSUE DATE
PROJECT

AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL

BUILDING NAME N/A

PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


SHEET 07 OF 07

MODEL FILE REFERENCE


1RI12078-078D08-SAP-00-ZZ-MOD-LV-00001
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 1:250


DRAWING NUMBER REVISION
1RI12078-078D08-SAP-00-XX-DWG-LV-11007 N1
FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11004

CLIENT

STAMP SIGNATURE

LEAD ENGINEERING CONSULTANT

sapl
SAUDI ARABIAN PARSONS LTD

Olaya Main Road, PO Box 1174, Riyadh 11431, KSA


Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
STAMP SIGNATURE

EXECUTIVE ARCHITECT / AOR:

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE

FOR CONTINUATION REFER TO 1RI12078-078D08-SAP-00-XX-DWG-LV-11007


SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

SLP-3 01

02
04

03
05
06

07

C - 0 9
FE GENERAL NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.
2. CONTRACTOR SHALL OBTAIN THE NECESSARY WORK PERMITS PRIOR TO THE START OF
CONSTRUCTION ACTIVITIES.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE RELATED LV NETWORK
SINGLE LINE DIAGRAM.
4. THE MV / LV CABLES SHALL BE LAID ON THEIR R.O.W. AS DIRECT BURIED CABLES AND AT
VARIOUS ROAD CROSSINGS, THE MV CABLES SHALL BE INSTALLED IN 160mm DIA. DUCT
BANKS AND LV IN 110mm DIA. DUCT BANKS UNLESS OTHERWISE NOTED.
6. DUCTS OR ROAD CROSSING WILL BE ENCASED BY CONCRETE AND EXTENDED UP TO
ROAD SERVICE TO AVOID ROAD ASPHALT CUTS IN THE FUTURE
7. ALL OUTDOOR EQUIPMENT, PANELS, SHALL BE IP-65, FORM-2B, TYPE 2 IN ACCORDANCE
WITH RSG GUIDELINES.

LEGEND:
S/S-BT-01
1500 kVA, 3 PHASE, 33/0.4 kV PACKAGE SUBSTATION
TRANSFORMER
SECTION
HV CABLE ENTRY
OPENING
TRANSFORMER

1W 1V 1U

2W 2V 2U 2N

RMU SECTION

LVDB CABLE ENTRY LVDB CABLE ENTRY


OPENING OPENING

DP-S/S-01
DISTRIBUTION PANEL, 3 PHASE 400 VOLTS
SLP-1
STREET LIGHTING PANEL, 3 PHASE 400 VOLTS
FP-SEC-02
FEEDER PILLAR, 3 PHASE 400 VOLTS FOR SECURITY CCTV
FEC
FIELD EQUIPMENT CABINET, 400/230 VOLTS FOR SECURITY CCTV

D/S 2500A, 3P, 3-PHASE, 400V, DISCONNECT SWITCH / ENCLOSED


MAIN CIRCUIT BREAKER

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


4C-300mm² CU/XLPE/SWA/PVC + 150mm² PVC (E)
LV LV LV LV LV LV LV LV LV LV

4C-95mm² CU/XLPE/SWA/PVC + 50mm² PVC (E)


4C-70mm² CU/XLPE/SWA/PVC + 35mm² PVC (E)

0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE


LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV

4C-25mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)


4C-16mm² CU/XLPE/SWA/PVC + 16mm² PVC (E)
0.6/1 kV LOW VOLTAGE ARMORED COPPER CABLE
4C-10mm² CU/XLPE/SWA/PVC + 10mm² PVC (E)
4C-6mm² CU/XLPE/SWA/PVC + 6mm² PVC (E)
2-110mm Ø
2 - WAY CONCRETE DUCT BANK

N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
REV. REASON FOR ISSUE DATE
PROJECT

AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL

BUILDING NAME N/A

PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


SHEET 06 OF 07

MODEL FILE REFERENCE


1RI12078-078D08-SAP-00-ZZ-MOD-LV-00001
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 1:250


