Radiogram No. 5503u Form 24 for 06/11/07


JOINT FLIGHT DAY TWO
GMT CREW ACTIVITY
13:10-13:20 . Morning inspection
13:20-13:50 . Post-sleep
FE-1,FE-2,FE-2-
13:50-14:40 BREAKFAST
15
13:50-14:35 CDR BREAKFAST
14:35-14:40 CDR HAM radio powerdown in FGB
FE-1,FE-2,FE-2-
14:40-14:50 Prep for Work
15
14:40-14:45 CDR BREAKFAST
14:50-15:05 . Daily Planning Conference (S-band)
15:05-15:25 FE-2-15 Prep for Work
15:05-15:30 FE-2 EVA - pause/pre-breathe/hatch closure
15:05-15:30 CDR Prep for Work
15:10-16:45 FE-1 S3S4 Installation
15:25-15:30 FE-2-15 SLEEP - Donning Actiwatch Device (FE2)
Set up the first Orlan battery pack 825М3 for discharge and start
15:30-15:40 CDR
discharging the first pack
15:30-15:35 FE-2-15 CGBA 4 Status Check
15:40-16:20 CDR Filling EDV [KOB] for Elektron
15:50-17:20 FE-2 EVA Prep
СОЖ maintenance. Transfer condensate from CWC to EDV through filter
16:20-17:00 CDR
EDV condensate processing using Condensate Feed Unit [БПК]
16:55-17:15 FE-1,MS1 SSRMS Maneuver to Ready-To-Latch Position
17:00-17:20 CDR Grab Sample Container (GSC) ops
17:15-17:25 FE-2-15 SSAS First Stage Capture
17:20-17:35 FE-2 EMU purge
17:20-17:30 CDR FMK deployment ops
17:25-17:30 FE-1,MS1 SSRMS Maneuver to Limp Mode
17:30-17:45 FE-2-15 SSAS Third Stage Capture
17:35-18:25 FE-2 Pre-breathe before EVA
17:45-19:15 CDR Physical Exercise (TVIS) Day 2
17:45-18:25 FE-2-15 S1S3 and SSAS Bolting
17:45-18:00 FE-1 Taking readings from АОК ГАНК-4М gas analyzer
18:25-18:40 FE-1 Ungrapple S3S4
18:25-18:55 FE-2 Crew Lock depress
18:40-19:15 FE-1 SSRMS parking
CDR,FE-1,FE-2-
19:15-20:15 LUNCH
15
19:15-19:40 FE-2 SSRMS EVA1 support
19:40-20:40 FE-2 LUNCH
20:15-20:45 FE-1,FE-2-15 Sokol Space Suit leak check
20:15-21:45 CDR EVA tool stow, update IMS
20:45-21:00 FE-1 Drying Sokol Space Suits
Page 2 of 2
20:45-22:20 FE-2,FE-2-15 Crew Handover
21:00-21:45 FE-1 EVA tool stow, update IMS
21:45-22:45 CDR Physical Exercise (VELO) day 2
21:45-23:15 FE-1 Physical Exercise (CEVIS) day 2
22:20-23:20 FE-2 Physical Exercise (TVIS)
22:20-00:50 FE-2-15 ISS Crew Adaptation
23:15-00:35 CDR EVA tool stow, update IMS
23:15-23:20 FE-1 Terminate Sokol suit and glove drying
23:20-00:20 FE-2 Prep for Work
23:20-00:40 FE-1 EVA tool stow, update IMS
00:20-01:20 FE-2 Physical Exercise (CEVIS)
00:35-01:15 CDR IMS update
00:40-00:55 FE-1 Sokol Space Suit closeout ops, stow in Soyuz Orbital Module
00:50-01:05 FE-2-15 Questionnaire - first journal entry
00:55-01:55 FE-1 Physical Exercise (VELO) day 2
01:05-01:10 FE-2-15 CGBA 4 Status Check
01:10-01:25 FE-2-15 Private Medical Conference (S-band)
01:15-01:45 CDR Prep for Work
01:20-01:40 FE-2 Daily Food Prep
01:25-02:25 FE-2-15 Prep for Work
01:40-03:00 FE-2 Crew Lock ingress. Joint Airlock Ops Post EVA, start METOX regeneration
01:45-01:50 CDR DCS battery charging
01:50-02:10 CDR Prep for Work
02:05-02:10 FE-1 Transfer TVIS/RED/CEVIS/HRM data to MEC
02:10-02:15 CDR EVA photo downlink
02:10-02:25 FE-1 Prep for Work
Terminate discharging the first Orlan Battery Pack 825М3 and start
02:15-02:25 CDR
discharging the second Battery Pack
CDR,FE-1,FE-2-
02:25-02:40 Daily Planning Conference (S-band)
15
CDR,FE-1,FE-2-
02:40-03:10 DINNER
15
03:00-03:40 FE-2 DINNER
CDR,FE-1,FE-2-
03:10-03:40 Daily Food Prep
15
CDR,FE-1,FE-2-
03:40-04:40 Pre-sleep
15
03:40-03:50 FE-2 IWIS. Dismantling RSU in SM.
03:50-04:40 FE-2 Pre-sleep
04:40-13:10 . SLEEP
Note: See OSTP for references to US activities.
End of Radiogram