This is to certify that this Industrial Training Report prepared and submitted on .. is the bonafide work carried out by Mr.C.Govardhan, bearing Pin 09001-C-008 of third year DCE (200912) along with the batch mates in partial fulfillment of the requirement of the award of DCE of State Board of Technical Education and Training, Andhra Pradesh, during the academic year2009-12.
Guide
External Examiner
PRINCIPAL
1) Brief history 2) Object, Necessity and Utility of the Project 3) Topography of the site 4) Geographical Particulars of the area 5) Climatic conditions in the locality 6) Cost of development 7) Equipment selection 8) Availability of materials 9) Availability of labour 10) Availability of water 11) Availability of power 12) Availability of transportation and accommodation 13) Local bylaws and regulations 14) Plans 15) Estimations 16) Data/ Lead Statement
INTRODUCTION
In view of curriculum of C 09 SBTET, there is industrial training in III rd year. As a part of above we have under industrial tanning in the period of May 15 to November 18 after completion of the training we have experienced a lot we are submitting our experiences which we have gained from this industrial training during the course of the six (6) months.
We have under gone the training in well experienced company namely ANDHRA PRADESH RAJIV SWAGRUHA CORPORATION LIMITED. Headed by MRS.SHALINI MISHRA,IAS. Who made this training successful with the cooperation of our lecturer Sri RAMESH Sir and guided us in the right years to be which we have to improve.
When we went for the training we learned about the brick work. From there we learnt about the process of construction of roads, retaining walls, writing the measurement books, quality inspection checking, bar bending schedule for steel, laying of drainage, plastering, water supply pipes etc.,
The sites selected are strategically located and the extent varies as per the demand and future extension. The Corporation prepares thematic townships, engaging Architects, and invites bids on e-procurement platform. Detailed survey together with contour survey is done. Keeping in view the lie of the land, blocks are placed. The principles of vaasthu are kept in view while orienting the buildings. They are basically oriented towards East and North to have good natural light and ventilation. The architects while designing the layouts are asked to keep the local architecture in view and accordingly design the layout or houses. Entire residential development is proposed as a gated community. Adequate road widths 18 m or 24 m are planned as the main traffic corridors leading to the various precincts. Internal road network within each precinct is by means of 9 m and 7 m wide driveways. A 2 m wide green corridor is proposed all round the layout and is mandatory. Club house, Shopping malls, Schools also form part of the layout. The club houses are proposed next to the main entrance and will have multipurpose hall, swimming pool, and tennis court, party lawns an ideal place for leisure and social parties / gatherings. Amphi theatres are also proposed for community integration and socializing. Convenient shopping is near the club house to cater to the daily needs of the inhabitants. Central landscaped cores (open areas and tot lots) within each project are proposed and thus an attempt is made to procure the nature in urban settings. In other wards soil conservation measures are integral part of the layout planning.
Eco friendly features like solar water heating systems, solar lighting and piped gas supply are also considered in the planning. Rain water harvesting measures are contemplated. A centralized underground distribution system for the data cables, cable TV and Internet cables and telecommunications lines is provided. A sewerage treatment plant is proposed for the treatment of the sewerage and disposal. The recycled water will be used for landscaping purposes. The integrated townships so developed under Rajiv Swagruha will have high quality infrastructure, clear title and good quality construction assuring planned community living. However the sizes of these colonies / townships will depend upon the demand. All townships / colonies will be developed in approved layouts only with all four categories of flats / houses as per demand.
: classic
(kcp constructions)
Categories of Flats:
Sl # 1 2 3 4 5 Category Classic-3 BHK Intrinsic-2 BHK Basic-2 BHK Civic-1 BHK Senior citizens Total flats No of Blocks 09 08 09 08 01 No of flats 486 576 972 756 100 2890 Flats 1487 Sft. 1141 Sft. 798 Sft. 545 Sft. 616 Sft Cost (in lakhs) 33.20 25.50 17.75 11.35 14.40
Geological survey of India on south side and neighboring houses on west side.
TOPOGRAPHY OF SITE:
Adjacent to Geological survey of India, Bandlaguda Radial Road joining inner and outer ring road 13 Km from Secunderabad station 2 km from LB Nagar Ring Road and Nagole X Road 5 Km from Uppal Ring road 7 Km from Dilsukhnagar Near to Kamineni Hospital, LB Nagar Inner Ring 2 Km & Outer ring Road 8 Km Near to Bandlaguda Bus Depot (Under construction)
EQUIPMENT SELECTION
CORE SPECIFICATIONS Flats Framed Structures Walls Double Bed Room flat of 685.50 SFT - 900 units of G+9 pattern. Foundation, Footings, Pedestals, Columns on plinth beam, roof beam and slab. Cement plastering sponge finish.
Doors
Main Door with medium teak wood frame and other doors with CRCA frame & flush door shutters with Teak Veneer finish. Bathroom doors with PVC frame and shutter. NCL or equivalent Eco series windows with glass & grills.
Windows
Main Walls: Ceramic tiles of Kazaria / Johnson, Toilets: Non-skid ceramic tiles of Kazaria / Johnson, Corridors & Staircase: Polished Shahabad stones
Colouring on Altek superfine (Luppum with Plastic Internal Walls Emulsion Paint). & Ceiling Altek harmoney acrylic Emulsion Paint Colouring on (External Grade). External Walls
Bathroom tiles dadooing: With colour glazed tiles upto 6\'6\" (i.e. upto lintel level)
Kitchen
Polished granite platform steel sink, Dadoing with strip tiles up to door level and provision for exhaust fan.
