The document outlines the Health, Safety, and Environmental (HSE) policies and responsibilities for the Main Stormwater Connection project. It includes a list of mandatory and optional safety topics covered during the HSE induction, as well as the responsibilities of the Construction Manager in managing HSE activities. The document requires acknowledgment of training and compliance with site safety regulations.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views2 pages

CM Induction

The document outlines the Health, Safety, and Environmental (HSE) policies and responsibilities for the Main Stormwater Connection project. It includes a list of mandatory and optional safety topics covered during the HSE induction, as well as the responsibilities of the Construction Manager in managing HSE activities. The document requires acknowledgment of training and compliance with site safety regulations.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT NAME: Main Stormwater Connection from the Free Zone – Al Falah to the Mainline on E11

Contract No: DMT-CR-066-2025

EMPLOYER NAME:
EMPLOYEE NAME:
DESIGNATION:
DATE:
STATUS:  Staff  Sub-Contractor
 Worker  Visitor

TOPICS COVERED
1 HSE Policy ✔ 19 No Smoking Policy ✔
2 Project Information ✔ 20 Ladders ✔
3 First Aid Procedure ✔ 21 Cranes /Hoist ✔
4 Fire Protection ✔ 22 Excavation ✔
5 Site Specific Hazards ✔ 23 Dewatering ✔
6 Emergency Preparedness ✔ 24 Openings ✔
7 Personal Protective Equipment ✔ 25 Overhead / Underground Services ✔
8 Public Safety ✔ 26 Electrical Safety ✔
9 Substance Hazardous to Health ✔ 27 Air Driven Equipment / Tools ✔
10 Health & Welfare Facilities ✔ 28 Hand Tools ✔
11 Housekeeping/Tidiness ✔ 29 Cutting Tools& Abrasive Wheels ✔
12 Storage ✔ 30 Welding Equipment ✔
13 Manual Handling ✔ 31 Compressed Cylinders ✔
14 Confined Space Safety ✔ 32 Site Fencing / Security ✔
15 Safety Signs ✔ 33 Supervision/HSE Officer ✔
16 Barriers ✔ 34 Environment Safety ✔
17 Scaffolding / Working Platforms ✔ 35 Covid-19 Controls ✔
18 Notice Boards ✔ 36 Others: 
Note: Topics in bold are mandatory to be given; select other topics relevant to the project stage.
By signing below, I confirm that I have received Safety "HSE" Induction and I will be abiding by the
Declaration: site safety "HSE" rules and regulation at all times.
ACKNOWLEDGEMENT OF TRAINING

Employee ID. Number:

Employee IND. Number:

Employee CONT. Number:

Employee’s Signature:

Instructor’s Name:

Instructor’s Position:

Instructor’s Signature
HSE RULES AND RESPONSIBILITIES
Construction Manager

The Construction Manager has the following responsibilities, accountabilities, and


activities concerning Health, safety and environmental management.

His Responsibilities are:

➢ Accountable for ongoing development and implementation of project HSE


activities and HSE practices during the project
➢ Specify and make available resources to enable execution of the HSE activities,
➢ Ensure participation and involvement of all employees
➢ Select and delegate HSE assignments to line managers
➢ Arrange and conduct regular sub Contractors’ HSE reviews
➢ Monitor effectiveness of the HSE induction and training processes
➢ Monitor incident/hazard reports

His Activities are:

➢ Involvement and attendance at HSE meetings


➢ Review and discuss incident/hazard reports
➢ Review and raise HSE training requirements
➢ Review work planning and hazard analysis requirements
➢ Consult with HSE team on HSE promotional concepts
➢ Determine balance between HSE and workload and develop appropriate
interventions.
➢ Motivate supervisors and HSE personnel via positive discussion on HSE initiatives.

NAME -----------------------------------------------------------------------------------------------

INDUCTION NUMBER -----------------------------------------------------------------------------