DRAWING NUMBER REVISION
1RI12078-078D08-SAP-00-XX-DWG-LV-11006 N1
CLIENT

Feeder Pillar

STAMP SIGNATURE

Panel Base
Panel Base

LEAD ENGINEERING CONSULTANT


Hollow Core Concrete
Plinth for Feeder Pillar
Concrete Base
sapl
SAUDI ARABIAN PARSONS LTD
110mm Ø UPVC Ducts

FGL FGL Olaya Main Road, PO Box 1174, Riyadh 11431, KSA
Direct Buried Cables Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com
Incoming / Outgoing Power Cables
STAMP SIGNATURE

TYPICAL SECTION DETAIL EXECUTIVE ARCHITECT / AOR:


UNDERGROUND LV INCOMER CONNECTION
TO DISTRIBUTION PILLAR
TYPICAL LV DISTRIBUTION PANEL TYPICAL LV DISTRIBUTION PANEL SCALE : NTS
SIDE VIEW FRONT VIEW
Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

STAMP SIGNATURE

OUTDOOR COMPACT PACKAGE SUBST


SIGNATURE / DESIGN ARCHITECT

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

RMU G
TRANSFORMER

1 EARTHING SCHEMATIC - TYPICAL FOR OCPS


-

LV PANEL
Ground busbar FEEDER PILLAR

GENERAL NOTES
G

GROUNDING PIT FOR SUBSTATION / LV COVER FILLED WITH GREASE


DISTRIBUTION & LIGHTING PANEL FOR GROUNDING PIT PLAN VIEW

TYPICAL BONDING AND GROUNDING


ARRANGEMENT OF MV/LV PACKAGE UNIT
SECURITY SECTION ICT SECTION
2 EARTHING SCHEMATIC - TYPICAL FOR FEEDER PILLAR
-

FIBER PATCH PANEL FIBER PATCH PANEL


CAT6A PATCH PANEL CAT6A PATCH PANEL
CAT6A PATCH PANEL
1U WIRE MANAGER 1U WIRE MANAGER

DIN RAIL MOUNTED


INDUSTRIAL SWITCH

UPS N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
BATTERY REV. REASON FOR ISSUE DATE
PROJECT
POWER DISTRIBUTION UNIT POWER DISTRIBUTION UNIT
AMAALA STAFF VILLAGE
CABLE COMPARTMENT
STAFF PASSENGER
INTERCHANGE TERMINAL

CONCRETE PEDESTAL BUILDING NAME N/A

FFL FFL PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


STANDARD DETAILS (02 OF 02)
3C-10mm2 CU/XLPE/SWA/PVC
INSIDE 32mmØ DUCTS TO MODEL FILE REFERENCE
NEAREST LV CORRIDOR TO
DISTRIBUTION PANEL BOARD
N/A
FIELD EQUIPMENT CABINET - POWPER SUPLY 32mm DUCTS FROM DRAWN BY CHECKED BY APPROVED BY
NEAREST ICT MANHOLE
HAF GCD MSC
PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 N.T.S


DRAWING NUMBER REVISION
1RI12078-078D08-SAP-00-XX-DWG-LV-50002 N1
CLIENT

STAMP SIGNATURE

C A

140

LEAD ENGINEERING CONSULTANT

38
FINISHED ROAD / SIDEWALK SURFACE OR
FINAL GROUND LEVEL
FINISHED ROAD / SIDEWALK SURFACE OR
FINAL GROUND LEVEL
FINISHED ROAD / SIDEWALK SURFACE OR
FINAL GROUND LEVEL
FINISHED ROAD / SIDEWALK SURFACE OR
FINAL GROUND LEVEL
sapl
SAUDI ARABIAN PARSONS LTD

