COMMENTS AND RESPONSES SHEET (CRS)
Doc. No. and Rev.: BD-004170 R1 - B WF-005374 Total Number of Comments: 5
Contractor Doc ID: Number of comments Closed: 0
Document Title: Builder Work and Electrical Conduit Arrangement in Wall Number of comments Open: 5
Result of Review (new status): B - Accepted Except as Noted Return Date: 5-Nov-23
Ref. Comments Doc. Comments PMO Response Contractor
No. Page Section Rev. Date Initials Date Initials Response Status
1 SEVERAL DEFICIENCIES IN DRAFTING 14/11/2023 MM Noted Open
2 All Opening shown on the drawings are found acceptable 14/11/2023 MM Noted. Open
3 The sleeves for earthing conductors within the DC halls shall be shown 14/11/2023 MM Please be notified that, these opening are already shown Open
on this drawing
4 Capacity of cables shall be same as cable trench, provide 9 conduits 14/11/2023 MM Please be notified that, the capacity of the cable trench Open
is tha same as cable ducts, also the depth of the duct
(IL) will not be matching with the Cable trench depth (IL)
in case one more conduit layer is added, further, it will
be further detailed in the Cable trench civil drawing,
while the objective of this drawing is the wall
penetration.
5 Trench covers shall be heavy duty 14/11/2023 MM Noted Open
10
11
Page 1 of 1