Professional Documents
Culture Documents
Pakpattan Degraded Patches Re Drive .: 3G Drive Test Report
Pakpattan Degraded Patches Re Drive .: 3G Drive Test Report
Pakpattan Degraded Patches Re Drive .: 3G Drive Test Report
> Internal
Only
> Internal
Only
ZTE
Corporation. All
reserved.
ZTE
Corporation.
Allrights
rights
reserved.
Patch 1
Slight Improvement observed after changes on site 5175_2 and 5921 _1 . This patch can not be improved
through 4869 due to low height of 1st and 3rd and Null factor . Changes and audit mentioned in slide # 9.
Patch 2
Improvement observed after changes on site 5989 _2 after small down tilting sector 2.
Patch 3
Improvement observed after changes on site 5989 _3 after changes azimuth 290 to 250 .
Patch 4
Slight Improvement observed after changes electrical tilt 4915_3 .Azimuth can not be changed due to 2G antenna blocking in front of 3G
antenna if changed 280 to 300 azimuth .Snap of antenna attached in next slide .
AS EC/No Patch
EC/No degraded patch has been improved after changes on sites through 5175 ,4869 and 5921 _1 .
Pre
Post
Azimuth
M.
Azimuth
Height
5175-2
220
220
43m
5989-2
150
150
43m
5989-3
290
250
43m
4915_3
280
280
41m
5921-1
60
NA
NA
50
42m
4869-1
60
60
29m
4869-3
290
290
23m
Site ID
Thank you