RCC
Core Structure Vibrated Reinforced Cement Concrete with Framed Structure. Super Structure Fly-ash brick masonry. Internal walls-Altek Lappam finish, External walls-Acrylic emulsion, Main door-Melamine polish / glossy / matt finish, Other doorsSynthetic enamel paint, Iron worksSynthetic enamel paint, Iron worksSynthetic enamel paints.
Painting
Toilets
Kajaria / Johnson or equivalent glazed tiles upto door level and non-skid tiles for flooring. Provision for exhaust fan, IWC & EWC with flush tanks. Quality PVC sanitary pipes with Jaquar-Make fittings.
Plumbing
Electrical
Concealed wiring with adequate lights, fan points 6A/16A power points and mini modular switches. Concealed T.V., telephone & internet provision in bedrooms, living room. DB\'s with MCB isolators.
AVAILABILITY OF MATERIALS:
The materials are available around the site within the locality; the project materials are procured from local suppliers with low cost comparisons in the Hyderabad surrounding areas and also material management smoothly conducted by project contractors, some materials are imported from other states, Viz., Door shutter from Kerala, MS frames from Pune, Plumbing materials from Mumbai and Chennai, sand from Vijayawada and karimnagar, ultratech cement from Bangalore, Otis lifts from Bangalore, and nirali sink from Maharashtra.
AVAILABILITY OF WATER:
The plenty of water is available to the site from Krishna River. it connected each floor and connected with water sumps with over head tanks and also availability of water for 24 hours for drinking and usages regularly. The APRSCL also connected sump in the site. The sump can store the water up to 60 lakhs.The sump water can be utilized for 3 days to 2890 flats when it is fully stored. The ground water is available about 300 ft down from the Ground level.
AVAILABILITY OF POWER:
The power is available from the Anandhnagar substation (33/11 kV). The substation is adjacent to SAHABHAVANA project. The power is also available from the generators in case of power cut. Classic,Intrinsic,Basic are provided with each transformer for a block. Civic is provided with one transformer for two blocks. Three phase supply is provided for classic,intrinsic,basic.Civic is provided with one phase supply.
AVAILABILITY OF LABOUR:
The labour is availability in the local areas. About 2000 labours are working in the project. Accommodation facilities are also provided to some of the labours especially who are from other states. The money will be given to the labour as per SSR (standard schedule rates). Company labour are from uttarpradesh, rajasthan, Mumbai.
AVAILABILITY OF ACCOMODATION:
The construction companies had provided accommodation facilities to the labour within the site. Accommodation facilities are also provided for supervisors and engineers.
CREATING LANDMARKS:
No Common walls for Classic and Intrinsic Vaasthu Compliant Landscaped open spaces 80 wide approach road Internal Road network 30 Green Building ECO Friendly & Pollution free green Gated Township Open to sky from 3 sides 2 meter wide green corridor around the Boundary Piped Gas Supply Solar Water Heater
Avenue Plantation Avenues are lined with green plants and trees. Parks, Play grounds Children park and other recreation facilities are provided Shopping Malls Commercial shopping complexes are allowed to be built inside the site to facilitate
LOCAL BUY LAWS AND REGULATIONS HIGH-RISE BUILDING Means A Building 18 Meters Or More In Height. However,
Chimneys, Cooling Towers, Boiler Rooms/Lift Machine Rooms, Cold Storage And Other Nonworking Areas In Case Of Industrial Buildings And Water Tanks, And Architectural Features In Respect Of Other Buildings May Be Permitted As A Non-High Rise Building. Buildings Less Than 18 Including Stilt Floor/Parking Floor Stand Excluded From The Definition Of High-Rise Buildings.
The parking spaces should be efficiently designed and clearly marked and provided with adequate access, aisle, drives and ramps required for maneuvering of vehicles. Stilt floor/ sub-basement /Cellar parking floor shall be used only for parking and not for any habitation purpose. Misuse of the area specified for parking of vehicles for any other use shall be summarily demolished / removed by the Enforcement Authority. In respect of Apartment Complexes / Building / Block, insides up to 750 sq m the Parking requirement shall be deemed to be met if the entire stilt floor is left for parking. A WC / Toilet facility shall be provided for watch and ward in the stilt floor. For parking spaces in basements and upper storeys of parking floors, at least two ramps of minimum 3.6 m width or one ramp of minimum5.4 m width and adequate slope shall be provided. Such ramps may be permitted in the side and rear setbacks after leaving sufficient space for movement of fire-fighting vehicles. Access to these may also be accomplished through provisions of mechanical lifts wherein the height of the parking floor up to 4.25 m is allowed.
Height of building
Up to 21 mt. 12.2 7 Above 21 mt. & upto 24 mt Above 24 m & up to 27 m Above 27 m & upto 30 m Above 30 m & up to 35 m Above 35 m & upto 40 m Above 40 m & up to 45 m Above 45 m & upto 50 m Above 50 m
Upto 10 mts Above 10 mts. & upto 12 mts Above 12 mts. & below 18 mts. Above 18 mts .
2m 3m 6m
As per alround set-backs required under High Rise Buildings given in the above table.
CONCLUSION
We are thankful for providing us the industrial training. It is very useful to us to know how to handle the different kind of the problems and how to solve the problems which are going to arise in the practical field. We have learnt a lot from this training we are very glad to tell that this will be veryuseful to other students for their futures. It is very good because we are learning and gaining the experience in the same academic year without any further wastage of time and money.