Site layout
The construction of a building can be considered
as production with temporary factory. The
building site being the factory in which the
building contractor will make the product on site
Site layoutcan be defined as site space
allocation for material storage, working areas,
units of accommodation, plant positions,
general circulation areas, and also access and
egress for deliveries and emergency services in
construction project.
2
Temporary facilities
Temporary facilities are needed to support the
construction process.
The arrangement of these facilities can improve
the productivity of construction process.
Some example of project temporary facilities:
Main office (direksi keet) & project fence
Fabrication area (steel, wood, schafold,etc.)
Lighting & pump for dewatering
Vertical transportation (Tower crane, Material
lift)
Worker basecamp, etc.
6
Main office
Main office is functioned as project office
for meeting /coordinating purpose.
Project offices area is depend on the
project scope.
Besides functioned as project office, some
main office (especially for commercial
building such as Trade centre, apartement)
is also functioned as marketing office.
Project fence
10
Worker Basecamp
11
Fabrication area
Fabrication areas are needed to fabricate
structural components, such as: steel,
timber, schafold, etc.
These areas are need to be placed near
the warehouse in order to short the
traveling distance.
Example of fabrication areas:
Steel fabrication area
Wood/ timber fabrication area
Schafold fabrication/ setup area
Other areas..
12
13
14
15
Mobile pump
16
Vertical transportation
Veritical transportation is used to transport
raw material vertically. There are several
type of vertical transportation device used
to be utilized in construction site:
Tower crane, mobile crane
Material lift
17
Tower crane
GroupTower Crane
18
Mobile crane
Dragline
MobileCrane
19
20
21
j
i
dij
dik
Where:
dij= traveling distance between
facility i to facility j
fij= worker movement frequenc
between facility i to facility
23
24
j
i
dij
dik
ZONE 1
ZONE 2
Where:
sij= safety condition between
facility i to facility j
fij= worker movement frequenc
between facility i to facility
Multi-objective function
Traveling distance (TD) function
26
Case study
100
Schafolding
fabrication
Worker
basecamp
80
1
MAIN
BUILDING
Tower
crane
ZONE 1
60
ZONE 2
40
Reinforcement
fabrication
15
Main office
Warehouse
0
0
10
50
70
80
100
27
Optimization calculation
Traveling distance (TD)
28
Pareto front
29
Practice