Professional Documents
Culture Documents
on MATLAB
HVDC Transmission
Range 220-765KV.
Distance it is used for
transmission is approximately
more than 800km.
(Breakeven analysis)
Needs
Increase in size of
generating units.
Right of way problem.
Line costs.
Loading limit.
DC Links
Monopolar link.
Bipolar link.
Homopolar link.
Monopolar link
Converter Station
Simulation Diagram
ADVANTAGES
System stability.
Lesser corona loss and radio
intereferance.
Greater reliabiliy.
Bulk power long distance
transmission.
Tower size and cost.
Disadvantages
Cost of converting station.
Reactive power
requirment.
Less overload capacity.
Loss in cooling system.
Absence of suitable circuit