126
TOP LAYER OF ASPHALT TOP LAYER OF ASPHALT TOP LAYER OF ASPHALT TOP LAYER OF ASPHALT

70 50

70 50

70 50

70 50
126

SECONDARY LAYER OF ASPHALT SECONDARY LAYER OF ASPHALT SECONDARY LAYER OF ASPHALT SECONDARY LAYER OF ASPHALT

B
Olaya Main Road, PO Box 1174, Riyadh 11431, KSA
DETECTABLE WARNING TAPE DETECTABLE WARNING TAPE DETECTABLE WARNING TAPE DETECTABLE WARNING TAPE Tel: +966 11 511 7477, Fax: +966 11 511 7389 www.parsons.com

150

150

150

150
NATIVE BACKFILL NATIVE BACKFILL NATIVE BACKFILL NATIVE BACKFILL STAMP SIGNATURE

650

650

650

650
150

150

150

150
LV FEEDER CABLES LV FEEDER CABLES LV FEEDER CABLES LV FEEDER CABLES

80

80

80

80
Ø75
(DIRECT BURIED) (DIRECT BURIED) (DIRECT BURIED) (DIRECT BURIED) EXECUTIVE ARCHITECT / AOR:

D
80

80

80

80
FINE SAND BACK FILL FINE SAND BACK FILL FINE SAND BACK FILL FINE SAND BACK FILL

70

70

70

70
200 200 150 100 150 150 100 100 150 150 100 100 100 150 Address______________________________
400 400 500 600 Tel: _____________, Fax: ______________ www.anycompany.com

E
STAMP SIGNATURE
1 FEEDER 2 FEEDERS 3 FEEDERS 4 FEEDERS

SIGNATURE / DESIGN ARCHITECT


A SIDE VIEW B FRONT VIEW

Address______________________________
Tel: _____________, Fax: ______________ www.anycompany.com

CONSTRUCTION PROCUREMENT
KEY PLAN

FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR
FINAL GROUND LEVEL FINAL GROUND LEVEL FINAL GROUND LEVEL FINAL GROUND LEVEL FINAL GROUND LEVEL
200

200

200

200

200
DETECTABLE WARNING TAPE
(TYPICAL)
500

500

500

500

500
300

300

300

300

300
RED CONCRETE
ON TOP OR SOIL BACKFILL SOIL BACKFILL
SOIL BACKFILL PAINTED RED SOIL BACKFILL SOIL BACKFILL
(TYPICAL)

GENERAL NOTES
300

300

300

300

300
500

110 mmØ uPVC CONDUITS


(TYPICAL) C TOP VIEW
BASE SPACER
200

800

800

800

800
(TYPICAL)
300

300

300

300
150 250 150
550
200

200

200

200
A B C D E

DIMENSION (mm) 800 830 310 280 600


150 250 150 150 250 250 150 150 250 250 250 150 150 250 250 250 250 150
550 800 1050 1300 DEVIATION (mm) ±30 ±30 ±30 ±30 ±30

DETAIL OF 1X2 WAY 110mm DIA uPVC DUCT BANK DETAIL OF 2X2 WAY 110mm DIA uPVC DUCT BANK DETAIL OF 2X3 WAY 110mm DIA uPVC DUCT BANK DETAIL OF 2X4 WAY 110mm DIA uPVC DUCT BANK DETAIL OF 2X5 WAY 110mm DIA uPVC DUCT BANK TYPICAL DETAILS FOR LOW VOLTAGE DISTRIBUTION PILLAR

N1 ISSUED FOR CONSTRUCTION 22/12/2024


N0 ISSUED FOR CONSTRUCTION 28/11/2024
REV. REASON FOR ISSUE DATE
PROJECT

AMAALA STAFF VILLAGE


STAFF PASSENGER
INTERCHANGE TERMINAL

BUILDING NAME N/A

PLOT NUMBER N/A

DRAWING TITLE

LOW VOLTAGE NETWORK


STANDARD DETAILS (01 OF 02)

MODEL FILE REFERENCE


N/A
DRAWN BY CHECKED BY APPROVED BY

HAF GCD MSC


PROJECT NO. ISSUE DATE SCALE AT ISO A1

1RI12078 22/12/2024 N.T.S


DRAWING NUMBER REVISION
1RI12078-078D08-SAP-00-XX-DWG-LV-50001 N1

You might also like