Professional Documents
Culture Documents
: . , -
O
.
1708 Umerloch
Andermatt, .
1847, 20 km
.
19
.
.
(
) St. Gotthard
200 . 1882
, , 1906, 3,3 km
Simplon, .
, (Gotthard Base Tunnel, GBT), 57 km,
2016,
.
2020 Ceneri.
Gotthard
13.
Reuss, .
100 , , 1980,
Gotthard.
.
GBT
() 550 m .
. GBT Altdorf (UR) Bellinzona (TI)
30 km.
Gotthard ( )
.
, ,
.
(bank engines),
- (shunting).
-
.
200 km/h,
250 km/h.
2016.
. 26
, 80% (transit).
.
Gotthard Base Tunnel ,
.
.
(, ) .
2.300 m, Gotthard Base
Tunnel, .
50 C,
!
Gotthard, ,
1882 , ,
-.
Wassen (Chileli
).
,
.
Gotthard
1882
Gotthard
1947
Amsteg Bodio
1963
1989
Ltschberg Gotthard/Ceneri
1992
(New Rail Link through the Alps, NRLA)
1996
1998
1999
2002
2007
2010
2016
2019/2020
GBT
: 57 km ( )
"" , 325 m
: 152 km
: 550 m
: 2,300 m
( ): 17
: 28,2
(NRLA)
Ltschberg, Gotthard Ceneri: CHF 18,2 ( 1998,
) - CHF 23 (21,2 )
: 260 65
( 180 )
: ETCS Level 2
, (
2019/2020): 45 min
, 23 , ,
(Gotthard Base Tunnel, GBT),
57 km.
(Saint-Gotthard
Massif). (Gotthard Rail Tunnel) 1881
(Gotthard Road Tunnel) 1980.
( Rotterdam-Basel-Genoa)
.
AlpTransit, (New
Railway Link through the Alps, NRLA), Ltschberg Base Tunnel
Bern Valais Ceneri Base Tunnel (
2020). GBT Gotthardbahn
Saint-Gotthard, 1882
, .
Uri Ticino,
Gotthard.
AlpTransit 1992 64%
1996. 15 2010
23 2011. AlpTransit Gotthard Ltd.
(SBB) 2016. 4
5 2016
850 ,
AlpTransit.
31 2014 ,
,
.
( ), (Bodio, Ticino)
(Erstfeld, Uri) Sedrun (Graubnden),
5 2016, ,
.
, 9,5 ,
,
.
( 800 m)
.
GPS,
. .
, 151,84 km.
2.600 .
,
.
.
,
. .
160 km/h,
250 km/h. 3 ,
. , ,
2016.
8
,
(TEN-T). : (2019), (2020),
(2023), (2024), (2025),
- (2029) (2025).
( km)
1.
2.
1-Initial
support; 2-Impermeable
layer; 3-Tunel arch
3.
Arch
drainage;
7-Base of cast-in-place concrete; 85.
Groundwater
collecting
6.
600 mm
9.
250 mm
10.
11.
12.
1.
2.
3.
4.
5.
6.
7.
8.
9.
( )
1999, 2.000
31.000.000 ton .
/ ( 235 m)
30 m.
30 m.
"" 29 2013.
700
Gotthard
Base Tunnel, 290 km!
. 31-10-2014
( " ", ) .
.
2015 , .
( )
( ).
, '