You are on page 1of 19

INTRODUCTION

NAME:- ROHAN RAJARAM BARVE.


ROLL NO.:- 704808
ORGANISATION:- CONRAT ENGG.LTD.
TYPE OF PROJECT:- INDUSTRIAL
BUILDING.
INSTITUTE SUPERVISOR:- Mr.
PURUSHOTTAM DANGE.

PLASTERING

PLASTERING IS A PROCESS OF
COVERING OF MASONARY SURFACE
& RCC STRUCTURE WITH ANY
PLASTIC MATERIAL SUCH AS
CEMENT MORTAR OR LIME MORTAR.

EXTERNAL PLASTERING

MATERIAL

CEMENT
SAND
WATER
CHICKEN MESH
FIBER MESH

TOOLS

Mortar pans (Ghamelas)


Spade (Phavadas)
Chisels (Chinni)
Hammer
Trowel (Thapi)
P.V.C. Water level tube
Wooden float (Randha)
Metal float (Tipni)
Right angle , small & big
Measuring tape
Nylon strings (Line dori).
Plumb bob (olamba).
Scaffolding material like bamboos, planks, kathya, M.S.
chairs,
wedges etc.
Measuring boxes for measuring sand.

CHECKLIST BEFORE EXTERNAL


PLASTERING

ENSURE ALL MASONARY


WORK & SCAFFOLDING
WORK IS COMPLETE.
ALL WINDOWS, DOOR
FRAMES TO BE CHECKED
FOR LINE, LEVEL, PLUMB,
POSITION & SIZES.

METAL NO. 2 IS FIXED TO


ALL VERTICAL AND
HORIZONTAL JOINTS OF
RCC & MASONARY WALL.
CHIP OFF UNWANTED
PORTION IN RCC &
MASONARY, BEFORE
STARTING THE
PLASTERWORK.
CHECK WHETHER
HACKING TO CEILING,
BEAMS, COLUMNS IS
SUFFICIENT OR NOT.
(Min=500 nos/m2)

EXTERNAL PLASTERING

1.

2.

EXTERNAL
PLASTERING IS
APPLIED IN TWO
COATS:1ST COAT HAVING
THICKNESS 12 15
mm.
2ND COAT HAVING
THICKNESS
6 -8 mm.

The cement mortar


mix for the first
coat is 1:4

The cement mortar


mix for the second
coat is 1:4

PROCEDURE
1)SCAFFOLDING
2)SAFETY

PLUMB LINE IS TO BE
TAKEN FROM TOP TO
BOTTOM.
SURFACE IS WETTED
BEFORE ONE DAY OF
PLASTERING.
APPLIED CEMENT
SLURRY ON RCC
WORK JUST BEFORE
PLASTERING.

APPLYING OF 1ST COAT

ROUGHEN THE SURFACE WITH WIRE FOR


BETTER BONDING WITH 2ND COAT.

APPLICATION OF 2ND COAT IN C.M. 1:4.

ENSURE THAT ALL


CHAJJAS PROJECTION
SHOULD BE FINISHED
WITH DRIP MOULD AT
THE BOTTOM OF
CHAJJAS.

AFTER SECOND COAT


OF PLASTER
SCAFFOLDING
SHOULD BE REMOVE
STEP BY STEP.

CURING OF
PLASTERING SHOULD
BE DONE FOR
MINIMUM 7 DAYS.

CHECKLIST AFTER PLASTERING

Plumb
Line
Corner
Cutting
Electric points
Cleaning

RATE ANALYSIC

Rate for 10sq.m.


MATERIALS

Dry ingredients10*0.025*1.65=0.412Cu.mt
1)Cement=0.412*1/5*1/0.035
=2.34bags
2)Sand=0.412*4/5
=0.329Cu.Mt
Rate for external plaster=Rs 136/sq.mt.

THANK YOU