You are on page 1of 12

Basic ESP Training

Introduction to Electrical Submersible Pump (ESP) System

Motor Controllers

Direct On Line (Switch Board)


Variable Speed (VSD, SWD, Varistar, Titans, Yasigawa,
Siemens, Electro Speed, GCS, Schneider..ETC).

Surface Equipments

Wellhead
Junction Box
Transformer
Amp Chart Recorder
3-Phase Choke

WellHead

The Wellhead is the equipment that is installed at the surface of the well bore.

Its purpose is: to suspend the


tubing string in the well, and to
monitor and control high
pressures conditions often
present within the well.

FROM
JUNCTION
BOX
SURFACE POWER
PLUG

PENETRATOR

WELL HEAD
CONNECTOR
ASSEMBLY

ATTACHABLE
CONNETOR
(ASSEMBLY)

STRAPPED
CABLE BAND

TUBING HANGER

O RING

PRODUCTION TUBING

POWER CABLE
FROM JBOX
GLAND NUT

WELL HEAD
PACK OFF
ASSEMBLY
O RING

RUBBER SEAL

METALSPLIT
RING

JUNCTION BOX

FUNCTION:
Ventilation for gas that possibly
comes up to surface through the
cable
Connection terminals, easier to
reverse motor rotation and to take
initial readings.
7

TRANSFORMER
The transformer sends the correct voltage
for designed surface voltage for the
proper motor operation.
This is based on power rating in KVA.

CORE

WINDING

DETERMINE TRANSFORMERS KVA

Sample :

Motor 180 HP/ 1000 V/ 103 Amp

PSD 3000 Ft, SBHT = 200F


Cable AWG -1, length 3100 Ft.
Voltage drop (from chart) = 24 Volts/ 1000 Ft

24

AWG #1

Total Volt drop = 24 x {(3100+100) / 1000)} =


76.8 Volts

103

Required surface voltage = 1000 + 76.8 = 1076.8 Volts


KVA

= (Surface Volt x Amps x 1.732) / 1000


= (1076.8 x 103 x 1.732) / 1000
= 192.1 KVA ----------> Choose 200 KVA (Minimum)

11

AmpChart Recorder

13

Current Transformer

14

You might also like